Section 2 Proposed Development<br />
Figure 2‐8 Modular trenching plough capable of simultaneous lay <strong>and</strong> trench (CTC Marine, 2011).<br />
The final decision on the installation method for the umbilicals has yet to be determined.<br />
ROCK PLACEMENT<br />
Rock placement will be required for pipeline dropped object protection, upheaval buckling mitigation<br />
<strong>and</strong> for pipeline crossings.<br />
An initial maximum estimate is that 20,000 tonnes of rock will be required for the development.<br />
Three pipeline crossings have been identified along the <strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> pipeline development<br />
which will require additional spot rock placement of approximately 3,000 tonnes each.<br />
The final mass of rock required will be calculated by undertaking upheaval buckling analysis based on<br />
information provided from post trenching surveys.<br />
MATTRESSES<br />
Mattresses will be used to provide protection at sections where the pipelines <strong>and</strong> umbilicals are not<br />
trenched e.g. connections with wellheads <strong>and</strong> manifolds. It is estimated that 250 mattresses<br />
measuring 6 m x 3 m will be required covering a total area of 4,500 m 2 .<br />
2.6.8. SUBSEA INSTALLATION SUPPORT VESSELS<br />
Various support vessels will be associated with the subsea installation phases of this development.<br />
Vessel types, duration <strong>and</strong> fuel usage of vessel during installation are given in Table 2‐10.<br />