3/8<br />

Brief Description of the Project<br />

Expected Outcomes<br />

At present, Europe has a high level of PV research and development – both in qualitative and quantitative<br />

terms - contributing to a fast growing industry. Through its activities, PV ERA NET will establish<br />

a strong photovoltaic RTD programme network, thereby strengthening the individual programmes,<br />

their mutual links and their links to the EC programmes, the industry and other organisations.<br />

It is expected that PV RTD programmes will commonly and mutually improve coherence, efficiency<br />

and effectiveness thanks to increased coordination and cooperation level and quality. Striving for excellence<br />

and building on the most successful approaches, PV ERA NET will thus ultimately contribute<br />

to strengthen the position of the European RTD and market in the world-wide context.<br />

By systematically addressing the important interfaces with other key technology areas (e.g. materials<br />

RTD, nanotechnology, photochemistry, molecular chemistry, etc.), those related to production and<br />

applications (e.g. grid interconnection, building integration, etc.) as well as those with other (renewable<br />

and other) energy technologies (e.g. intermittency, hybrid use, storage, etc.), PV ERA NET will identify<br />

subjects for further interaction, aiming at opportunities for stronger cooperation between different technology<br />

areas.<br />

Operational Level<br />

The networking activities are subdivided into three major, logically sequenced work packages, plus a<br />

work package for the coordination and management of the networking activities.<br />

The first two work packages “Information Exchange and Best Practice” and “Strategy Issues” build the<br />

common ground for joint (transnational) activities between national / regional programmes. The third<br />

work package “Joint (Transnational) Activities” is about preparing, e.g. by developing schemes, and<br />

actually implementing “real” joint transnational activities. This work package comprises a set of concrete<br />

joint (transnational) activities and asks for the most important, dynamic and continued efforts.<br />

Figure 2: The set-up of the work packages of PV ERA NET reflects the stepping-up of the levels of<br />

coordination and cooperation. The scale at the bottom indicates the project duration in months (since<br />

Oct 2004).<br />

Accordingly, the activities and objectives specific to the work packages are:<br />

WP1: Information Exchange and Best Practice: The main activity was in the first year of the project,<br />

to improve the information and communication and, subsequently, build trust among programme managers<br />

and, second, to exchange experience on good practice. Information was about photovoltaic<br />

RTD programmes - their contents, approaches and context - in participating programmes. Country<br />

reports and survey reports with condensed information on horizontal issues as well as workshops<br />

allowed for improving mutual knowledge of each other’s programmes. The work done provides some<br />

ground for the work on Strategy Issues (WP2) and Joint (Transnational) Activities (WP3).<br />

The main goal was to provide structured information exchange and to exchange experience on good<br />

practice in photovoltaic RTD programming<br />

PV ERA NET, S. Nowak, NET Nowak Energy & Technology Seite 283 von 288