21.03.2013 Views

Cameron Mudline Suspension System - cedip

Cameron Mudline Suspension System - cedip

Cameron Mudline Suspension System - cedip

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Cameron</strong> <strong>Mudline</strong><br />

<strong>Suspension</strong> <strong>System</strong>


2<br />

Centric 15 <strong>Mudline</strong> Wellhead <strong>System</strong><br />

Key features make the<br />

patented <strong>Cameron</strong> Centric 15<br />

and Centric 15 EX <strong>Mudline</strong><br />

<strong>Suspension</strong> <strong>System</strong>s the most<br />

economical, dependable mudline<br />

equipment on the market today.<br />

Every Centric 15 and Centric<br />

15 EX system comes with the following<br />

features - each designed<br />

to improve performance and<br />

enhance reliability:<br />

• Stack-Down Configuration<br />

• Patented Wash Sleeve Design<br />

• Separate Running/Tieback<br />

Threads<br />

• Prealigning Threads<br />

Throughout<br />

• Stab-In and Threaded Tieback<br />

Options<br />

• Metal Sealing<br />

• High Pressure <strong>System</strong><br />

Available as Standard<br />

In addition, the Centric 15<br />

system offers the following<br />

options:<br />

• Dual Centralization<br />

• Tieback Testing Capability<br />

• Positive Hanger Lock-Down<br />

• Annular Sealing TA Caps<br />

Compare, feature for feature,<br />

you will see that <strong>Cameron</strong>’s<br />

Centric 15 and Centric 15 EX<br />

<strong>Mudline</strong> <strong>Suspension</strong> <strong>System</strong>s are<br />

your best choices for drilling,<br />

temporary abandonment and<br />

production tieback operations at<br />

the mudline.<br />

The <strong>Cameron</strong> Centric 15 <strong>Mudline</strong> <strong>Suspension</strong><br />

