04.03.2013 Views

2012 D11 Construction Program_040912.pdf - Ohio Department of ...

2012 D11 Construction Program_040912.pdf - Ohio Department of ...

2012 D11 Construction Program_040912.pdf - Ohio Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Our Mission<br />

To provide easy movement <strong>of</strong> people and goods<br />

from place to place, we will:<br />

Take care <strong>of</strong> what we have;<br />

Make our system work better;<br />

Improve safety;<br />

Enhance capacity.


<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

83 Projects<br />

16 Resurfacing (102 Miles)<br />

15 Bridge/Culvert (18 Structures)<br />

13 Slide/Slope Repairs<br />

2 Realignment/Relocation Projects<br />

5 Safety Improvements<br />

14 Maintenance Projects<br />

3 Facilities Projects<br />

15 Local/Enhancements<br />

OVERVIEW 1


<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

OVERVIEW 2


14 Projects<br />

4 Projects<br />

<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

14 Projects<br />

6 Projects<br />

2 Projects<br />

14 Projects<br />

6 Projects 14 Projects<br />

OVERVIEW 3


Proj.<br />

No.<br />

Ref.<br />

PID<br />

<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

BELMONT COUNTY – ODOT Projects<br />

County/Route/Section Location Work Type<br />

110344 80209 BEL-SR148-19.85-19.95<br />

BEL-SR148-22.20-22.57<br />

110259 81265 BEL-US250-7.73<br />

BEL-US250-8.89<br />

West <strong>of</strong> Steinersville<br />

Slide Repair, Roadway<br />

Realignment, & 2<br />

Culvert Replacements<br />

BELMONT COUNTY 4<br />

Award<br />

Date<br />

Estimated Begin-End<br />

<strong>Construction</strong> Dates<br />

Estimated Cost<br />

04/14/11 07/11/11-06/30/12 $4,064,318.63<br />

Near Sunset Heights in Pease Township Slide Repair 05/12/11 03/01/12-07/01/12 $875,248.00<br />

110304 81264 BEL-US250-6.05 Near Sunset Heights in Pease Township Slide Repair 05/26/11 03/01/12-07/01/12 $533,283.00<br />

116058 91484 BEL-SR7-9.90 South <strong>of</strong> Shadyside Slide Repair 09/09/11 03/01/12-05/31/12 $66,945.00<br />

