05.03.2013 Views

Rowville-Rail-Study-Final-Stage-1-Report-FINAL

Rowville-Rail-Study-Final-Stage-1-Report-FINAL

Rowville-Rail-Study-Final-Stage-1-Report-FINAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 14 – Summary of suggestions made by the community and stakeholders<br />

Suggestions have included:<br />

<strong>Final</strong> <strong>Stage</strong> 1 Feasibility <strong>Report</strong><br />

Possible solutions<br />

Light rail links along Wellington Road and North Road or Princes Highway, and out to<br />

Ferntree Gully; and<br />

Heavy rail links between Monash and Chadstone, along EastLink between Dandenong<br />

and Ringwood, from Glen Waverley to Knox, Ferntree Gully and Scoresby, and also a<br />

link from Oakleigh through Chadstone and on to the Alamein line.<br />

We have not considered these ideas in this first <strong>Stage</strong> of the study because of our focus on<br />

the feasibility of the <strong>Rowville</strong> rail line, but many of them could be considered either as<br />

supplements or alternatives to the <strong>Rowville</strong> rail line as part of broader investigations into<br />

public transport improvements, ideally linked with ongoing work on the metropolitan planning<br />

strategy.<br />

Page 32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!