Kshipra Sub Basin - Asian Development Bank
Kshipra Sub Basin - Asian Development Bank Kshipra Sub Basin - Asian Development Bank
Support to the National Water Mission NAPCC Appendix 3 Kshipra Sub Basin Capacity building of WUAs and Panchayats will be particularly important to ensure take-up of new approaches to groundwater use. 7. Capacity Building and Development 155. Based on state consultations, a summary of the key capacity building areas towards institutional strengthening 34 , water resource and user institutions development are presented in Table 34 below: Table 34: Key Areas for Capacity Building o Water Management practices for sustainable agriculture o Volumetric supply of water and installation of measuring devises o Basics of Farmers Managed Irrigation Acts and formation of WUA o GIS and Autocad applications o On New Institutional arrangements and the roles to be played by WRD o Community involvement in managing irrigation infrastructure o Preparation of thematic maps for the selected basins o Knowledge on and Utilization of modern equipments for Topographical and cadastral survey o Modern design on irrigation structure and coastal structure o Budgeting. accounting and financial management including fund-flow arrangements o Environmental assessment and redressal systems in the social & environmental assessment framework o Maintaining MIS o O & M of the irrigation assets and allocation of adequate funds o Project Planning, Monitoring and Evaluation o GIS Applications in Irrigation o Modern Survey Techniques (Total Station and LADAR- Laser Detection and Ranging o Environmental Impact Assessment & Management (EIA/EMP of irrigation projects) o Project Economics o Procurement & Contract Management (including procurement procedure) o Procurement/ Tendering o Planning of Irrigation Projects o Modern Irrigation Techniques like Sprinkler/Drip Irrigation o Benchmarking of Irrigation Projects o Water Use Efficiency/Water Auditing of o Irrigation Projects o Productivity Enhancement in Command Area o Design of Dams o Land Acquisition and Encroachment Issues o Modern Construction Technology and Techniques o Quality Control of Construction o Revenue Recovery and Related Issues o Canal and Drainage Hydraulics o Mirco-distribution Network, Plan & Design o Preparation of Operational Plan for Irrigation Projects o SCADA - Canal Automation o Design & Operation of Canal Flow, Flow Measurement and Control Structures o Dam Safety Aspects OTHER DEPARTMENTS o Integrated Farming o Adoption of Micro irrigation technology o Promotion of Hybrid vegetable and Horticultural crops o Promoting fodder cultivation o Seed production and seed certification o Agro-climatic zones and agronomy o Pest Management COMMON TO ALL DEPARTMENTS o Concept, principles and practices of IWRM o Basin approach in Planning and Implementation 34 Main goals of institution strengthening is the strengthening of management and therefore capacity building areas must cover management issues. 71
Support to the National Water Mission NAPCC Appendix 3 Kshipra Sub Basin o National and State Acts & Rules o Formation and functioning of RBO s o Legal Issues and Related Software o Legal Issues and Use of LIS (Legal Information System) o Human Resource Management/Strategic Human Resource Management o Right to Information ACT o Leadership, Motivation and Team Building o Developing Communication Skills o Time, Stress and Conflict Management o Participatory Irrigation Management o Gender Issues and their Integration o Management of Organizational Change o Building Organizational Culture for Performance o Competency Mapping and Management o Public Private Partnership 72
- Page 33 and 34: Support to the National Water Missi
- Page 35 and 36: Support to the National Water Missi
- Page 37 and 38: Support to the National Water Missi
- Page 39 and 40: Support to the National Water Missi
- Page 41 and 42: Support to the National Water Missi
- Page 43 and 44: Support to the National Water Missi
- Page 45 and 46: Support to the National Water Missi
- Page 47 and 48: Support to the National Water Missi
- Page 49 and 50: Support to the National Water Missi
- Page 51 and 52: Support to the National Water Missi
- Page 53 and 54: Support to the National Water Missi
- Page 55 and 56: Support to the National Water Missi
- Page 57 and 58: Support to the National Water Missi
- Page 59 and 60: Support to the National Water Missi
- Page 61 and 62: Support to the National Water Missi
- Page 63 and 64: Support to the National Water Missi
