<strong>EIA</strong> of The Nam Ngiep 1 Hydropower Project Draft Report: Chapter 10<br />

3) Demolition works<br />

4) Site activities<br />

• Use water as needed to suppress dust dispersion by winds<br />

• Cutting equipment should use water as suppressant or other practical<br />

ventilation systems<br />

• Securely cover skips and minimize drop heights<br />

• Minimize dust generating activities<br />

• Use water as suppressant where applicable<br />

Emission and Dust Control measures are presented in Section SP07 of Annex 1.<br />

(3) Responsible Unit/Agency<br />

• For all prevention and mitigation measures: Developer / Contractor / Sub-<br />

Contractor<br />

• For monitoring: EMU and EMO<br />

(4) Cost Estimate (USD)<br />

The expense of implementation should be included in good m anagement practices of<br />

construction sites.<br />

Monitoring: USD $10,000, for instruments, materials and analysis<br />

(5) Work Plan:<br />

Work Plan Frequency<br />

1 Prepare emission and dust<br />

control plan<br />

2 Monitor emissions and dust<br />

levels<br />

monthly<br />

10.1.1.7 Potential for site contamination<br />

(1) Objective<br />

• To prevent site contamination<br />

Pre<br />

construction<br />

Construction Phase Operation Phase<br />

(year)<br />

(year)<br />

1 2 3 4 5 6 1 2 3-8 >8<br />

• To monitor and report measurements to the relevant organization(s)<br />

10-16