23.03.2013 Views

Download - TRAMP - Arbeit und Leben DGB/VHS

Download - TRAMP - Arbeit und Leben DGB/VHS

Download - TRAMP - Arbeit und Leben DGB/VHS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TRAMP</strong> – Transnational Mobility of Older People in Europe<br />

2. Manual Work<br />

In addition to the intergenerational dialogue,<br />

manual work was determined as a<br />

central method to encourage communication<br />

between the national subgroups. The<br />

following work tasks were performed during<br />

the exchanges:<br />

The exchange in Hamm<br />

• Construction of swings for the schoolyard.<br />

Preparation of the gro<strong>und</strong>, assembly<br />

of 5 swings and encasing in concrete.<br />

• Restoration of a schoolyard wall. The<br />

wall was cleaned, <strong>und</strong>ercoated and painted<br />

with motifs chosen by the pupils.<br />

• Construction of a wooden puppet stage.<br />

One subgroup performed the wood<br />

and decoration work, while the other<br />

subgroup practised the stage play with<br />

younger children.<br />

• Silk painting. In this group silk painting<br />

techniques were taught and motifs for<br />

scarves and postcards designed.<br />

• International cooking. A fifth group ran<br />

a kiosk for snack and prepared meals in<br />

the school kitchen for all 80 participants<br />

with recipes from participating countries.<br />

The exchange in Oberhausen<br />

Upon request of a participating teacher, a<br />

beach volleyball court was constructed on<br />

the schoolyard lawn of a comprehensive<br />

school in Oberhausen. During the planning<br />

phase the project remained unclear for<br />

a long time. Unclarified issues involved<br />

We from the AGE-group have done quite a lot of projects,<br />

and it is highly interesting for me to work with French<br />

and Czech people together in this project at the Harkortschule.<br />

We do not <strong>und</strong>erstand each others’ languages, but<br />

working together runs smoothly nevertheless.<br />

Helmut Beyerlein, Hamm, participant of the exchange<br />

in Hamm<br />

30 Part 1<br />

• The construction (How do you construct<br />

a volleyball court? Which materials<br />

are needed? How much time do the different<br />

work steps take? Is the designated<br />

location suitable? Do we need to organise<br />

an approval by the TÜV? Etc.)<br />

• The financing (What will materials cost?<br />

Which sponsors can we ask?)<br />

• The legal side (Public schoolyard? Access<br />

for non-pupils? What happens when accidents<br />

occur?)<br />

These issues required a lot of information<br />

and many discussions – keeping in mind<br />

that this was all dealt with by lay people.<br />

Finally, a positive decision on behalf of the<br />

school administration enabled the start of<br />

construction (performed by the elderly):<br />

• Construction draft, obtain measurements<br />

and requirements<br />

• Determine work steps and a plan for<br />

necessary materials in appropriate numbers<br />

and necessary tools<br />

• Testing the soil (regarding dangerous<br />

waste accumulated over the years) and<br />

determination of marginal measurements<br />

with appropriate markings<br />

• Excavation works were monitored by<br />

the THW (moving of bushes, excavation<br />

of drain channels and soak away)<br />

• Ordering of materials, organisation of<br />

tool loans<br />

• The project was divided into work<br />

groups, each with 5 seniors of different<br />

nationalities and 5 pupils. The work<br />

groups were assigned with different<br />

tasks in a necessary sequence: 1. placing<br />

the drainage system, 2. setting pillars in<br />

concrete, 3. modelling the margins, 4.<br />

+ 5. filling of gravel, grit and sand. The<br />

work groups worked in parallel and, as<br />

soon as the tasks were completed, joined<br />

the filling groups 4+5. Finally, all participants<br />

had to help with the earthworks<br />

surro<strong>und</strong>ing the beach volleyball court.<br />

On the Friday, everything was prepared<br />

for the grand opening.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!