DISCLAIMER This report presents the results of an independent study and does not necessarily reflect the views of the Minister for Public Transport or Public Transport Victoria. FINAL REPORT This is the Final Report of Stage 1 of the Rowville Rail Study. It replaces the Draft Stage 1 Report that was released publicly on 9 March 2012, and includes changes in the light of submissions and comments received.
Contents Foreword ................................................................................................................................ 1 Executive summary .............................................................................................................. 2 1. Introduction .................................................................................................................... 7 2. History of Rowville rail line ........................................................................................... 8 2.1 Melbourne Transport Plan (1969) .......................................................................................................... 8 2.2 Scoresby Transport Corridor (1998) ...................................................................................................... 9 2.3 City of Knox study (2004) .................................................................................................................... 10 2.4 This study ............................................................................................................................................ 11 2.5 Policy context ...................................................................................................................................... 11 3. Existing and future conditions ................................................................................... 12 3.1 Overall context ..................................................................................................................................... 12 3.2 Study area ........................................................................................................................................... 12 3.3 Land use .............................................................................................................................................. 13 3.4 Demography ........................................................................................................................................ 15 3.5 Travel patterns ..................................................................................................................................... 17 3.6 Existing transport provision .................................................................................................................. 19 3.7 Summary ............................................................................................................................................. 24 4. Community and stakeholder views ............................................................................ 25 4.1 Consultation process ........................................................................................................................... 25 4.2 Summary of responses during the study ............................................................................................. 26 4.3 Overall support during the study .......................................................................................................... 28 4.4 Response to the Draft Stage 1 Report ................................................................................................. 29 5. Possible solutions ....................................................................................................... 31 5.1 Rowville rail line overview .................................................................................................................... 31 5.2 Alternatives to Rowville rail line ........................................................................................................... 31 6. A Rowville rail line concept ........................................................................................ 33 6.1 Train operations ................................................................................................................................... 33 6.2 Physical details of the rail line .............................................................................................................. 38 6.3 Sustainability considerations ............................................................................................................... 48 6.4 Constructability .................................................................................................................................... 49 7. Travel demand effects ................................................................................................. 52 7.1 Background and assumptions ............................................................................................................. 52 7.2 Rail line patronage ............................................................................................................................... 53 7.3 Station usage ....................................................................................................................................... 54 7.4 Mode shifts .......................................................................................................................................... 57 7.5 Conclusions on demand modelling ...................................................................................................... 59 8. Costs, benefits and impacts ....................................................................................... 60 8.1 Capital costs ........................................................................................................................................ 60 8.2 Operating costs ................................................................................................................................... 60 8.3 Economic appraisal ............................................................................................................................. 60 8.4 Wider economic benefits ..................................................................................................................... 61 8.5 Environmental and social effects ......................................................................................................... 62 8.6 Initial appraisal ..................................................................................................................................... 62 8.1 Conclusions ......................................................................................................................................... 64 9. Findings and recommendations ................................................................................ 65 9.1 Summary of findings ............................................................................................................................ 65 9.2 Recommended actions ........................................................................................................................ 66 Appendices.......................................................................................................................... 67 A. Stakeholders consulted ....................................................................................................................... 67 B. List of supporting reports ..................................................................................................................... 67 C. Risk register ......................................................................................................................................... 67
- Page 1: Rowville Rail Study - Public Plan i
- Page 5 and 6: Executive summary Introduction Fina
- Page 7 and 8: Final Stage 1 Feasibility Report Ex
- Page 9 and 10: area in the interim period leading
- Page 11 and 12: 2. History of Rowville rail line A
- Page 13 and 14: cost implications for the Huntingda
- Page 15 and 16: 3. Existing and future conditions F
- Page 17 and 18: Figure 6 - Land uses in the Rowvill
- Page 19 and 20: Final Stage 1 Feasibility Report Ex
- Page 21 and 22: 3.5.1 Journeys to work Table 3 - Jo
- Page 23 and 24: Source: VicRoads Figure 9 - SmartRo
- Page 25 and 26: Final Stage 1 Feasibility Report Ex
- Page 27 and 28: influence on the design and operati
