23.03.2013 Views

Environmental statement - Flyndre and Cawdor - Maersk Oil

Environmental statement - Flyndre and Cawdor - Maersk Oil

Environmental statement - Flyndre and Cawdor - Maersk Oil

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 2‐5 Schematic of well design for <strong>Cawdor</strong> well.<br />

2.5.7. DRILLING MUD, CUTTINGS AND CHEMICAL DISCHARGES<br />

During drilling, fluids are required for a number of reasons including;<br />

transportation of the cuttings to the surface<br />

cooling <strong>and</strong> lubrication of the drill bit<br />

managing hydrostatic pressure.<br />

<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> <strong>Environmental</strong> Statement<br />

Section 2 Proposed Development<br />

Table 2‐6 summarises the Phase I <strong>Cawdor</strong> well drill cuttings <strong>and</strong> mud masses. It is assumed that<br />

drilling of the Phase II <strong>Cawdor</strong> wells will produce similar mud <strong>and</strong> cuttings volumes.<br />

Section<br />

diameter<br />

36’’<br />

17 1 /2”<br />

Drilling fluid<br />

Seawater <strong>and</strong> high<br />

viscous sweeps<br />

Seawater <strong>and</strong> high<br />

viscous sweeps<br />

Mud volume<br />

(m 3 )<br />

Cuttings<br />

volume (m 3 )<br />

Cuttings<br />

mass (Te)<br />

225 37 94<br />

1160 165 422<br />

Fate of<br />

cuttings<br />

Discharge to<br />

seabed<br />

Discharge to<br />

seabed<br />

12 1 /4” OBM 740 178 458 Rotomill<br />

8 1 /2” OBM 345 81 209 Rotomill<br />

Table 2‐6 <strong>Cawdor</strong> mud <strong>and</strong> cuttings mass.<br />

2‐ 8 D/4114/2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!