- Page 1 and 2: East Cambridgeshire District Counci
- Page 3 and 4: Table of Contents Cambridgeshire Ho
- Page 5 and 6: Executive Summary Stage 2 Water Cyc
- Page 7 and 8: Stage 2 Water Cycle Study: Final Re
- Page 9 and 10: Surface Water Drainage Management S
- Page 11 and 12: SWM5 - Linkages to SWMP and SFRA St
- Page 13 and 14: Glossary of Acronyms and Abbreviati
- Page 15 and 16: Abbreviation Description RTPI Royal
- Page 17 and 18: 1.3 Stage 2 - Study Governance Stag
- Page 19 and 20: Stage 2 Water Cycle Study: Final Re
- Page 21 and 22: • Surface Water Management Plan f
- Page 23 and 24: 2 Proposed Growth 2.1 Preferred Gro
- Page 25 and 26: 2.3 Employment Stage 2 Water Cycle
- Page 27 and 28: Figure 2-1: Potential development s
- Page 29 and 30: Relevant WwTW Stage 2 Water Cycle S
- Page 31 and 32: Stage 2 Water Cycle Study: Final Re
- Page 33: WwTW Soham Burwell Bottisham Hadden
- Page 37 and 38: WwTW Haddenham Witchford Littleport
- Page 39 and 40: Return Period Stage 2 Water Cycle S
- Page 41 and 42: Stage 2 Water Cycle Study: Final Re
- Page 43 and 44: In summary: Stage 2 Water Cycle Stu
- Page 45 and 46: Stage 2 Water Cycle Study: Final Re
- Page 47 and 48: Stage 2 Water Cycle Study: Final Re
- Page 49 and 50: Stage 2 Water Cycle Study: Final Re
- Page 51 and 52: Legend Stage 2 Water Cycle Study: F
- Page 53 and 54: Stage 2 Water Cycle Study: Final Re
- Page 55 and 56: Stage 2 Water Cycle Study: Final Re
- Page 57 and 58: 3.3.7 Ecological Enhancement Stage
- Page 59 and 60: Stage 2 Water Cycle Study: Final Re
- Page 61 and 62: Figure 3-3: Littleport Potential Wa
- Page 63 and 64: Soham Sites Assessment Site Descrip
- Page 65 and 66: Burwell Site Assessment Site Descri
- Page 67 and 68: 4 Water Supply Strategy 4.1 Introdu
- Page 69 and 70: Stage 2 Water Cycle Study: Final Re
- Page 71 and 72: Stage 2 Water Cycle Study: Final Re
- Page 73 and 74: • pressure control; • rainwater
- Page 75 and 76: 4.4.3 Improving Efficiency in Exist
- Page 77 and 78: Stage 2 Water Cycle Study: Final Re
- Page 79 and 80: g Assumed garden use Stage 2 Water
- Page 81 and 82: Stage 2 Water Cycle Study: Final Re
- Page 83 and 84: Stage 2 Water Cycle Study: Final Re
- Page 85 and 86:
Stage 2 Water Cycle Study: Final Re
- Page 87 and 88:
Table 4-8: Water Neutrality Scenari
- Page 89 and 90:
Financial Cost considerations Stage
- Page 91 and 92:
Stage 2 Water Cycle Study: Final Re
- Page 93 and 94:
Carbon Cost considerations Stage 2
- Page 95 and 96:
Figure 4-5: CO2 emissions from a Cf
- Page 97 and 98:
Table 4-14: Carbon costs of WN Scen
- Page 99 and 100:
POLICY RECOMMENDATION 3: 4.4.8 Deli
- Page 101 and 102:
Retrofitting funding options Stage
- Page 103 and 104:
Potential Climate Change Temperatur
- Page 105 and 106:
Stage 2 Water Cycle Study: Final Re
- Page 107 and 108:
Stage 2 Water Cycle Study: Final Re
- Page 109 and 110:
Stage 2 Water Cycle Study: Final Re
- Page 111 and 112:
Table 5-1: Indicative storage volum
- Page 113 and 114:
