23.03.2013 Views

Environmental statement - Flyndre and Cawdor - Maersk Oil

Environmental statement - Flyndre and Cawdor - Maersk Oil

Environmental statement - Flyndre and Cawdor - Maersk Oil

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Physical<br />

presence<br />

General waste Onshore disposal of<br />

solid waste e.g. bin bags,<br />

scrap metal, plastics etc.<br />

<strong>Oil</strong> <strong>and</strong> gas<br />

infrastructure.<br />

Noise <strong>and</strong><br />

Vibration<br />

Physical presence of<br />

subsea infrastructure<br />

e.g. pipeline, wells, etc.<br />

Surface infrastructure<br />

will not be significantly<br />

modified as a result of<br />

the development.<br />

Exclusion zones will be<br />

in place around the<br />

<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong><br />

development.<br />

Noise <strong>and</strong> vibration<br />

generated by operation<br />

of production processing<br />

equipment <strong>and</strong><br />

maintenance.<br />

Impacts associated with onshore disposal are<br />

dependent on the nature of the site or process.<br />

L<strong>and</strong>fills ‐ l<strong>and</strong> take, nuisance, emissions<br />

(methane), possible leachate, limitations on<br />

future l<strong>and</strong> use. Treatment plants ‐ nuisance,<br />

atmospheric emissions, potential for<br />

contamination of sites.<br />

Likelihood Consequence Risk<br />

5 1 Low<br />

May conflict with other users e.g. fishing,<br />

shipping. Attraction of marine life to the<br />

structure.<br />

Likelihood Consequence Risk<br />

5 1 Low<br />

Generates elevated sound levels which can affect<br />

the behaviour of fish <strong>and</strong> marine mammals in the<br />

area.<br />

Likelihood Consequence Risk<br />

5 1 Low<br />

<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> Development <strong>Environmental</strong> Statement<br />

Appendix B – <strong>Environmental</strong> Impact Assessment<br />

Talisman has a Company<br />

Policy to minimise waste.<br />

Waste segregated by<br />

personnel at source &<br />

transferred ashore for<br />

disposal.<br />

Waste Management<br />

Procedure of reduce reuse<br />

recycle followed.<br />

Monthly reporting of<br />

waste sent to shore.<br />

500m exclusion zone<br />

around the Clyde platform<br />

<strong>and</strong> <strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong><br />

drilling locations to<br />

mitigate against collision<br />

risk. The location will be<br />

marked on charts.<br />

Protective structures on<br />

pipeline, manifolds, SSIV<br />

etc. to prevent interaction<br />

with fishing gear.<br />

Operations will constitute<br />

a localised noise source.<br />

The source levels emitted<br />

will be below the sounds<br />

levels of concern for<br />

marine fauna.<br />

Minor<br />

environmental<br />

impact.<br />

<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong><br />

development will<br />

not generate<br />

significant volumes<br />

of general waste.<br />

Loss of relatively<br />

small area of the<br />

seabed to other<br />

users of the sea.<br />

None envisaged.<br />

B ‐ 16 D/4114/2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!