<strong>System</strong> is a proven, dependable system for<br />

drilling, temporary abandonment and production<br />

tieback operations.<br />

<strong>System</strong> Features<br />

¥ Deep stack-down configuration eliminates<br />

trash/debris traps and improves the reliability<br />

and efficiency of tieback operations.<br />

¥ Separate thread and seal areas for running<br />

and tieback minimize the risk of damage to<br />

critical areas.<br />

¥ High-pressure and high casing hanger load<br />

capacities increase system versatility.<br />

¥ Patented washout technique for large diameter<br />

casing strings eliminates pipe rotation.<br />

¥ Washout is possible with conductor set in<br />

tension.<br />

¥ Unique split-ring design prevents damage to<br />

cage during compression in wellhead, accommodates<br />

debris and provides two point<br />

centralization.<br />

¥ All threads prealign to facilitate installation<br />

and tieback.<br />

¥ Split ring hanger reciprocation is achieved<br />

without recovery for resetting.<br />

Installation Features<br />

¥ All running tools feature right-hand release<br />

for ease of abandonment.<br />

¥ All hangers incorporate dual centralization to<br />

ensure concentricity.<br />

¥ Washout ports located in the running tools.<br />

¥ Low torque metal seals with resilient backup<br />

ensure seal integrity.<br />

¥ External test ports for hanger/running tool<br />

interface provide means for testing prior to<br />

installation.<br />

¥ Torque tool profiles in all running tools.<br />

Temporary Abandonment Features<br />

¥ A single temporary abandonment cap covers<br />

both production bore and annulus, locking the<br />

hangers in place.<br />

¥ Cap can be run and retrieved inside surface<br />

casing.<br />

¥ Single-trip cap design saves a trip during<br />

installation and retrieval.<br />

¥ Stab-in temporary abandonment caps<br />

standard.<br />

¥ Handling profile extended for clear access.<br />

Tieback Features<br />

¥ Robust threads ensure damage-free<br />

connection.<br />

¥ Right-hand make-up for tieback tools ensures<br />

ease of installation.<br />

¥ Torque profiles available in tieback tools.<br />

¥ Low torque metal-to-metal seals with resilient<br />

back-up ensure sealing integrity.<br />

¥ Ability to tieback to the 13 3/8Ó casing prior to<br />

removing cap ensures safety, saves rig time.<br />

SD016628


Washout Procedure<br />

The <strong>Cameron</strong> Centric 15<br />

<strong>Mudline</strong> <strong>System</strong> incorporates<br />

a patented washout<br />

technique which eliminates<br />

the need to rotate the casing.<br />

In this system, a washsleeve<br />

in the running tool can be<br />

opened and closed using a<br />

torque tool run as part of the<br />

cement stinger. Since the<br />

sleeve is not affected by riser<br />

bending loads, it can be<br />

operated at all times using<br />

low torque rates. Also, the<br />

washports can be opened<br />

with the cement string in<br />

place, minutes after completion<br />

of cementing.<br />

Split Ring <strong>Mudline</strong> Hanger Engagement Sequence<br />

Hanger<br />

Running Through<br />

Casing<br />

1. Hanger is inserted through<br />

wellhead into casing. Split ring<br />

is retracted. Setting ring and<br />

fluted hanger section prevent<br />

presetting.<br />

Split Landing Ring<br />

Engages Receiving<br />

Hanger Profile<br />

2. Split ring arrives at hanger<br />

profile where it easily expands<br />

prior to landing.<br />

Split Landing Ring Sets<br />

and Setting<br />

Ring Engages<br />

3. Split ring lands in hanger<br />

prior to hanger suspension<br />

on load ring.<br />

3<br />

SD016675<br />

With more flexible casing<br />

strings that are less prone to<br />

high manipulating torque,<br />

washout ports on the surface<br />

and production string running<br />

tools are opened by<br />

rotating the casing. The<br />

ports are designed to ensure<br />

cleaning action.<br />

Hanger<br />

Lands on<br />

Load Ring<br />

SD016624<br />

4. Hanger seats on split ring; setting<br />

ring is forced into fully expanded<br />

position. Hanger is suspended<br />

parallel to the receiving profile.


<strong>Mudline</strong> Liner Hanger Temporary Abandonment Cap<br />

SD016622<br />

Tieback Methods<br />

A mudline hanger is used to<br />

suspend casing strings which<br />

will not be tied back to the<br />

surface during tieback operations.<br />

This option allows<br />

operators the flexibility of<br />

installing additional strings<br />

of casing as needed without<br />

the need for additional risers<br />

to surface and the handling<br />

time associated with surface<br />

wellhead equipment.<br />

Threaded Tapered Stab-in<br />

The Centric 15 temporary<br />

abandonment cap protects the<br />

casing hangers and tieback<br />

profiles from the environment<br />

during the abandoned period.<br />

It is installed in the production<br />

string mudline hanger sealing<br />

that bore and the next casing<br />

annulus. The cap is engaged in<br />

the 9 5/8Ó hanger with a stabtype<br />

threaded ring and locks<br />

itself in the 13 3/8Ó hanger with<br />

a device activated by the downward<br />

motion of the cap. During<br />

recovery, trapped pressure can<br />

be vented and its source identified.<br />

Other caps and trash<br />

covers are available for larger<br />

hangers.<br />

SD016618<br />

The Centric 15 <strong>System</strong> uses threaded or stab-in type tieback connections<br />

on the smaller sizes and tapered threads on larger sizes where maximum<br />

bending and tensile forces are exerted. Tieback threads and seal areas<br />

are not used during drilling and abandonment.<br />

SD016629<br />

4


5<br />

Centric 15 EX <strong>Mudline</strong> Wellhead <strong>System</strong><br />

The <strong>Cameron</strong> Centric 15 EX <strong>Mudline</strong> <strong>Suspension</strong><br />

