Programm Photovoltaik Ausgabe 2008 ... - Bundesamt für Energie BFE
Programm Photovoltaik Ausgabe 2008 ... - Bundesamt für Energie BFE
Programm Photovoltaik Ausgabe 2008 ... - Bundesamt für Energie BFE
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PERFORMANCE<br />
ISAAC ACTIVITIES<br />
Annual Report 2007<br />
Eidgenössisches Departement <strong>für</strong><br />
Umwelt, Verkehr, <strong>Energie</strong> und Kommunikation UVEK<br />
Office fédéral de l’énergie OFEN<br />
Author and Co-Authors Gabi Friesen<br />
Institution / Company SUPSI, DACD, ISAAC-TISO<br />
Address Via Trevano, 6952 Canobbio, Switzerland<br />
Telephone, E-mail, Homepage +41 058 666 63 57, gabi.friesen@supsi.ch, http://www.isaac.supsi.ch<br />
Project- / Contract Number n° 019718 EU: (SES6) – Integrated project<br />
Duration of the Project (from – to) 01.01.2006 - 31.12.2009<br />
Date December 2007<br />
ABSTRACT<br />
The PERFORMANCE project, started in January 2006, is a 4 year project of the 6 th European<br />
Framework programme. It covers all pre-normative aspects from photovoltaic module to system level<br />
and from instantaneous device characterisation and system measurement to their life-time performance<br />
prediction and assessment. The limitations of current indoor and outdoor calibration measurement<br />
technology will be investigated and precision will be improved, covering current technologies as<br />
well as new and advanced cell and module concepts. Methods will be developed to connect from<br />
measurements of module power to module energy production. In a third pillar, methodologies for the<br />
assessment of the life-time performance of PV modules will be developed. Based on all these work<br />
packages, a modelling and analysis programme will provide the analytical understanding of PV performance<br />
in the broad and systematic manner mentioned above. Following this work programme, the<br />
project will produce a consistent set of measurement and modelling methodologies to create the<br />
transparency needed for the European market and industry. Next to this significant scientific effort,<br />
intense involvement of all European companies along the value chain will be organised systematically<br />
through feedback loops. Project results will be fed directly into standardisation processes on<br />
CENELEC and IEC level. The project is divided into 8 sub-projects:<br />
SP1 Traceable performance measurement of PV devices<br />
SP2 Energy delivery of photovoltaic devices<br />
SP3 PV system performance evaluation<br />
SP4 Modelling and analysis<br />
SP5 Service life assessment of PV modules<br />
SP6 PV as a building product<br />
SP7 Industry interaction and dissemination<br />
SP8 Standardisation processes<br />
The ISAAC institute is official partner of SP1, SP2 and SP4 and collaborates in SP6. Moreover it’s<br />
work-package leader of SP4.4 entitled “Annual Energy Rating Production and Device Comparator”.<br />
The scope of this report is to present the institute activities of the second project year.<br />
General information about the project can be found under http://www.pv-performance.org<br />
Seite 169 von 288