Brief Description of the Project<br />
Expected Outcomes<br />
At present, Europe has a high level of PV research and development – both in qualitative and quantitative<br />
terms - contributing to a fast growing industry. Through its activities, PV ERA NET will establish<br />
a strong photovoltaic RTD programme network, thereby strengthening the individual programmes,<br />
their mutual links and their links to the EC programmes, the industry and other organisations.<br />
It is expected that PV RTD programmes will commonly and mutually improve coherence, efficiency<br />
and effectiveness thanks to increased coordination and cooperation level and quality. Striving for excellence<br />
and building on the most successful approaches, PV ERA NET will thus ultimately contribute<br />
to strengthen the position of the European RTD and market in the world-wide context.<br />
By systematically addressing the important interfaces with other key technology areas (e.g. materials<br />
RTD, nanotechnology, photochemistry, molecular chemistry, etc.), those related to production and<br />
applications (e.g. grid interconnection, building integration, etc.) as well as those with other (renewable<br />
and other) energy technologies (e.g. intermittency, hybrid use, storage, etc.), PV ERA NET will identify<br />
subjects for further interaction, aiming at opportunities for stronger cooperation between different technology<br />
areas.<br />
Operational Level<br />
The networking activities are subdivided into three major, logically sequenced work packages, plus a<br />
work package for the coordination and management of the networking activities.<br />
The first two work packages “Information Exchange and Best Practice” and “Strategy Issues” build the<br />
common ground for joint (transnational) activities between national / regional programmes. The third<br />
work package “Joint (Transnational) Activities” is about preparing, e.g. by developing schemes, and<br />
actually implementing “real” joint transnational activities. This work package comprises a set of concrete<br />
joint (transnational) activities and asks for the most important, dynamic and continued efforts.<br />
Figure 2: The set-up of the work packages of PV ERA NET reflects the stepping-up of the levels of<br />
coordination and cooperation. The scale at the bottom indicates the project duration in months (since<br />
Oct 2004).<br />
Accordingly, the activities and objectives specific to the work packages are:<br />
WP1: Information Exchange and Best Practice: The main activity was in the first year of the project,<br />
to improve the information and communication and, subsequently, build trust among programme managers<br />
and, second, to exchange experience on good practice. Information was about photovoltaic<br />
RTD programmes - their contents, approaches and context - in participating programmes. Country<br />
reports and survey reports with condensed information on horizontal issues as well as workshops<br />
allowed for improving mutual knowledge of each other’s programmes. The work done provides some<br />
ground for the work on Strategy Issues (WP2) and Joint (Transnational) Activities (WP3).<br />
The main goal was to provide structured information exchange and to exchange experience on good<br />
practice in photovoltaic RTD programming<br />
PV ERA NET, S. Nowak, NET Nowak Energy & Technology Seite 283 von 288