<strong>System</strong> is an economical, stack-down system. Its<br />

configuration is based on the Centric 15, but a<br />

shorter profile makes it ideal for exploration<br />

applications.<br />

<strong>System</strong> Features<br />

¥ Stack-down configuration eliminates<br />

trash/debris traps and improves the reliability<br />

and efficiency of tieback operations.<br />

¥ Separate thread and seal areas minimize<br />

possibility of damage to critical areas.<br />

¥ High-pressure and high casing hanger load<br />

capacities increase system versatility.<br />

¥ Optional patented washout technique for large<br />

diameter casing strings eliminates pipe<br />

rotation.<br />

¥ Unique split-ring design prevents damage to cage<br />

during compression in wellhead, accommodating<br />

debris and provides two point centralization.<br />

¥ All threads throughout the system prealign to<br />

ensure precise installation and tieback.<br />

¥ Split ring hanger reciprocation is achieved without<br />

recovery or resetting.<br />

Installation Features<br />

¥ All running tools feature right-hand release for<br />

ease of installation.<br />

¥ Hangers can incorporate dual centralization to<br />

ensure concentricity.<br />

¥ Washout ports are located in the running tools.<br />

¥ Low torque metal seals with resilient backup<br />

ensure seal integrity.<br />

¥ External test ports for hanger/running tool<br />

interface provide means for testing prior to<br />

installation.<br />

Temporary Abandonment Features<br />

¥ A temporary abandonment cap covers the<br />

production bore and incorporates a simple<br />

check valve.<br />

¥ Threaded cap design standard. Optional stab-in<br />

design available.<br />

¥ Pressure retaining or vented cap designs<br />

available.<br />

¥ Handling profile extended for clear access.<br />

Tieback Features<br />

¥ Robust threads ensure damage-free connection.<br />

¥ Right-hand make-up for surface and<br />

production tieback tools ensures ease of<br />

installation.<br />

¥ Torque profiles available in tieback tools.<br />

¥ Low torque metal-to-metal seals with resilient<br />

back-up ensure sealing integrity.<br />

SD016627


Washout Procedure<br />

The <strong>Cameron</strong> Centric<br />

15 EX <strong>Mudline</strong> <strong>System</strong> incorporates<br />

the option of a<br />

patented washout technique<br />

which eliminates the need to<br />

rotate the casing. In this<br />

system, a washsleeve in the<br />

running tool can be opened<br />

and closed using a torque<br />

tool run as part of the cement<br />

stinger. Since the sleeve is<br />

not affected by riser bending<br />

loads, it can be operated at<br />

all times using low torque<br />

rates. Also, the washports<br />

can be opened with the<br />

cement string in place<br />

minutes after completion<br />

of cementing.<br />

Split Ring <strong>Mudline</strong> Hanger Engagement Sequence<br />

Hanger<br />

Running Through<br />

Casing<br />

1. Hanger is inserted through<br />

wellhead into casing. Split ring<br />

is retracted. Setting ring and<br />

fluted hanger section prevent<br />

presetting.<br />

Split Landing Ring<br />

Engages Receiving<br />

Hanger Profile<br />

2. Split ring arrives at hanger<br />

profile where it easily expands<br />

prior to landing.<br />

Split Landing Ring Sets<br />

and Setting<br />

Ring Engages<br />

3. Split ring lands in hanger<br />

prior to hanger suspension<br />

on load ring.<br />

6<br />

SD016625<br />

With more flexible casing<br />

strings that are less prone to<br />

high manipulating torque,<br />

washout ports on the surface<br />

and production string running<br />

tools are opened by<br />

rotating the casing. The<br />

ports are designed to ensure<br />

cleaning action.<br />

Hanger<br />

Lands on<br />

Load Ring<br />

SD016624EX<br />

4. Hanger seats on split ring; setting<br />

ring is forced into fully expanded<br />

position. Hanger is suspended<br />

parallel to the receiving profile.


