21.03.2013 Views

TRAFFIC CONTROL TELEPHONE SYSTEMS Circuit - Sam Hallas

TRAFFIC CONTROL TELEPHONE SYSTEMS Circuit - Sam Hallas

TRAFFIC CONTROL TELEPHONE SYSTEMS Circuit - Sam Hallas

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 58<br />

Earth Fault by Murray Test<br />

Fig. 20.<br />

When using the Murray Earth fault test on a circuit with a branch or<br />

branches, the following procedure must be observed :<br />

Have lines looped at far end of Main <strong>Circuit</strong> and make test as described<br />

above.<br />

If the earth is on one of the branches, the percentage recorded will give<br />

the junction point of the branch with the main circuit.<br />

The fault may therefore be either at the junction point or on the branch.<br />

The loop should then be removed from the far end of main circuit and<br />

the far end of the branch looped; a further test being made.<br />

The percentage reading obtained will give the approximate location of<br />

the fault by reference to the chart covering the branch concerned.<br />

6. Resistance Measurements by Voltmeter Method. (See Fig. 21).<br />

To measure a resistance other than line resistance, connect resistance to<br />

T1, T3 terminals.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!