21.03.2013 Views

CHAPTER 1 STANDARD SUPPLY CODES 1.1 ... - Air Force Link

CHAPTER 1 STANDARD SUPPLY CODES 1.1 ... - Air Force Link

CHAPTER 1 STANDARD SUPPLY CODES 1.1 ... - Air Force Link

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AFMAN 23-110 Volume 1<br />

Part 4, Chapter 1<br />

Code Explanation<br />

FN Replacement type item. Review for appropriate authorization.<br />

FP Item requested is used on end item-command supported.<br />

FQ Change in fund and/or signal code. Requisition routed as necessary to corrected SOS.<br />

FS No applicable to the IM SC&D system processing.<br />

FT Status quantity previously assigned to suffix code, rp 44, is deleted/reduced by the quantity in rps<br />

25-29.<br />

FU Item not procured for stock.<br />

FW Report as work stoppage with Appendix 2.<br />

FX Parts required to make assembly are listed in technical orders. If component parts are available,<br />

re-requisition required parts accordingly.<br />

FY Reference number requisitioned has been related to another reference number with assigned NSN<br />

not <strong>Air</strong> <strong>Force</strong> used. AFMC IM has initiated adopt action, taken action to update CRL-1, and to<br />

revise DLA Transaction Service routing identifier. If support is still required, re-requisition using<br />

NSN reflected in rps 8-22. NOTE: Alternate for status code “FX.”<br />

FZ Back order cancelled. Mechanically assigned to cancel stock replenishment (priority designators<br />

9-15) back orders for investment items that change from non-marginal analysis to marginal analysis.<br />

F2 Rejected. Uncommitted SA program value insufficient to satisfy requirement.<br />

F3 Rejected. SA program line in cut-off or suspended status.<br />

F4 Rejected. Requisition submitted against an AFMC SA program data center controlled program<br />

line<br />

F5 Rejected. SA program requisition submitted to incorrect source of supply. Requirement is an<br />

Army, Navy, or GSA item. Research for correct source of supply and submit a new requisition to<br />

appropriate service logistical control office or procure locally, as applicable.<br />

F6 Rejected. Item not authorized for requisitioning under FMS cooperative logistics or open and requisition<br />

type case criteria. NOTE: Applies to equipment items assigned ERRC code “S” or “U”<br />

or peculiar items which are to be obtained direct from contractor sources.<br />

F7 SA program RCN or program year or both have been changed. Requisition forwarded to activity<br />

indicated in rps 67-69. Adjust your records accordingly.<br />

F8 Rejected. Stock fund item requisitioned against reparable return line (generic code “A9R”) and<br />

uncommitted program availability in generic code “A9C” is insufficient to process requisition.<br />

F9 Followup rejected. SA program “AT” followup is unmatched to the active supply transaction status<br />

file and contains a Julian date greater than 120 days (for SA program/FMS use only).<br />

JA Rejected. Item requisitioned is COMSEC equipment or a classified component. One or more<br />

entries are missing from requisition. Assigned FY_ address in rps 45-50; signal code in rp 51;<br />

and/or advice code in rps 65-66.<br />

1–41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!