113012 84331<br />

84378<br />

110521 85007<br />

BEL-SR7-6.11-8.68<br />

BEL-SR7-14.09-16.97<br />

JEF-SR7-0.00-14.76<br />

BEL-SR149-24.44-30.87<br />

BEL-SR331-7.55-9.86<br />

75419 BEL-IR470-0.00-6.54 From I-70 to SR 7<br />

Through Dilles Bottom<br />

Between Bellaire and Shadyside<br />

From the Belmont County line to<br />

Steubenville<br />

From U.S. 40 at Morristown to Flushing<br />

Between SR 149 near Flushing and<br />

Uniontown<br />

86873 BEL-SR800-16.08 Over I-70 at Hendrysburg<br />

84384<br />

BEL-US40-6.44-17.69<br />

BEL-SR149-21.37-24.38<br />

BEL-SR9-16.06-23.39<br />

BEL-SR149-1.75-11.00<br />

HAS-SR9-0.00-1.36<br />

From I-70 (Exit 204) near Morristown to<br />

St. Clairsville<br />

From SR 147 at Belmont to U.S. 40 at<br />

Morristown<br />

From the Union Cemetery at St.<br />

Clairsville to the Harrison County line<br />

From Bellaire to Glencoe<br />

From the Belmont County line to SR 149<br />

at New Athens<br />

Safety<br />

(Sign Upgrade)<br />

Resurfacing,<br />

Two-Lane<br />

Resurfacing &<br />

Rehabilitation,<br />

Four-Lane<br />

Bridge Deck<br />

Replacement<br />

Resurfacing,<br />

Two-Lane<br />

Resurfacing,<br />

Two-Lane<br />

11/30/11 01/17/12-10/31/12 $891,750.00<br />

02/16/12 03/05/12-07/31/12 $2,296,346.00<br />

03/01/12 04/02/12-09/30/12 $10,428,927.00<br />

03/15/12 04/02/12-10/31/12 $1,089,017.00<br />

10/17/11 05/02/12-08/31/12 $3,800,105.15<br />

04/19/12 05/04/12-08/31/12 $3,160,513.00<br />

22765 BEL-SR148-12.13 Just east <strong>of</strong> SR 145 Bridge Repair 02/16/12 06/01/12-10/31/12 $1,093,712.00<br />

88042 BEL-IR70-19.92-20.00<br />

BEL-CR28A-0.00-10.00<br />

84013 BEL-IR70-17.52<br />

90815<br />

CAR-County Garage<br />

BEL-St. Clairsville Outpost<br />

Westbound Exit Ramp at Mall Road and<br />

Mall Road Intersection<br />

Over I-70 just east <strong>of</strong> U.S. 40 at St.<br />

Clairsville<br />

258 Kensington Rd., Carrollton<br />

Homeside Addition, St. Clairsville<br />

Safety<br />

(Signal Upgrade)<br />

Bridge Deck<br />

Replacement<br />

Facilities<br />

(Mix Sheds)<br />

05/31/12 06/02/12-10/31/12 $550,071.00<br />

06/14/12 07/15/12-10/31/12 $1,149,449.00<br />

04/19/12 05/01/12-11/16/12 $391,250.00


Proj.<br />

No.<br />

Ref.<br />

PID<br />

<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

BELMONT COUNTY – Local Projects<br />

County/Route/Section Location Work Type<br />

84115 BEL-Brick Tavern<br />

79716 BEL-CR10-9.93<br />

78794 BEL-Tourism Center<br />

At <strong>Ohio</strong> University Eastern Campus, on<br />

the north side <strong>of</strong> U.S. 40 (not mapped)<br />

¾ <strong>of</strong> a mile east <strong>of</strong> SR 9 on Fairpoint<br />

Maynard Road<br />

Courthouse Plaza, 101 West Main Street,<br />

St. Clairsville (not mapped)<br />

Scenic Byway<br />

Enhancement<br />

(New Ro<strong>of</strong>)<br />

BELMONT COUNTY 5<br />

Award<br />

Date<br />

Estimated Begin-End<br />

<strong>Construction</strong> Dates<br />

Estimated Cost<br />

03/07/12 04/04/12-07/06/12 $133,088.00<br />

Slide Repair 02/16/12 03/16/12-08/15/12 $591,582.00<br />

Enhancement<br />

(Restoration <strong>of</strong> the<br />

former Jail and Sheriff's<br />

residence for relocation<br />

<strong>of</strong> the Belmont County<br />

Tourism Office)<br />

05/01/12 06/04/12-10/17/12 $674,801.00


<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

BELMONT COUNTY 6


Proj.<br />

No.<br />

Ref.<br />

PID<br />

<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

CARROLL COUNTY – ODOT Projects<br />

County/Route/Section Location Work Type<br />

120003 84365 CAR-SR164-0.00-7.27<br />

84367<br />

90815<br />

CAR-SR43-24.06-26.66<br />

CAR-SR542-0.00-5.05<br />

COL-SR45-19.63-22.04<br />

CAR-County Garage<br />

BEL-St. Clairsville Outpost<br />

91614 CAR-SR9-22.46<br />

From SR 212 near Leesville to SR 332 at<br />

Perrysville<br />

From Malvern to the Stark County line<br />

From SR 212 to Dellroy<br />

Through Teegarden<br />

258 Kensington Rd., Carrollton<br />

Homeside Addition, St. Clairsville<br />

About 4 ½ miles north <strong>of</strong> SR 171 near<br />

Augusta<br />

Resurfacing,<br />

Two-Lane<br />

Resurfacing,<br />

Two-Lane<br />

Facilities<br />

(Mix Sheds)<br />

CARROLL COUNTY 7<br />

Award<br />

Date<br />

Estimated Begin-End<br />

<strong>Construction</strong> Dates<br />

Estimated Cost<br />

01/19/12 04/15/12-06/30/12 $1,150,220.00<br />

03/01/12 04/30/12-07/31/12 $1,410,359.00<br />

04/19/12 05/01/12-11/16/12 $391,250.00<br />

Bridge Repair 06/14/12 07/16/12-08/15/12 $170,000.00


<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

CARROLL COUNTY 8


Proj.<br />

No.<br />

Ref.<br />

PID<br />

92242<br />

<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

COLUMBIANA COUNTY – ODOT Projects<br />

County/Route/Section Location Work Type<br />

COL-County Garage<br />

TUS-County Garage<br />

92039 COL-US30-14.40<br />

U.S. 30, Lisbon<br />

Stonecreek Rd., New Philadelphia<br />

Just west <strong>of</strong> Center Twp. Rd. 757 (Crosser)<br />

between Lisbon and Hanoverton<br />

Facilities<br />

(Wash Water System)<br />

COLUMBIANA COUNTY 9<br />

Award<br />

Date<br />

Estimated Begin-End<br />

<strong>Construction</strong> Dates<br />

Estimated<br />

Cost<br />

06/01/12 07/01/12-10/01/12 $70,000.00<br />

Slide Repair 04/26/12 05/01/12-09/15/12 $544,550.00<br />

116089 91520 COL-SR7-17.80-19.20 South <strong>of</strong> the SR 154 intersection in Rogers Slide Repair 11/14/11 11/28/11-05/31/12 $837,698.50<br />

