The power of Visibility<br />

TOCICO 2008 Conference<br />

• We affixed a white board inside the entrance of our factory with the<br />

priority p y list<br />

• All persons entering whether customers, staff, workers and most<br />

importantly suppliers could see the list for themselves and decide<br />

on their course of action<br />

• We gave operations only 1 week notice before giving OK to start<br />

manufacture of a machine<br />

− In 1 week time they were expected to procure 100% of the RM<br />

required and manufacture the machine. N<br />

− No RM stock was permitted to be stored in the factory, the stores<br />

were not to be used for storing any longer longer. So we moved the stores<br />

from a 5000 sq feet room to a 100 sq feet room<br />

− The idea being if they did not have enough place to sit, they would<br />

stop buying & storing RM<br />

16<br />

© 2008 TOCICO. All rights reserved.