<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> <strong>Environmental</strong> Statement<br />
Section 2 Proposed Development<br />
Section diameter<br />
(inches)<br />
36”<br />
Casing<br />
(inches)<br />
30 x 20”<br />
conductor<br />
17 1 /2” 13 3 /8<br />
Drilling fluid Depth (MDBRT)<br />
Sea water <strong>and</strong> high<br />
viscosity sweeps<br />
Sea water <strong>and</strong> high<br />
viscosity sweeps<br />
12 1 /4” 9 5 /8 OBM<br />
D/4114/2011 2‐7<br />
≈520<br />
≈4000<br />
Total depth is<br />
trajectory specific<br />
8 1 /2” n/a OBM 19000<br />
Table 2‐5 <strong>Cawdor</strong> well completion details.<br />
The 36” top hole section will be drilled using seawater <strong>and</strong> high viscosity sweeps to an approximate<br />
depth of 520 ft Mean Depth Bellow Rotary Table (MDBRT) with the 30” x 20” conductor being set <strong>and</strong><br />
cemented. The vertical 17 1 /2” section will be drilled to a total depth of approximately 4,000 ft MDBRT<br />
with seawater <strong>and</strong> high viscosity sweeps. The 13 3 /8” casing will then be run <strong>and</strong> cemented in place.<br />
A 12 1 /4” hole section will be drilled using approximately 14ppg Versclean <strong>Oil</strong> Based Mud (OBM) with<br />
gamma ray, resistivity <strong>and</strong> possibly density <strong>and</strong> neutron measurements being logged (LWD tools).<br />
The trajectory will kick off at approximately 8000 ft Measure Depth (MD) gradually increasing the<br />
angle before entering the Tor chalk reservoir at +/‐ 89 o C incline at circa 11700 ft. The total depth of<br />
the 12 1 /4” will be trajectory specific. A 9 5 /8” casing will be run to total depth <strong>and</strong> cemented in place.<br />
It is planned to drill an 8 1 /2” hole to an anticipated total depth of 19000 ft MDBT, with a +/‐ 14.5 ppg<br />
whilst using OBM, during this process logging information will be carried out this will consist of<br />
gamma rays (with images) resistivity, neutron <strong>and</strong> density.<br />
A CAJ (predrilled)/ solid 7” liner will be run to total depth <strong>and</strong> set near the 9 5 /8” shoe. This will enable<br />
hydraulic fracking of the inner zones, before acid washing (with hydrochloric acid) the outer CAJ zone.<br />
A 5 1 /2” top completion will be run <strong>and</strong> the well cleaned up, before de‐mobilising the rig. A schematic<br />
of the proposed <strong>Cawdor</strong> production well design is illustrated in Figure 2‐5.