20.03.2013 Views

East Cambridgeshire District Council Water Cycle Study Detailed ...

East Cambridgeshire District Council Water Cycle Study Detailed ...

East Cambridgeshire District Council Water Cycle Study Detailed ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Stage 2 <strong>Water</strong> <strong>Cycle</strong> <strong>Study</strong>: Final Report<br />

Sept 2011<br />

118<br />

<strong>Cambridgeshire</strong> Horizons<br />

<strong>East</strong> <strong>Cambridgeshire</strong> – <strong>Detailed</strong> WCS<br />

Figure 5-2 Change in Summer and Winter Mean Precipitation for 2020s, 2050s and 2080s<br />

(High Emissions Scenario) – UKCIP02 and UKCP09 projections. Black vertical lines<br />

represent ‘Very Likely’ (10% to 90% probability) range for UKCP09 projections<br />

For new development, it is most likely that the requirements of PPS25 will ensure that climate<br />

change adaptation is taken into account when designing the surface water management<br />

system for the proposed development. As with the indicative SuDS sizings given above, all<br />

drainage design for new developments should include an allowance for climate change, in<br />

accordance with the requirements of PPS25 and any subsequent National Policy Statements.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!