26.03.2013 Views

Foreword - East Central Railway - Indian Railway

Foreword - East Central Railway - Indian Railway

Foreword - East Central Railway - Indian Railway

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER – VII<br />

RIVERS AND FLOODS<br />

124<br />

701. Behaviour of Rivers<br />

702. Past History of Bridges<br />

703. Danger level at Bridges<br />

704. Watchmen at Bridges<br />

705. Duties and Equipment of Bridge watchmen<br />

706. Action to be taken by the Permanent way inspector at site<br />

707. Special Inspection during Monsoon<br />

708. Action to be taken in the case of weather warning<br />

709. Pitching stone, boulder and other monsoon reserves<br />

710. Floods Records<br />

711. Flood Records during monsoon<br />

712. Flood records after the monsoon<br />

713. Attention to damages<br />

714. Rivers and flood register<br />

715. Flood Reports<br />

716. Rainfall data<br />

717. Provision of Anemometer on Bridges<br />

CHAPTER - VIII<br />

RIVER TRAINING AND PROTECTION WORKS<br />

138<br />

801. Training/Protection of various type of Rivers<br />

802. Upper reaches (Mountainous Riverts)<br />

803. Submontane reaches (Foot hills)<br />

804. Quasi-Alluvial reaches (Trought)<br />

805. Alluvial reaches<br />

806. Tidal reaches/Deltaic regions<br />

807. South <strong>Indian</strong> Rivers<br />

808. River training works<br />

809. Guide Bunds<br />

810. Spurs (Groynes)<br />

811. Marginal Bunds<br />

812. Closure Bunds<br />

813. Assisted Cut-Offs<br />

814. Protection of approach banks<br />

815. Design of River training works through Model studies<br />

INDIAN RAILWAYS BRIDGE MANUAL x<br />

CONTENTS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!