20.03.2013 Views

East Cambridgeshire District Council Water Cycle Study Detailed ...

East Cambridgeshire District Council Water Cycle Study Detailed ...

East Cambridgeshire District Council Water Cycle Study Detailed ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WwTW<br />

Haddenham<br />

Witchford<br />

Littleport<br />

Little<br />

Downham<br />

Witcham<br />

Consent<br />

parameter<br />

Stage 2 <strong>Water</strong> <strong>Cycle</strong> <strong>Study</strong>: Final Report<br />

Sept 2011<br />

Current<br />

consent<br />

standards<br />

Consent<br />

limits<br />

required for<br />

no<br />

deterioration<br />

consent<br />

P 2 20 1<br />

BOD 20A 19<br />

NH4 5 4<br />

P -<br />

No change<br />

required<br />

BOD 20A 18<br />

NH4 12 11<br />

P -<br />

No change<br />

required<br />

33<br />

Process assessment<br />

- Upgrade required?<br />

It is likely that the<br />

change to the consent<br />

could be<br />

accommodated within<br />

the existing process<br />

capacity of the WwTW<br />

It is likely that the<br />

change to the consent<br />

could be<br />

accommodated within<br />

the existing process<br />

capacity of the WwTW<br />

No<br />

It is likely that the<br />

change to the consent<br />

could be<br />

accommodated within<br />

the existing process<br />

capacity of the WwTW<br />

It is likely that the<br />

change to the consent<br />

could be<br />

accommodated within<br />

the existing process<br />

capacity of the WwTW<br />

BOD 15A 12 Yes<br />

It is likely that the<br />

change to the consent<br />

NH4 5 4<br />

could be<br />

accommodated within<br />

the existing process<br />

capacity of the WwTW<br />

P - 1.7 Yes<br />

BOD 15A 14 It is likely that the<br />

change to the consent<br />

could be<br />

NH4 10 9 accommodated within<br />

the existing process<br />

capacity of the WwTW<br />

P -<br />

No change<br />

required<br />

No<br />

BOD 12A 11 It is likely that the<br />

change to the consent<br />

could be<br />

NH4 6 5 accommodated within<br />

the existing process<br />

capacity of the WwTW<br />

No<br />

<strong>Cambridgeshire</strong> Horizons<br />

<strong>East</strong> <strong>Cambridgeshire</strong> – <strong>Detailed</strong> WCS<br />

Is there space<br />

to expand<br />

WwTW<br />

Yes, if adjacent<br />

land is available<br />

Yes, if adjacent<br />

land is available<br />

Yes, if adjacent<br />

land is available<br />

Yes, if adjacent<br />

land is available<br />

Yes, if adjacent<br />

land is available<br />

20 Soham WwTWs has a PE greater than 10,000 and discharges to a ‘Sensitive Areas (Eutrophic)’ as designated under the UWWTD,<br />

it is therefore required that either: a) the effluent achieves 2 mg/l of P as an annual average; or b) 80% of influent P is removed by the<br />

treatment process. Although the WwTW does not have a formal P consent value, it has been assumed for calculation purposes that<br />

a 2mg/l consent standard applies.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!