<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> <strong>Environmental</strong> Statement<br />

Section 2 Proposed Development<br />

Section diameter<br />

(inches)<br />

36”<br />

Casing<br />

(inches)<br />

30 x 20”<br />

conductor<br />

17 1 /2” 13 3 /8<br />

Drilling fluid Depth (MDBRT)<br />

Sea water <strong>and</strong> high<br />

viscosity sweeps<br />

Sea water <strong>and</strong> high<br />

viscosity sweeps<br />

12 1 /4” 9 5 /8 OBM<br />

D/4114/2011 2‐7<br />

≈520<br />

≈4000<br />

Total depth is<br />

trajectory specific<br />

8 1 /2” n/a OBM 19000<br />

Table 2‐5 <strong>Cawdor</strong> well completion details.<br />

The 36” top hole section will be drilled using seawater <strong>and</strong> high viscosity sweeps to an approximate<br />

depth of 520 ft Mean Depth Bellow Rotary Table (MDBRT) with the 30” x 20” conductor being set <strong>and</strong><br />

cemented. The vertical 17 1 /2” section will be drilled to a total depth of approximately 4,000 ft MDBRT<br />

with seawater <strong>and</strong> high viscosity sweeps. The 13 3 /8” casing will then be run <strong>and</strong> cemented in place.<br />

A 12 1 /4” hole section will be drilled using approximately 14ppg Versclean <strong>Oil</strong> Based Mud (OBM) with<br />

gamma ray, resistivity <strong>and</strong> possibly density <strong>and</strong> neutron measurements being logged (LWD tools).<br />

The trajectory will kick off at approximately 8000 ft Measure Depth (MD) gradually increasing the<br />

angle before entering the Tor chalk reservoir at +/‐ 89 o C incline at circa 11700 ft. The total depth of<br />

the 12 1 /4” will be trajectory specific. A 9 5 /8” casing will be run to total depth <strong>and</strong> cemented in place.<br />

It is planned to drill an 8 1 /2” hole to an anticipated total depth of 19000 ft MDBT, with a +/‐ 14.5 ppg<br />

whilst using OBM, during this process logging information will be carried out this will consist of<br />

gamma rays (with images) resistivity, neutron <strong>and</strong> density.<br />

A CAJ (predrilled)/ solid 7” liner will be run to total depth <strong>and</strong> set near the 9 5 /8” shoe. This will enable<br />

hydraulic fracking of the inner zones, before acid washing (with hydrochloric acid) the outer CAJ zone.<br />

A 5 1 /2” top completion will be run <strong>and</strong> the well cleaned up, before de‐mobilising the rig. A schematic<br />

of the proposed <strong>Cawdor</strong> production well design is illustrated in Figure 2‐5.