This page intentionally left blank. Executive Summary x
TABLE OF CONTENTS EXECUTIVE SUMMARY................................................................................................................................ i ACRONYMS AND ABBREVIATIONS ...................................................................................................... xvii SECTION ONE: MISSION, PURPOSE AND NEED, BACKGROUND INFORMATION ............................... 1 1.1 Introduction..................................................................................................1 1.2 Wallops Flight Facility ................................................................................1 1.2.1 Mission............................................................................................ 1 1.2.2 Environmental Management System .............................................. 2 1.2.3 Location .......................................................................................... 2 1.3 Background..................................................................................................2 1.3.1 Current WFF Energy Sources......................................................... 5 1.4 Purpose and Need for the proposed action ..................................................5 1.4.1 Purpose............................................................................................ 5 1.4.2 Need ................................................................................................ 6 SECTION TWO: PROPOSED ACTION AND ALTERNATIVES ................................................................... 7 2.1 Range of Alternatives Considered for Renewable Energy ..........................7 2.1.1 Wind Power .................................................................................... 7 2.2 Alternatives Considered and Dismissed ....................................................18 2.3 Proposed Action and Alternatives .............................................................21 2.3.1 Proposed Action: Utility-Scale Wind Turbines and Residential- Scale Wind Turbines..................................................................... 21 2.3.2 Alternative One: Utility-Scale Wind Turbine, Residential-Scale Wind Turbines, and Solar Panels.................................................. 27 2.3.3 Alternative Two: Residential-Scale Wind Turbines and Solar Panels ............................................................................................ 28 2.3.4 Comparison of Costs Among Alternatives ................................... 28 2.4 No Action Alternative................................................................................29 SECTION THREE: AFFECTED ENVIRONMENT....................................................................................... 31 3.1 Physical Environment ................................................................................31 3.1.1 Land Resources............................................................................. 31 3.1.2 Water Resources ........................................................................... 35 3.1.3 Air Quality .................................................................................... 40 3.1.4 Climate Change............................................................................. 44 3.1.5 Climate.......................................................................................... 45 3.1.6 Radar............................................................................................. 46 3.1.7 Noise ............................................................................................. 46 3.1.8 Hazardous Materials and Hazardous Waste ................................. 48 3.2 Biological Environment.............................................................................49 3.2.1 Vegetation..................................................................................... 49 3.2.2 Terrestrial Wildlife........................................................................ 50 3.2.3 Avifauna........................................................................................ 51 3.2.4 Threatened and Endangered Species ............................................ 66 xi
- Page 1 and 2: DRAFT ENVIRONMENTAL ASSESSMENT WALL
- Page 3 and 4: DRAFT ENVIRONMENTAL ASSESSMENT ALTE
- Page 5 and 6: INTRODUCTION Executive Summary This
- Page 7 and 8: Executive Summary increase the over
- Page 9 and 10: Executive Summary Resource Proposed
- Page 11 and 12: Executive Summary Resource Proposed
- Page 13: Executive Summary Resource Proposed
- Page 17 and 18: TABLE OF CONTENTS 5.2.1 Post-Constr
- Page 19 and 20: TABLE OF CONTENTS Figure 4: Potenti
- Page 21 and 22: ACHP Advisory Council on Historic P
- Page 23 and 24: NPS National Park Service NRHP Nati
- Page 25 and 26: Mission, Purpose and Need, Backgrou
- Page 28 and 29: Mission, Purpose and Need, Backgrou
- Page 30 and 31: 1.4.2 Need Proposed Action and Alte
- Page 32 and 33: Proposed Action and Alternatives Fi
- Page 34: Proposed Action and Alternatives 2.
- Page 37 and 38: Residential-Scale Turbines Proposed
- Page 40 and 41: This page intentionally left blank.
- Page 42: Proposed Action and Alternatives mo
- Page 45 and 46: 2.3 PROPOSED ACTION AND ALTERNATIVE
- Page 48: This page intentionally left blank.
- Page 51 and 52: Decommissioning Proposed Action and
- Page 53 and 54: turbines because these costs would
- Page 55 and 56: SECTION THREE: AFFECTED ENVIRONMENT
- Page 58 and 59: This page intentionally left blank.
- Page 60: Affected Environment The Virginia S
- Page 63 and 64: Affected Environment FIRM Community
This page intentionally left blank.<br />
Executive Summary<br />
x