Rowville-Rail-Study-Final-Stage-1-Report-FINAL
Rowville-Rail-Study-Final-Stage-1-Report-FINAL
Rowville-Rail-Study-Final-Stage-1-Report-FINAL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Appendices<br />
A. Stakeholders consulted<br />
Stakeholder organisations consulted or briefed during the study include:<br />
Australian Synchrotron<br />
Bicycle Victoria<br />
Bus Association of Victoria<br />
CSIRO<br />
Department of Planning and Community Development<br />
Department of Transport<br />
Eastern Transport Coalition<br />
Environment Victoria<br />
Ethnic Communities Council of the South East (ECCOSE)<br />
Kim Wells MP<br />
Knox City Council<br />
Metro Trains Melbourne<br />
Metropolitan Transport Forum<br />
Monash City Council<br />
Monash University<br />
Nick Wakeling MP<br />
Public Transport Users Association<br />
Public Transport Victoria<br />
Royal Automobile Club of Victoria<br />
Victorian Council of Social Service (VCOSS)<br />
VicRoads<br />
We thank all stakeholders and the wider community for their invaluable assistance.<br />
B. List of supporting reports<br />
Supporting reports to this document are as follows:<br />
Preliminary rail design report<br />
Travel demand modelling report<br />
Sustainability considerations report<br />
Environment and planning investigation report<br />
Station layout and urban design report<br />
Public consultation report<br />
Concept timetabling and operations report<br />
<strong>Report</strong> on public submissions on the Draft <strong>Stage</strong> 1 <strong>Report</strong><br />
All these reports are available via our website www.rowvillerailstudy.com.au<br />
C. Risk register<br />
<strong>Final</strong> <strong>Stage</strong> 1 Feasibility <strong>Report</strong><br />
Appendices<br />
A summary risk register has been prepared and provided separately to Public Transport Victoria.<br />
Page 67