Evaluation 2008 and prospects for <strong>2009</strong><br />

During 2008 duties of maintenance and preservation of the accreditation ISO 17025 have been carried.<br />

Weekly repeatability measurements and systematic calibration of the electronic devices have<br />

continued. The Round Robin test has been interrupted because of the rupture of the reference module<br />

during the measurement at TUV. A collaboration with different accredited laboratories to define a new<br />

systematic Round Robin programme will be initiated in <strong>2009</strong>. Reference modules of different technologies<br />

will be tested.<br />

In 2008 more than 6140 flashes were performed for research programmes (test centre and other projects),<br />

I-V measurements for third-parties and maintenance measurements.<br />

<strong>2009</strong> will be an intense year. SUPSI will set up a new laboratory in a new location for lifetime mechanical<br />

and security testing; covering IEC61215 and IEC61646 certification services. As a result,<br />

SUPSI will provide a new accreditation system, independent of LTS.<br />

The existing solar simulator will be moved to a new location. At the same, a spectrum radiometer and<br />

filters for the Spectral Response (SR) will be installed on the new simulator in Trevano. Thus, measurement<br />

tests for I-V in function of irradiance and STC measurements of Thin-Film modules will be<br />

accredited. Currently, an automated system for the filter positioning in front of lamps is being developed.<br />

The system with filters, devices and two modules for the uniformity measurement will be set in<br />

motion in <strong>2009</strong>. Following this, the new sun simulator functionality tests will be performed; effectuating<br />

uniformity and light spectrum verifications. After a testing period, the new simulator will be installed in<br />

the accreditation system ISO17025 for I-V measurements at STC.<br />

Concerning the flash spectrum for the pulsed solar simulators monitoring, we opted for a solution proposed<br />

from the collaboration of Ocean Optics (UK) and GMP (CH). The system is a composition of<br />

two CCD spectroradiometers , sensitive in ranges 200-1100nm and 900-1700nm, respectively. This<br />

solution leads to a better accuracy and wider wavelength range with respect to the case with a single<br />

spectroradiometer of the same technology. Some technical issues still need to be resolved by the<br />

manufacturer. In order to decrease spectral mismatch errors on thin-film measurement, 2 new filtered<br />

c-Si reference cells with a-Si and CdTe spectral responses have been purchased at ISAAC.<br />

A bias light measurement procedure for the maximum power determination of CI(G)S module at STC<br />

was introduced at ISAAC.<br />

In 2008 a new 15 months test cycle (no.11) began. The difficulty to retrieve the modules has not permitted<br />

to start the new cycle as estimated, moreover during the ligtht soaking of 60 kWh/m² was snowing,<br />

thus precluding the verification of the initial degradation (P0). During <strong>2009</strong> measurements of the<br />

third module of every one of the 13 modules in exam and comparison with the energy rating will be<br />

proceeded.<br />

The new stands for the measurement of comparison of the Energy rating dedicated for prototype of<br />

the industry will be finished and make available for the end of March <strong>2009</strong> for the long term ER measurements.<br />

To be operative on time it was decided to move the old plant of 10 kWp (currently on building<br />

B) in order to leave room for the new stands. Afterwards it will be reinstated on the new restored<br />

roof of building A.<br />

References<br />

[1] D.Chianese et al.: Rapporto BfE finale „Centrale di test ISAAC-TISO: periodo VII – 2003-2007”, 2007.<br />

[2] G. Friesen et al.: Rapporto BfE annuale 2008 „Performance, ISAAC activities”, n° 019718 EU: (SES6) – Integrated<br />

project, dicembre 2008.<br />

[3] D. Chianese, E. Burà, A. Realini: MPPT3000 multifunctional testing device for PV module, 23rd EPVSEC, Valencia<br />

(S), September 2008.<br />

[4] www.isaac.supsi.ch � ricerca � fotovoltaico.<br />

[5] I. Pola et al.: Rapporto BfE annuale 2008 „Analysis of Annealing and Degradation effects on a-Si PV Modules”,<br />

Centrale di test ISAAC-TISO, D. Chianese, SUPSI, DACD, ISAAC-TISO<br />

208/290<br />