Stage 2 Water Cycle Study: Final Re
- Page 115 and 116:
Site Land west of 93-135 Lynn Road,
- Page 117 and 118:
Stage 2 Water Cycle Study: Final Re
- Page 119 and 120:
Stage 2 Water Cycle Study: Final Re
- Page 121 and 122:
Stage 2 Water Cycle Study: Final Re
- Page 123 and 124:
5.9 Conclusions Stage 2 Water Cycle
- Page 125 and 126:
6.1 Ely Potential Development Areas
- Page 127 and 128:
6.2 Soham Potential Development are
- Page 129 and 130:
6.3 Littleport Potential Developmen
- Page 131 and 132:
6.4 Bottisham Potential Development
- Page 133 and 134:
Water Cycle Area Summary Overall As
- Page 135 and 136:
7.1.4 Ecology SWM2 - above ground d
- Page 137 and 138:
PPS25 Department for Communities an
- Page 139 and 140:
Appendices Stage 2 Water Cycle Stud
- Page 141 and 142:
Directive/Legislation/Guidance Desc
- Page 143 and 144:
Stage 2 Water Cycle Study: Final Re
- Page 145 and 146:
Table A2-2 No deterioration assessm
- Page 147 and 148:
MASS BALANCE CALCULATION: MONTE CAR
- Page 149 and 150:
MASS BALANCE CALCULATION: MONTE CAR
- Page 151 and 152:
MASS BALANCE CALCULATION: MONTE CAR
- Page 153 and 154:
MASS BALANCE CALCULATION: MONTE CAR
- Page 155 and 156:
MASS BALANCE CALCULATION: MONTE CAR
- Page 157 and 158:
MASS BALANCE CALCULATION: MONTE CAR
- Page 159 and 160:
MASS BALANCE CALCULATION: MONTE CAR
- Page 161 and 162:
MASS BALANCE CALCULATION: MONTE CAR
- Page 163 and 164:
MASS BALANCE CALCULATION: MONTE CAR
- Page 165 and 166:
WITCHAM STW Scenario 1 Current Qual
- Page 167 and 168:
LITTLE DOWNHAM STW Current Quality
- Page 169 and 170:
WITCHFORD STW Current Quality Conse
- Page 172 and 173:
Appendix 4: Alternative WwTW option
- Page 174 and 175:
Common options for secondary sewage
- Page 176 and 177:
Proprietary systems Stage 2 Water C
- Page 178 and 179:
Stage 2 Water Cycle Study: Final Re
- Page 180 and 181:
East Cambridgeshire WCS Flood Estim
- Page 182 and 183:
East Cambridgeshire WCS Flood Estim
- Page 184 and 185:
East Cambridgeshire WCS Flood Estim
- Page 186 and 187:
East Cambridgeshire WCS Flood Estim
- Page 188 and 189:
East Cambridgeshire WCS Flood Estim
- Page 190 and 191:
East Cambridgeshire WCS Flood Estim
- Page 192 and 193:
East Cambridgeshire WCS Flood Estim
- Page 194 and 195:
East Cambridgeshire WCS Flood Estim
- Page 196 and 197:
East Cambridgeshire WCS Flood Estim
- Page 198 and 199:
East Cambridgeshire WCS Flood Estim
- Page 200 and 201:
East Cambridgeshire WCS Flood Estim
- Page 202 and 203:
East Cambridgeshire WCS Flood Estim
- Page 204 and 205:
East Cambridgeshire WCS Flood Estim
- Page 206 and 207:
East Cambridgeshire WCS Flood Estim
- Page 208 and 209:
East Cambridgeshire WCS Flood Estim
- Page 210 and 211:
East Cambridgeshire WCS Flood Estim
- Page 212 and 213:
Key Appendix A: Developer Checklist
- Page 214 and 215:
23 Is the development area above a
- Page 216 and 217:
Appendix 7: Ecological background f
- Page 218 and 219:
Ouse Washes SPA Stage 2 Water Cycle
- Page 220 and 221:
Stage 2 Water Cycle Study: Final Re