20.03.2013 Views

Inspection of Shop Fabricated ASTs per the SPCC Rule (2004)

Inspection of Shop Fabricated ASTs per the SPCC Rule (2004)

Inspection of Shop Fabricated ASTs per the SPCC Rule (2004)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Unsupported conduits<br />

• Valve on Return Piping<br />

• PVC Caps on various tank<br />

nozzles<br />

• Flex Fuel lines secured to<br />

Unistrut with conduit<br />

clamps<br />

• Normal vent on secondary<br />

tank's annular space<br />

• No Vehicle Damage<br />

Protection (i.e., bollards)<br />

Tank #3<br />

• No fire diamonds<br />

• Impro<strong>per</strong> labeling <strong>of</strong><br />

nozzles<br />

• Tank not being sticked<br />

to check ei<strong>the</strong>r ATGS<br />

accuracy or<br />

accumulation <strong>of</strong> water<br />

– Veeder-Root bottom<br />

water floats can get hung<br />

up on shafts if rusty<br />

muck/mud forms in<br />

bottom)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!