TEST cycle 11<br />

In 2008 a new 15 months test cycle (no.11) began. Thirteen different module types were chosen, in an<br />

attempt to include the greater part of available technologies: 4 mc-Si (one with EWT backcontact), 3<br />

sc-Si, 1 HIT (new version), 1 a-Si/a-Si tandem module, 1 a-Si/µc-Si (micromorph) and 2 CIS.<br />

The anonymous purchase of only 3 modules has been more complex compared to the past, particularly<br />

various modules chosen at the beginning could not been purchased and it has been necessary to<br />

opt for other typologies.<br />

Verification of the delivered power (Pa):<br />

The difference between Power at Purchase (Pa) and Nominal Power (Pn) of the modules shouldn’t be<br />

greater than Production Tolerance (tp).<br />

Power (Pn), production tolerance (tp), warranties (w) given by the manufacturer, power at purchase<br />

(Pa) and differences are shown in Table 1.<br />

In test cycle 11 the power at the purchase of crystalline silicon technologies (including HIT) was on<br />

average -2.6% lower with respect to Pn but ranging from +0.5% and -10.5%. In 8 out of 27 cases,<br />

corresponding to three different module types, power at purchase was outside production tolerance<br />

(see Table 1). Possible reasons for this will be further investigated. Some seems to be more related to<br />

defects in the cells, whereas others could be related to manufacturer’s declarations or here not considered<br />

measurement problematic.<br />

Manufacturer Type Pn [W] Warranty Tolerance (%) Pa [W] � Pn<br />

153.0 -1.3%<br />

Advent Advent 155<br />

155<br />

--<br />

±3% 153.5 -1.0%<br />

154.1 -0.6%<br />

217.1 -1.3%<br />

Sunways SM 210U<br />

220<br />

10%/12y<br />

±3% 219.1 -0.4%<br />

213.3 -3.0%<br />

215.8 -1.9%<br />

SolarDay PX60<br />

220<br />

10%/10y<br />

±3% 218.3 -0.8%<br />

217.0 -1.4%<br />

173.5 -3.6%<br />

Day4 Energy Day4 48 180<br />

180<br />

10%/10y ±3.5% 176.7 -1.8%<br />

161.1 -10.5%<br />

132.2 -2.8%<br />

3-S Megaslate<br />

136<br />

--<br />

±5% 131.6 -3.2%<br />

130.9 -3.7%<br />

176.7 -4.5%<br />

BP Solar BP7185N<br />

185<br />

10%/12y +5%, 0 177.0 -4.3%<br />

177.3 -4.2%<br />

176.0 -2.2%<br />

Trina TSM180 DC01 180<br />

10%/10y<br />

±3% 178.1 -1.1%<br />

179.4 -0.3%<br />

142.1 -5.3%<br />

Isofoton IS-150S/24<br />

150<br />

10%/10y<br />

±3% 140.2 -6.5%<br />

142.4 -5.1%<br />

210.2 0.1%<br />

Sanyo HIP-210 NKHE1 210<br />

10%/10y +10%, -5% 210.7 0.3%<br />

211.0 0.5%<br />

73.3 -2.2%<br />

Würth WSG0036E075 75<br />

--<br />

+5%, -2% 72.8 -2.9%<br />

71.3 -4.9%<br />

48.1 -12.5%<br />

Sulfurcell SCG55-HV-F<br />

55<br />

10%/10y<br />

±5% 47.9 -12.9%<br />

48.7 -11.5%<br />

102.0 2.0%<br />

Sharp NA-851WQ<br />

100<br />

10%/10y ±10% 103.1 3.1%<br />

102.1 2.1%<br />

47.5 18.9%<br />

Bangkok Solar BS40<br />

40<br />

--<br />

±10% 45.8 14.4%<br />

53.9 34.7%<br />

Table 1: Comparison with nominal power and power at purchase of the modules in cycle 11.<br />

As for c-Si modules, thin-film devices were initially tested to verify the acquired power (see Table 1).<br />

In thin-film a-Si modules the given power is already stabilized. The stabilization of the performance of<br />

a module normally takes a few months and the verification is only possible when power is stabilized.<br />

Nevertheless, the initial power of the BS40 (Bangkok Solar) modules is up to 34.7% higher and at the<br />

planning stage the system has to work at higher power, current and voltage for a number of months.<br />

The micromorph a-Si/µc-Si modules of Sharp show an initial mean difference (Pa) of just +2.4% compared<br />

to the nominal power (Pn). The verification after the degradation at 3 months will indicate if the<br />

power will remain in between the warranty limits on the long term.<br />

Centrale di test ISAAC-TISO, D. Chianese, SUPSI, DACD, ISAAC-TISO<br />

206/290<br />

6/8