Section 2 Proposed Development<br />

2.6.5. METERING<br />

Subsea Multiphase Meters (MPM) will be installed subsea at both the <strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> manifolds<br />

<strong>and</strong> additional meters will be fitted to the <strong>Cawdor</strong> trees.<br />

2.6.6. SUBSEA UMBILICALS<br />

A static subsea umbilical will be installed between the Clyde platform <strong>and</strong> the <strong>Cawdor</strong> manifold<br />

(20.46 km) <strong>and</strong> a second umbilical of similar construction will be installed between the <strong>Cawdor</strong><br />

manifold <strong>and</strong> the <strong>Flyndre</strong> manifold (4.2 km). A breakout point will be located at the SSIV structure to<br />

provide controls for the SSIV. The umbilical will supply all required chemicals, hydraulic fluids <strong>and</strong><br />

electrical power.<br />

2.6.7. SUBSEA INFRASTRUCTURE PROTECTION<br />

PIPELINE AND UMBILICAL TRENCHING<br />

A pipelay vessel that is equipped with Dynamic Positioning will be used. The pipeline will be laid <strong>and</strong><br />

trenched <strong>and</strong> backfilled using a towed plough arrangement (Figure 2‐7). The plough will be used to<br />

firstly cut a trench containing the pipeline to a target depth of 1.8 m <strong>and</strong> then backfilled using a<br />

backfill plough. The trench is not envisaged to provide any obstruction to fishing gear that may<br />

encounter it.<br />

Figure 2‐7 Pipeline trenching plough (CTC Marine, 2011).<br />

There are two options for the installation of the subsea umbilical:<br />

Trench <strong>and</strong> mechanical backfill; The main umbilical is laid in a dedicated trench using a towed<br />

plough <strong>and</strong> the trench is either mechanically backfilled or left to backfill naturally. The<br />

backfilling operation can be carried out with the same plough as is used for trenching except<br />

that the blades are configured differently.<br />

Simultaneous lay <strong>and</strong> trench; A device similar to a pipeline plough (Figure 2‐8) is used to lay<br />

<strong>and</strong> trench the umbilical simultaneously.<br />

D/4114/2011 2‐13