<strong>Mudline</strong> Liner Hanger Temporary Abandonment Cap<br />

Tieback Methods<br />

Threaded<br />

SD016622<br />

A mudline hanger is used to<br />

suspend casing strings which<br />

will not be tied back to the<br />

surface during tieback operations.<br />

This option allows<br />

operators the flexibility of<br />

installing additional strings<br />

of casing as needed without<br />

the need for additional risers<br />

to surface and the handling<br />

time associated with surface<br />

wellhead equipment.<br />

Tapered<br />

The Centric 15 EX <strong>System</strong> uses threaded or stab-in type tieback<br />

connections on the smaller sizes and tapered threads on larger<br />

sizes where maximum bending and tensile forces are exerted.<br />

Tieback threads and seal areas are not used during drilling and<br />

abandonment.<br />

The temporary abandonment cap<br />

protects the casing hangers and<br />

tieback profiles from the environment<br />

during the abandonment<br />

period. It is installed in the production<br />

string mudline hanger<br />

and seals that bore. The cap is<br />

engaged in the 9 5/8Ó hanger running<br />

thread profile with either<br />

threaded or stab-in action. Other<br />

caps and trash covers are available<br />

for larger hangers.<br />

Stab-in<br />

SD016619<br />

SD016626<br />

7


8<br />

MX Subsea Tree<br />

The MX subsea tree has been<br />

developed as a simple production<br />

system that can be economically<br />

installed on a mudline well from<br />

a jack-up rig. This system uses<br />

diver assistance to minimize cost<br />

and complexities and is very suitable<br />

for shallow water production<br />

projects.<br />

Features<br />

¥ Flexible system can be installed<br />

over <strong>Cameron</strong> and other mudline<br />

products.<br />

¥ Offers minimum cost and low<br />

maintenance.<br />

¥ Tree designs are available for<br />

single or multiple string completions.<br />

¥ Reliable and field-proven fail<br />

safe gate valves are available in<br />

either a stacked or composite<br />

valve block configuration.<br />

¥ Tree design offers the option of<br />

completing inside 9 5Ú8" or 7"<br />

casing.<br />

¥ Primary metal-to-metal seals<br />

are used at all environmental<br />

interfaces.<br />

¥ Tree features a self-orienting<br />

tubing hanger with positive<br />

lockdown and anti-rotation<br />

capabilities.<br />

¥ SCSSV lines are independently<br />

controlled.<br />

¥ Tree can be readily maintained<br />

with diver assistance.<br />

SD016673


Centric 15 and 15 EX Capacity Charts<br />

Centric 15 Capacity Chart<br />

30” x 20” x 13 3/8” x 9 5/8” x 7” Casing Program<br />

<strong>System</strong> Variables 30” Hanger 20” Hanger 13 3/8” Hanger 9 5/8” Hanger 7” Hanger<br />

Hanger Type n/a Load Shoulder Load Shoulder Split Ring Split Ring<br />

Service Standard Standard H2S or Standard H2S or Standard H2S or Standard<br />

Min I.D. (in.) 26.25 17.58 12.31 8.803 6.115 (5) /5.905 (6)<br />

Max O.D. (in.) 30.30 27.25 18.51 12.23 8.375<br />

Recommended Bit (in.) 26 171/2 12 1/4 8 3/4 61/8 (5) /5 7/8 (6)<br />

Pressure Rating (psi) n/a 4,020 H2S 9,470 H2S 11,840 (2) H2S 10,610 (5)<br />

Std 10,660 H 2 S 10,160 H 2 S 13,340 (6)<br />

Std 13,320 (2) Std 11,940 (5)<br />

Std 11,430 Std 15.010 (6)<br />

Rated Hanging H2S 2,461,000 (1) H2S 1,504,000 H2S 623,000<br />

Capacity (lb) n/a 3,282,000 Std 2,769,000 Std 1,692,000 Std 701,000<br />

Flow-By Running (in. 2 ) n/a 81.90 21.70 9.90/6.61 (3) 4.70/2.6 (4)<br />

Flow-By Landed (in. 2 ) n/a 48.10 14.40 10.3 4.30<br />

Particle size (in.) n/a 1.75 0.88 0.38 0.38<br />

Axial Capacity (lb) H2S 2,165,000 .(1) H2S 1,534,000 H2S 531,000 (5)<br />

(running) n/a 2,422,000 Std 2,436,000 Std 1,726,000 H2S 689,000 (6)<br />

Std 597,000 (5)<br />

Std 776,000 (6)<br />

Thread Type 3 TPI Mod. 3TPI Mod. 3 TPI Mod. 3 TPI Mod.<br />

(left or right hand)<br />

Number of Turns<br />

n/a Square Thread, Left Square Thread, Left Square Thread, Left Square Thread, Left<br />

to Full Engagement n/a 7 13 13 13<br />

Number of Turns to 7<br />

Expose Washout Ports n/a (Washout Sleeve) 8 8 7<br />

(1) Hanger body only for H 2 S service<br />

(2) High pressure system locates washout ports in hangers to enable true metal seal<br />

