Full Kit Corollary<br />
• Corollary y to the Rule 2: No machine to be<br />
manufactured unless 100% raw material<br />
was available<br />
− 100% raw material…you t i l must t bbe<br />
crazy<br />
• Result – We crashed the lead time to 7<br />
days! Today we manufacture the machines<br />
in 3 to 5 days<br />
• Now that we need only 3 days, start<br />
manufacturing only when the customer<br />
shouts.<br />
• Ti Time to t time ti the th customer t still till delayed d l d<br />
accepting the machines<br />