Simultaneously several researches pinpointed the tremendous variation in productivity <strong>of</strong> <strong>IT</strong>-<br />

pr<strong>of</strong>essionals – up to 1 to 10.<br />

A conservative budget and time schedule <strong>of</strong> a project, accommodating the worst case risks emerging<br />

from the above variation, leads the manufacturers to a loss <strong>of</strong> competitiveness. An obvious alternative<br />

is to increase the productivity <strong>of</strong> an <strong>IT</strong>-pr<strong>of</strong>essional. Contrary to the “Modern Times” experience with<br />

Charlie Chaplin, restrictions and stringiest work standards did not prove successful in s<strong>of</strong>tware<br />

production. The virtually unlimited number <strong>of</strong> possibilities and thus decisions taken by the s<strong>of</strong>tware<br />

architect, programmer, operator and so on, calls for a different approach towards productivity: by<br />

pr<strong>of</strong>essionally handling the individual needs <strong>of</strong> the people involved and providing suitable methods.<br />

Our special attention is given to multinational European project teams.<br />

This paper deduces the human factor as the decisive challenge in s<strong>of</strong>tware projects and introduces the<br />

systematic and integral approach towards successful s<strong>of</strong>tware project management.<br />

2. State <strong>of</strong> the art in <strong>S<strong>of</strong>tware</strong> <strong>Project</strong> Performance<br />

A project is a temporary endeavour undertaken to create a unique product or service. Temporary means<br />

that the project has an end date. Unique means that the project's final result differs from the results<br />

delivered so far by the organization. The German standard DIN 69901 [12] adds to this limited<br />

financial, human and other resources as well as a specific organization. There are over 100 definitions<br />

in most respectable publications – most include the human factor in s<strong>of</strong>tware projects in particular. The<br />

variety <strong>of</strong> behavioural combinations <strong>of</strong> the s<strong>of</strong>tware ventures exceeds the boldest expectations for the<br />

majority <strong>of</strong> the projects. This complexity exceeds far beyond the human capability to handle.<br />

100%<br />

80%<br />

60%<br />

40%<br />

20%<br />

0%<br />

1994 1996 1998 2000<br />

challenged<br />

failed<br />

succeeded<br />

Figure 1. <strong>Project</strong> outcomes history (1994 - 2000)<br />

The results <strong>of</strong> Standish Group Researches 1994-2000 [40], examining 30,000 projects showed that<br />

only 20 to 30 per cent <strong>of</strong> all projects succeeded on time and on budget, with all the features and<br />

functions as initially specified (Figure 1). Failed projects were cancelled before completion or never