(3) Flow-By areas for running through 48lb/72lb - 13 3 ⁄8" casing<br />

(1) Flow-By areas are for running through 65 lb/84lb 16" - casing<br />

(2) Flow-By areas are for running through 32.75lb/60lb - 10 3 ⁄4" casing<br />

(3) Hanger body only for H 2 S service<br />

(4) Flow-By areas are for running through 32lb/53lb - 9 5⁄8" casing<br />

(5) For use with 20lb/29lb - 7" casing<br />

(6) For use with 32lb/38lb - 7" casing<br />

Centric 15 EX Capacity Chart<br />

30” x 16” x 10 3/4” x 7 5/8” Casing Program<br />

<strong>System</strong> Variables 30” Hanger 16” Hanger 10 3/4” Hanger 7 5/8” Hanger<br />

Hanger Type n/a Load Shoulder Split Ring Split Ring<br />

Service Standard Standard H2S or Standard H2S or Standard<br />

Min I.D. (in.) 20.12 14.99 10.04 6.80<br />

Max O.D. (in.) 30.30 21.13 14.50 9.50<br />

Recommended Bit (in.) 20 14 3/4 97/8 6 3/4<br />

Pressure Rating (psi) n/a 6900 H2S 11,300 H2S 10,000<br />

Std 12,800 Std 11,252<br />

Rated Hanging H2S 1,520,000 (3) H2S 926,710<br />

Capacity (lb) n/a 2,897,000 Std 1,710,000 Std 1,042,550<br />

Flow-By Running (in. 2 ) n/a 265 11.90/10.50 (1) 6.1/4.8 (2)<br />

Flow-By Landed (in. 2 ) n/a 24 15.40 5.50 (2)<br />

Particle size (in.) n/a 1.25 0.50 0.38<br />

Axial Capacity (lb) H2S 2,146,000 (3) H2S 926,710<br />

(running) n/a 2,910,000 Std 2,415,000 Std 1,042,550<br />

Thread Type 4 TPI Tapered 3 TPI Mod. 3 TPI. Mod.<br />

(left or right hand)<br />

Number of Turns<br />

n/a Thread, Left Square Thread, Left Square Thread, Left<br />

to Full Engagement<br />

Number of Turns to<br />

n/a 2-1/2 13 13<br />

Expose Washout Ports n/a n/a 8 8<br />

Other programs available upon request.<br />

9


Western Hemisphere<br />

<strong>Cameron</strong><br />

PO Box 1212<br />

Houston Texas 77251-1212<br />

Tel 713 939 2211<br />

Fax 713 939 2620<br />

http://www.camerondiv.com<br />

Eastern Hemisphere<br />

Cooper <strong>Cameron</strong> (U.K.) Ltd.<br />

5 Mondial Way<br />

Harlington<br />

Hayes UB3 5AR<br />

Tel 44 181 9901800<br />

Fax 44 181 9901888<br />

http://www.camerondiv.com<br />

Asia Pacific/Middle East<br />

Cooper <strong>Cameron</strong> (Singapore) Pte. Ltd.<br />

No. 2 Gul Circle, Jurong Industrial Est<br />

Locked Bag Service No. 3<br />

Jurong Town Post Office<br />

Singapore 2262<br />

Republic Of Singapore<br />

Tel 65 8613355<br />

Fax 65 8616197<br />

http://www.camerondiv.com<br />

© Cooper <strong>Cameron</strong> Corporation, <strong>Cameron</strong> Division, Printed in USA, 12/97, TG/7.5M, WR6415/TC1256

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!