06.03.2013 Views

Integrated Contract

Integrated Contract

Integrated Contract

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The Miahuapan block has the following pipelines:<br />

Origen Destino<br />

Roads within the Miahuapan block<br />

Diám<br />

(pg)<br />

Líneas de Descarga<br />

Long<br />

(km)<br />

Tubería<br />

Año de<br />

Construcció<br />

n<br />

Estado<br />

TEJADA 1 BS TEJADA 4 0.05 LDD S/I Operativa<br />

TEJADA 2 BS TEJADA 4 0.3 LDD S/I Operativa<br />

TEJADA 3 BS TEJADA 4 0.3 LDD S/I Operativa<br />

TEJADA-4 BS TEJADA 4 0.8 LDD S/I Operativa<br />

TEJADA-6 BS TEJADA 4 0.8 LDD S/I Operativa<br />

TEJADA-11 BS TEJADA 4 0.7 LDD S/I Operativa<br />

TEJADA-12 BS TEJADA 4 0.7 LDD S/I Operativa<br />

TEJADA-22 BS TEJADA 4 0.3 LDD S/I Operativa<br />

TEJADA-24 BS TEJADA 4 0.3 LDD S/I Operativa<br />

TEJADA-23 BS TEJADA 4 0.5 LDD S/I Operativa<br />

TEJADA-31 BS TEJADA 4 0.9 LDD S/I Operativa<br />

TEJADA-43 BS TEJADA 4 0.5 LDD S/I Operativa<br />

TEJADA-52 BS TEJADA 4 1.5 LDD S/I Operativa<br />

TEJADA-63 BS TEJADA 4 1.3 LDD S/I Operativa<br />

Road map (roads and unpaved roads) villages, well pads and oil facilities<br />

20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!