- Page 65 and 66: Support to the National Water Missi
- Page 67 and 68: Support to the National Water Missi
- Page 69 and 70: Support to the National Water Missi
- Page 71 and 72: Support to the National Water Missi
- Page 73 and 74: Support to the National Water Missi
- Page 75 and 76: Support to the National Water Missi
- Page 77 and 78: Support to the National Water Missi
- Page 79 and 80: Support to the National Water Missi
- Page 81 and 82: Support to the National Water Missi
- Page 83: Support to the National Water Missi
- Page 87 and 88: Support to the National Water Missi
- Page 89 and 90: Support to the National Water Missi
- Page 91 and 92: Support to the National Water Missi
- Page 93 and 94: Support to the National Water Missi
- Page 95 and 96: Support to the National Water Missi
- Page 97 and 98: Support to the National Water Missi
- Page 99 and 100: Support to the National Water Missi
- Page 101 and 102: Support to the National Water Missi
- Page 103 and 104: Support to the National Water Missi
- Page 105 and 106: Support to the National Water Missi
- Page 107 and 108: Support to the National Water Missi
- Page 109 and 110: Support to the National Water Missi
- Page 111 and 112: Support to the National Water Missi
- Page 113 and 114: 100
Support to the National Water Mission NAPCC<br />
Appendix 3 <strong>Kshipra</strong> <strong>Sub</strong> <strong>Basin</strong><br />
Capacity building of WUAs and Panchayats will be particularly important to ensure take-up of<br />
new approaches to groundwater use.<br />
7. Capacity Building and <strong>Development</strong><br />
155. Based on state consultations, a summary of the key capacity building areas towards institutional<br />
strengthening 34 , water resource and user institutions development are presented in Table 34 below:<br />
Table 34: Key Areas for Capacity Building<br />
o Water Management practices for sustainable agriculture<br />
o Volumetric supply of water and installation of measuring devises<br />
o Basics of Farmers Managed Irrigation Acts and formation of WUA<br />
o GIS and Autocad applications<br />
o On New Institutional arrangements and the roles to be played by WRD<br />
o Community involvement in managing irrigation infrastructure<br />
o Preparation of thematic maps for the selected basins<br />
o Knowledge on and Utilization of modern equipments for Topographical and cadastral survey<br />
o Modern design on irrigation structure and coastal structure<br />
o Budgeting. accounting and financial management including fund-flow arrangements<br />
o Environmental assessment and redressal systems in the social & environmental assessment<br />
framework<br />
o Maintaining MIS<br />
o O & M of the irrigation assets and allocation of adequate funds<br />
o Project Planning, Monitoring and Evaluation<br />
o GIS Applications in Irrigation<br />
o Modern Survey Techniques (Total Station and LADAR- Laser Detection and Ranging<br />
o Environmental Impact Assessment & Management (EIA/EMP of irrigation projects)<br />
o Project Economics<br />
o Procurement & Contract Management (including procurement procedure)<br />
o Procurement/ Tendering<br />
o Planning of Irrigation Projects<br />
o Modern Irrigation Techniques like Sprinkler/Drip Irrigation<br />
o Benchmarking of Irrigation Projects<br />
o Water Use Efficiency/Water Auditing of<br />
o Irrigation Projects<br />
o Productivity Enhancement in Command Area<br />
o Design of Dams<br />
o Land Acquisition and Encroachment Issues<br />
o Modern Construction Technology and Techniques<br />
o Quality Control of Construction<br />
o Revenue Recovery and Related Issues<br />
o Canal and Drainage Hydraulics<br />
o Mirco-distribution Network, Plan & Design<br />
o Preparation of Operational Plan for Irrigation Projects<br />
o SCADA - Canal Automation<br />
o Design & Operation of Canal Flow, Flow Measurement and Control Structures<br />
o Dam Safety Aspects<br />
OTHER DEPARTMENTS<br />
o Integrated Farming<br />
o Adoption of Micro irrigation technology<br />
o Promotion of Hybrid vegetable and Horticultural crops<br />
o Promoting fodder cultivation<br />
o Seed production and seed certification<br />
o Agro-climatic zones and agronomy<br />
o Pest Management<br />
COMMON TO ALL DEPARTMENTS<br />
o Concept, principles and practices of IWRM<br />
o <strong>Basin</strong> approach in Planning and Implementation<br />
34 Main goals of institution strengthening is the strengthening of management and therefore capacity building<br />
areas must cover management issues.<br />
71