23.03.2013 Views

Environmental statement - Flyndre and Cawdor - Maersk Oil

Environmental statement - Flyndre and Cawdor - Maersk Oil

Environmental statement - Flyndre and Cawdor - Maersk Oil

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5‐ 20<br />

<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> <strong>Environmental</strong> Statement<br />

Section 5 Assessment of Potential Impacts <strong>and</strong> Control Measures<br />

OIL DISCHARGED WITH PRODUCED WATER<br />

In order calculate the maximum weight of oil discharged with the PW a discharge quality in line with<br />

regulatory requirements of 30mg/l oil in water content was used<br />

Table 5‐12 shows the maximum dispersed oil associated with the PW from the <strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong><br />

development.<br />

During 2009 2,900 tonnes of oil was discharged with PW from offshore installations on the UKCS. A<br />

maximum additional annual discharge of 10.95 tonnes (based on 2026 PW production profiles for the<br />

<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> development) constitutes a relatively small increase (0.38%) of the existing oil in<br />

water discharges to sea from installations on the UKCS. As such the impact associated with the<br />

increased discharges is not anticipated to be significant.<br />

Source<br />

Dispersed oil associated with maximum PW<br />

production (2026) from <strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong><br />

development<br />

Annual produced oil<br />

discharged (te)<br />

Produced oil discharged<br />

(te/d)<br />

10.95 2 0.03<br />

2009 UKCS dispersed oil in PW discharged 2,900 1 7.9<br />

As a % of UKCS total 0.38 0.38<br />

1<br />

Source; DECC (2011).<br />

2<br />

based on 2026 maximum PW production profiles from <strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> development <strong>and</strong><br />

assuming maximum oil in water content of 30mg/l.<br />

Table 5‐12 Dispersed oil associated with maximum anticipated produced water production profiles<br />

for <strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> development.<br />

CHEMICALS DISCHARGED WITH PRODUCED WATER<br />

Chemical use <strong>and</strong> discharge during production of well fluids are regulated under the Offshore<br />

Chemical Regulations 2002. Details (e.g. type/volume) of all proposed chemicals will be provided in a<br />

PON15D variation. As described in Section 2.10 the chemicals to be used during processing of the<br />

<strong>Flyndre</strong> <strong>and</strong> <strong>Cawdor</strong> hydrocarbons have yet to be decided on, however chemicals which are PLONOR<br />

or are of a lowest toxicity HQ will be prioritised .<br />

Proposed Control Measures<br />

The discharges of produced water are regulated by OPPC regulations <strong>and</strong> reported through EEMS. As<br />

such <strong>Maersk</strong> <strong>Oil</strong> are committed to the following mitigation measures;<br />

reporting total volumes of produced water discharged<br />

monthly reporting of the oil in water content of produced water<br />

bi‐annual sampling for chemical analysis.<br />

Ensure the installation meets

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!