23.03.2013 Views

Environmental statement - Flyndre and Cawdor - Maersk Oil

Environmental statement - Flyndre and Cawdor - Maersk Oil

Environmental statement - Flyndre and Cawdor - Maersk Oil

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 1‐2 <strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> Development.<br />

1.1. PURPOSE OF THE PROJECT<br />

<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> <strong>Environmental</strong> Statement<br />

Section 1 Introduction<br />

The purpose of the project is to develop the <strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> fields in order to deliver<br />

hydrocarbons to the UK. This will in turn reduce the UK’s dependence on oil <strong>and</strong> gas imports. Taxes<br />

paid will contribute to the UK’s social programmes <strong>and</strong> provide high value employment.<br />

1.2. PURPOSE OF ENVIRONMENTAL STATEMENT<br />

The purpose of this <strong>Environmental</strong> Statement (ES) is to report on the <strong>Environmental</strong> Assessment (EA)<br />

process that has been carried out. The EA has been carried out to meet statutory <strong>and</strong> project<br />

requirements.<br />

The Offshore Petroleum Production <strong>and</strong> Pipelines (assessment of <strong>Environmental</strong> Effects) Regulations<br />

1999 (as amended 2007 <strong>and</strong> 2010) require;<br />

an evaluation of projects likely to have a significant effect on the offshore environment <strong>and</strong><br />

formal public comment on the resulting ES.<br />

The ES is also required to take into account other European Directives <strong>and</strong> in particular the EU<br />

Habitats Directive 92/43/EEC (enacted in the UK by: The Offshore Petroleum Activities (Conservation<br />

of Habitats) Regulations 2001, SI 2001 No. 1754) <strong>and</strong> the EU Birds Directive 79/409/EEC.<br />

As the field operator <strong>Maersk</strong> <strong>Oil</strong>’s <strong>Environmental</strong> Management System requires that an assessment of<br />

the environmental consequences of all projects is undertaken to ensure the integration of<br />

environmental consideration into their project planning <strong>and</strong> design activities.<br />

1 ‐ 2 D/4114/2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!