Minor<br />

accidental event<br />

Infrastructure All infield subsea<br />

infrastructure;<br />

manifolds, wells,<br />

24.66km pipeline &<br />

control umbilical<br />

Noise Surface & subsea noise<br />

produced during<br />

operations, of which<br />

piling is likely to be the<br />

dominant sound source<br />

Chemical spills Chemical storage‐<br />

accidental spills, leaks,<br />

containment damage<br />

Disturbance of benthic communities living in the<br />

trenched/ploughed areas & the possible wider<br />

smothering caused by the resultant sediment<br />

plume. Potential impacts to fishing activities.<br />

Likelihood Consequence Risk<br />

5 1 Low<br />

Generates elevated sound levels which can affect<br />

the behaviour of fish <strong>and</strong> marine mammals in the<br />

area.<br />

Likelihood Consequence Risk<br />

5 2 Moderate<br />

May result in a variety of impacts including<br />

increased chemical or biochemical oxygen<br />

dem<strong>and</strong>, toxicity, persistence, bioaccumulation in<br />

animals<br />

Likelihood Consequence Risk<br />

2 2 Low<br />

<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> Development <strong>Environmental</strong> Statement<br />

Appendix B – <strong>Environmental</strong> Impact Assessment<br />

Minimisation of foot‐ print<br />

through design.<br />

Optimisation of pipeline<br />

route.<br />

Impact area is expected to<br />

rapidly restore/ recolonise.<br />

Adherence t principles<br />

within JNCC piling protocol<br />

e.g. use of MMO’s during<br />

piling activity.<br />

Optimised quantities<br />

procured & stored. COSHH,<br />

Task Hazard Assessments<br />

are completed <strong>and</strong> MSDS<br />

sheets are available. All<br />

transfer operations<br />

suspended in rough<br />

weather. All bulk hoses <strong>and</strong><br />

connections must be<br />

inspected before <strong>and</strong> after<br />

use by competent<br />

personnel. Chemicals<br />

stored in tote tank area.<br />

OPEP is implemented as<br />

appropriate in the result of<br />

a spill as per Emergency<br />

Response Process.<br />

Temporal physical<br />

disturbance effect<br />

on local benthic<br />

communities<br />

recovery expected<br />

with time. Hard<br />

structures will<br />

attract different<br />

species.<br />

Short term impact<br />

upon sensitive<br />

species, no impacts<br />

beyond the<br />

installation period<br />

None envisaged.<br />

B ‐ 10 D/4114/2011