2. History of <strong>Rowville</strong> rail line<br />

A rail line to <strong>Rowville</strong> has been talked about for many years.<br />

This Chapter briefly summarises some of the history.<br />

2.1 Melbourne Transport Plan (1969)<br />

<strong>Final</strong> <strong>Stage</strong> 1 Feasibility <strong>Report</strong><br />

History of <strong>Rowville</strong> rail line<br />

As far as we can establish, a rail line to <strong>Rowville</strong> was first officially proposed in the 1969<br />

Melbourne Transport Plan prepared by the Melbourne Metropolitan Board of Works. It<br />

showed a rail line via <strong>Rowville</strong> and Knox from Huntingdale to Ferntree Gully as well as City-<br />

East Doncaster and Frankston-Lyndhurst links and the City Loop (Figure 2).<br />

Figure 2 – Extract from the 1969 Melbourne Transport Plan<br />

Much has changed since 1969, but of the new route initiatives then proposed, only the City<br />

Loop (opening in 1988) and the Altona-Westona link (extended to Laverton to form a loop)<br />

were built. The <strong>Rowville</strong>, Dandenong and Lyndhurst-Frankston lines were not built, however<br />

other new routes (Cranbourne and South Morang extensions and the Regional <strong>Rail</strong> Link)<br />