- Page 29 and 30: Activity Description Participation/
- Page 31 and 32: “Rowville and residents in surrou
- Page 33 and 34: Subject area Summary of submissions
- Page 35 and 36: Figure 14 - Summary of suggestions
- Page 37 and 38: Final Stage 1 Feasibility Report A
- Page 39 and 40: 6.1.4 Implications for the rail net
- Page 41 and 42: passenger capacity may also be requ
- Page 43 and 44: Figure 17 - Illustrative cross sect
- Page 45 and 46: 6.2.2 Station locations and layouts
- Page 47 and 48: Figure 21 - Mulgrave station cross
- Page 49 and 50: Figure 25 - Rowville station cross
- Page 51 and 52: Table 10 - Summary comparison of Ro
Contents<br />
Foreword ................................................................................................................................ 1<br />
Executive summary .............................................................................................................. 2<br />
1. Introduction .................................................................................................................... 7<br />
2. History of <strong>Rowville</strong> rail line ........................................................................................... 8<br />
2.1 Melbourne Transport Plan (1969) .......................................................................................................... 8<br />
2.2 Scoresby Transport Corridor (1998) ...................................................................................................... 9<br />
2.3 City of Knox study (2004) .................................................................................................................... 10<br />
2.4 This study ............................................................................................................................................ 11<br />
2.5 Policy context ...................................................................................................................................... 11<br />
3. Existing and future conditions ................................................................................... 12<br />
3.1 Overall context ..................................................................................................................................... 12<br />
3.2 <strong>Study</strong> area ........................................................................................................................................... 12<br />
3.3 Land use .............................................................................................................................................. 13<br />
3.4 Demography ........................................................................................................................................ 15<br />
3.5 Travel patterns ..................................................................................................................................... 17<br />
3.6 Existing transport provision .................................................................................................................. 19<br />
3.7 Summary ............................................................................................................................................. 24<br />
4. Community and stakeholder views ............................................................................ 25<br />
4.1 Consultation process ........................................................................................................................... 25<br />
4.2 Summary of responses during the study ............................................................................................. 26<br />
4.3 Overall support during the study .......................................................................................................... 28<br />
4.4 Response to the Draft <strong>Stage</strong> 1 <strong>Report</strong> ................................................................................................. 29<br />
5. Possible solutions ....................................................................................................... 31<br />
5.1 <strong>Rowville</strong> rail line overview .................................................................................................................... 31<br />
5.2 Alternatives to <strong>Rowville</strong> rail line ........................................................................................................... 31<br />
6. A <strong>Rowville</strong> rail line concept ........................................................................................ 33<br />
6.1 Train operations ................................................................................................................................... 33<br />
6.2 Physical details of the rail line .............................................................................................................. 38<br />
6.3 Sustainability considerations ............................................................................................................... 48<br />
6.4 Constructability .................................................................................................................................... 49<br />
7. Travel demand effects ................................................................................................. 52<br />
7.1 Background and assumptions ............................................................................................................. 52<br />
7.2 <strong>Rail</strong> line patronage ............................................................................................................................... 53<br />
7.3 Station usage ....................................................................................................................................... 54<br />
7.4 Mode shifts .......................................................................................................................................... 57<br />
7.5 Conclusions on demand modelling ...................................................................................................... 59<br />
8. Costs, benefits and impacts ....................................................................................... 60<br />
8.1 Capital costs ........................................................................................................................................ 60<br />
8.2 Operating costs ................................................................................................................................... 60<br />
8.3 Economic appraisal ............................................................................................................................. 60<br />
8.4 Wider economic benefits ..................................................................................................................... 61<br />
8.5 Environmental and social effects ......................................................................................................... 62<br />
8.6 Initial appraisal ..................................................................................................................................... 62<br />
8.1 Conclusions ......................................................................................................................................... 64<br />
9. Findings and recommendations ................................................................................ 65<br />
9.1 Summary of findings ............................................................................................................................ 65<br />
9.2 Recommended actions ........................................................................................................................ 66<br />
Appendices.......................................................................................................................... 67<br />
A. Stakeholders consulted ....................................................................................................................... 67<br />
B. List of supporting reports ..................................................................................................................... 67<br />
C. Risk register ......................................................................................................................................... 67