<strong>Final</strong> <strong>Stage</strong> 1 Feasibility <strong>Report</strong><br />

A <strong>Rowville</strong> rail line concept<br />

Jacksons Road to <strong>Rowville</strong> –three main route options were considered between<br />

Jacksons Road and <strong>Rowville</strong> (see Figure 16):<br />

Route A passes through the northern part of Kingston Links golf course and skirts<br />

the north side of the residential area and into Stud Park from the north-west;<br />

Route B runs through the southern part of Kingston Links golf course just north of<br />

the commercial properties on the north side of Wellington Road; and<br />

Route C (the preferred route) is along Wellington and Stud Roads.<br />

All options would be on elevated structure across the valley area, then underground on the<br />

east side of the valley through to an underground terminus station at Stud Park (with each<br />

route there would be a further option of a station just west of Stud Road instead). These<br />

options are discussed in more detail below.<br />

Each of the options includes provision for an upgraded, continuous shared bicycle and<br />

pedestrian path along the route.<br />

Route options at <strong>Rowville</strong> end<br />

Impacts of the three potential alternative routes A, B and C (see Figure 16) identified at the<br />

<strong>Rowville</strong> end of the rail line have been assessed to help determine which appears to be the<br />

best solution. Preliminary desktop investigations were undertaken in land use and statutory<br />

planning, surface water, groundwater, contaminated land, flora and fauna, cultural heritage<br />

and noise and vibration. Table 9 summarises the results.<br />

Table 9 – Summary environmental appraisal of route options at <strong>Rowville</strong> end<br />

Issue<br />

Planning and land use<br />

Surface water<br />

Groundwater<br />

Ecology<br />

Cultural heritage<br />

Noise and vibration<br />

Contaminated land<br />

Route A<br />

(Kingston Links north)<br />

high risk moderate risk low risk<br />

Route B<br />

(Kingston Links south)<br />

Route C<br />

(Wellington & Stud Rds)<br />

Route C has the lowest associated risks from a social and environmental viewpoint. There<br />

are moderate environmental risks associated with Route B and particularly high risks with<br />

Route A in land use planning, surface water and ecology. Other considerations such as<br />

constructability and cost may be significant, but we consider that Route C should be the<br />

preferred solution. We have therefore produced a concept design for this route only, with two<br />

options for the location of a <strong>Rowville</strong> station (at Stud Park, or at the intersection of Stud Road<br />

and Wellington Road).<br />

Page 41