23.03.2013 Views

Download - TRAMP - Arbeit und Leben DGB/VHS

Download - TRAMP - Arbeit und Leben DGB/VHS

Download - TRAMP - Arbeit und Leben DGB/VHS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

•<br />

Working with Older Volunteers in Manual Intergenerational Projects<br />

The international cooking project also<br />

required preparations beforehand in<br />

order to make the project week a success:<br />

inquiries regarding recipes and<br />

necessary ingredients, setup of menus<br />

for the German kitchen, barbecue day,<br />

initial thoughts on the buffet for the<br />

final ceremony, exploring the kitchen<br />

and its devices, talks with the domestic<br />

management, compilation of shopping<br />

lists and the shopping itself, copies of recipes<br />

for all kitchen teams. The tasks of<br />

the international cooking project were<br />

organised as follows: six senior citizens<br />

made up four internationally mixed<br />

groups with 2-3 pupils each. The dishes<br />

were separated onto four stove hobs and<br />

prepared according to recipes. A service<br />

providing drinks and cakes/sandwiches<br />

for the workers (pavilion beach volleyball<br />

course) was organised. Each day, the<br />

setting of tables and the arrangement of<br />

the buffet took place at 12:30 pm. German<br />

food was served on Monday, Czech<br />

food on Tuesday and French food on<br />

Wednesday. A joint barbecue took place<br />

on Thursday and a final buffet was organised<br />

for the Friday.<br />

The exchange in Vigy<br />

• Woodworks: renovation of a wooden<br />

fence (height approx. 80 cm, align, fixate,<br />

polish, varnish…)<br />

• Gardening: layout of flower bed at the<br />

entrance of the premises and layout of<br />

an herb bed, surro<strong>und</strong>ed by a mesh of<br />

hazelnut twigs, for the restaurant. A<br />

coach from the local centre assisted the<br />

group. Setup of a plant barrier (visual<br />

screen).<br />

• Repair of a boule site (basic site already<br />

existed) and layout of marginal plants.<br />

• Masonry: Cut stones (sandstone), manufacture<br />

according to drafts, e.g. s<strong>und</strong>ial,<br />

orientation table. Two masons assisted<br />

Exchange Vigy, working with cut stones<br />

•<br />

the group of aro<strong>und</strong> 10 participants and<br />

provided the materials.<br />

Fabric work: handicraft with different<br />

materials, silk painting, welcome greetings<br />

in several languages and the corresponding<br />

flags. A coach from the local<br />

centre assisted the group.<br />

Exchange Prague/Zbraslav, after work party - using the<br />

new boule site<br />

Final Report 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!