<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> <strong>Environmental</strong> Statement<br />
Section 2 Proposed Development<br />
st<strong>and</strong>ards are maintained to minimise the amount of hydrocarbons <strong>and</strong> other contaminants entering<br />
the drainage systems.<br />
2.5.10. WELL CLEAN‐UP AND WELL TEST OPERATIONS<br />
Prior to production, each well will be cleaned to remove any waste <strong>and</strong> debris remaining in the well in<br />
order to prevent damage to the pipeline or topsides production facilities. A well test will also be<br />
conducted to obtain reservoir information <strong>and</strong> fluid samples.<br />
The clean‐up operation will follow UKOOA Best Practice guidelines by isolating the clean‐up train &<br />
associated interface liquids for treatment by Rotomill <strong>and</strong> onshore treatment & disposal, <strong>and</strong><br />
filtering the following displacement brine prior to any disposal.<br />
More detail about the well clean‐ups will be contained within the subsequent <strong>Cawdor</strong> PON15B’s <strong>and</strong><br />
OPPC applications.<br />
Table 2‐7 presents an estimate of the tonnages of gas <strong>and</strong> oil that will be flared during the proposed<br />
well testing <strong>and</strong> clean‐up operations of each of the <strong>Cawdor</strong> wells. The <strong>Cawdor</strong> development (Phase I<br />
<strong>and</strong> II) is anticipated to have a maximum clean up duration of 84 hours, with 1,805 tonnes of gas <strong>and</strong><br />
3,384 tonnes of liquid being flared.<br />
Phase I <strong>Cawdor</strong><br />
Well<br />
Well Clean Up Duration<br />
(Max hrs)<br />
36 (18 hrs for each<br />
flow)<br />
Total gas flared<br />
(Te)<br />
Total liquids flared<br />
(Te)<br />
701 1,450<br />
First Phase II <strong>Cawdor</strong> well 24 552 967<br />
Second Phase II <strong>Cawdor</strong> well 24 552 967<br />
Total 84 1,805 3,384<br />
Table 2‐7 Well Clean‐up <strong>and</strong> Test tonnages.<br />
2.6. SUBSEA INFRASTRUCTURE<br />
This section details the installation of facilities required to produce <strong>and</strong> transport the reservoir fluids<br />
from the seabed to Talisman’s Clyde platform (Figure 2‐6). These include<br />
Xmas tree at each of the <strong>Cawdor</strong> wells<br />
manifold at each of the fields (two in total)<br />
the main pipeline from the <strong>Flyndre</strong> well to the Clyde platform <strong>and</strong> connecting pipelines<br />
from the <strong>Cawdor</strong> manifold to this pipeline<br />
SSIV structure adjacent to the Clyde platform.<br />
2‐ 10 D/4114/2011