TRAFFIC CONTROL TELEPHONE SYSTEMS Circuit - Sam Hallas
TRAFFIC CONTROL TELEPHONE SYSTEMS Circuit - Sam Hallas
TRAFFIC CONTROL TELEPHONE SYSTEMS Circuit - Sam Hallas
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Page 58<br />
Earth Fault by Murray Test<br />
Fig. 20.<br />
When using the Murray Earth fault test on a circuit with a branch or<br />
branches, the following procedure must be observed :<br />
Have lines looped at far end of Main <strong>Circuit</strong> and make test as described<br />
above.<br />
If the earth is on one of the branches, the percentage recorded will give<br />
the junction point of the branch with the main circuit.<br />
The fault may therefore be either at the junction point or on the branch.<br />
The loop should then be removed from the far end of main circuit and<br />
the far end of the branch looped; a further test being made.<br />
The percentage reading obtained will give the approximate location of<br />
the fault by reference to the chart covering the branch concerned.<br />
6. Resistance Measurements by Voltmeter Method. (See Fig. 21).<br />
To measure a resistance other than line resistance, connect resistance to<br />
T1, T3 terminals.