21.03.2013 Views

CHAPTER 1 STANDARD SUPPLY CODES 1.1 ... - Air Force Link

CHAPTER 1 STANDARD SUPPLY CODES 1.1 ... - Air Force Link

CHAPTER 1 STANDARD SUPPLY CODES 1.1 ... - Air Force Link

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1A18.3. Section 18B-Status Codes (Record Positions 65-66).<br />

1–40<br />

AFMAN 23-110 Volume 1<br />

Part 4, Chapter 1<br />

Status Codes are electronically published in MILS TRIP, DOD 4000.25-1-M, Appendix 2.16, located at<br />

http://www.dla.mil/j-6/dlmso/eLibrary/Manuals/MILSTRIP/Reissue2004/ap2.asp. Click on DOD<br />

4000.25-1-M, scroll down the index to appendix 2.16 and select it.<br />

Status codes flow from supply sources to relay information back to the creator of a requisition or customer<br />

asset report, consignee/consignor, or service designated control of fice. Status codes inform recipients of<br />

the status of requisitions or customer asset reports and related transactions.<br />

Rps 65-66 are dual-use and the meaning of the codes entered is dependent upon the directional flow of the<br />

document. (See also advice codes in DoD 4000.25-1-M, Appendix 2.15)<br />

NUMBER OF CHARACTERS: Two<br />

TYPE OF CODE: Alpha/Alpha or Alpha/Numeric<br />

EXPLANATION: To inform recipients of the status of requisitions or customer asset reports/related<br />

transactions.<br />

INTRA AIR FORCE Status Codes. The following codes have been assigned for intra-<strong>Air</strong> <strong>Force</strong> use only<br />

and will not be used or recognized by other services.<br />

Table 1A18.2. Intra <strong>Air</strong> <strong>Force</strong> Status Codes.<br />

Code Explanation<br />

FA Obligation authority against central procurement funds to cover cost of LP of materiel for which<br />

AFMC has procurement responsibility.<br />

FB Backorder cancelled.<br />

FC Shipping action has not resulted in a confirmation or denial if item is still required. Requisition<br />

using new document number.<br />

FD Rejected. Contractor’s requisitioning authorization has been totally suspended or suspended for<br />

the specific contract number cited on the requisitioning document.<br />

FE Rejected. Contractor’s requisition (“EZ,” positions 30-31) containing “R” in rp 53 (fund code),<br />

does not contain contract number identification or valid “EZ” SRAN other than the requisitioner<br />

in the supplemental address field (rps 45-50); or, does not contain signal code valid ALC code in<br />

rp 52; or, does not contain signal code “C” or “L” in rp 51. Re-requisition using a new document<br />

number, and citing valid data in rps 45-50 and rps 51-53.<br />

FF Rejected. Item is stock listed as non-PUB and not authorized for requisition, stockage, or issue.<br />

FG Rejected. Item is not authorized for requisitioning by <strong>Air</strong> <strong>Force</strong> activities in any published or<br />

computer disseminated stock number list.<br />

FH Rejected. Requisition cancelled due to application of marginal analysis. Push asset intransit.<br />

FJ Supply Action denied when MRO/redistribution order (RDO) was initially processed.<br />

FK Cancelled. Requisitioning activity failed to reply to request and subsequent followup for additional<br />

information necessary for processing requisitions.<br />

FL Rejected. Insurance item. Not authorized for stock.<br />

FM Rejected. Depot overhaul item.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!