86836 COL-US30-18.32-18.40<br />

120028 84009 COL-SR11-11.41 At West Point<br />

From Beaver Street to Jefferson Street in<br />

Lisbon<br />

Safety<br />

(Signal Upgrade)<br />

Bridge Deck<br />

Replacement<br />

03/01/12 04/02/12-10/31/12 $348,149.00<br />

02/02/12 04/15/12-08/31/12 $1,417,276.00<br />

84005 COL-SR7-0.58 About a ½ mile south <strong>of</strong> SR 39 at Wellsville Bridge Repair 03/15/12 04/15/12-10/31/12 $1,276,065.00<br />

84385 COL-SR172-8.96-16.09<br />

From SR 9 at New Garden to U.S. 30 near<br />

Lisbon<br />

Resurfacing,<br />

Two-Lane<br />

03/29/12 04/16/12-06/30/12 $1,386,560.00<br />

110538 84016 COL-SR46-0.00-1.37<br />

COL-SR170-14.22-14.96<br />

In East Palestine<br />

Resurfacing,<br />

Two-Lane<br />

10/28/11 05/01/12-07/31/12 $487,202.10<br />

92041 COL-US30-16.80 About a ½ mile east <strong>of</strong> SR 172 near Lisbon Slide Repair 04/19/12 05/15/12-08/31/12 $390,600.00<br />

87269 COL-SR267-0.00-1.74<br />

In East Liverpool, from SR 7 to the city’s<br />

north corp. line<br />

Resurfacing,<br />

Two-Lane<br />

05/03/12 06/01/12-08/31/12 $396,697.00<br />

84325 COL-US62-10.83<br />

COL-US62-11.24<br />

Intersection <strong>of</strong> U.S. 62 and SR 45<br />

Intersection <strong>of</strong> U.S. 62 and SR 14<br />

Safety<br />

(Signal Maintenance<br />

& Repair)<br />

05/17/12 06/15/12-09/30/12 $387,848.00<br />

86874 COL-SR39-1.41 Just east <strong>of</strong> SR 644 in Salineville<br />

Bridge Deck<br />

Replacement<br />

06/14/12 07/14/12-12/31/12 $815,827.00<br />

84266 COL-SR344-8.19<br />

Just east <strong>of</strong> Leetonia at the SR 11<br />

Interchange<br />

Bridge Deck<br />

Replacement<br />

06/14/12 07/15/12-10/31/12 $3,261,224.00<br />

84367<br />

CAR-SR43-24.06-26.66<br />

CAR-SR542-0.00-5.05<br />

COL-SR45-19.63-22.04<br />

From Malvern to the Stark County line<br />

From SR 212 to Dellroy<br />

Through Teegarden<br />

Resurfacing,<br />

Two-Lane<br />

03/01/12 04/30/12-07/31/12 $1,410,359.00


Proj.<br />

No.<br />

Ref.<br />

PID<br />

92486<br />

<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

COLUMBIANA COUNTY – Local Projects<br />

County/Route/Section Location Work Type<br />

COL-CR400-0.00-13.03<br />

COL-CR410-0.00-7.41<br />

COL-CR410-1.25-1.45<br />

91016 COL-Clark Avenue<br />

118019 89328 COL-CR443-0.34-0.98<br />

(Brookdale Avenue)<br />

COL-CR428-0.00-0.87<br />

89333<br />

COL-CR511-0.50-0.56<br />

COL-CR511-0.59-1.31<br />

COL-CR511-1.31-1.54<br />

89359 COL-CR422-2.93-3.25<br />

92488<br />

COL-CR418-0.00-2.92<br />

COL-CR420-0.00-3.51<br />

COL-CR424-0.00-3.88<br />

COL-CR428-3.73-5.72<br />

COL-CR430-2.16-3.30<br />

COL-CR430-5.63-5.86<br />

Stark Co. line to the Salem corp. line<br />

From U.S. 30 to Twp. Rd. 850<br />

From the Salem corp. to U.S. 62<br />

Ramp “A” to River Rd., Columbiana County<br />

Port Authority (not mapped)<br />

In East Palestine, from West Martin Street to<br />

the village’s north corp. line<br />

In East Liverpool, St. Clair Ave. from Sixth<br />

to McKinnon, also McKinnon Ave., Main<br />

Blvd., and Ambrose Ave.<br />

Main Street in Columbiana, from the<br />

intersection <strong>of</strong> Norfolk RR to public square<br />

Wellsville to SR 39<br />

SR 517 to Columbiana<br />

CR 425 to Lyle Street<br />

CR 430 to TR 1004<br />

SR 170 to CR 435<br />

Pennsylvania state line west<br />

COLUMBIANA COUNTY 10<br />

Award<br />

Date<br />

Estimated Begin-End<br />

<strong>Construction</strong> Dates<br />

Estimated<br />

Cost<br />

Resurfacing 07/01/12 07/15/12-10/15/12 $2,148,000.00<br />

Resurfacing 03/09/12 04/06/12-07/13/12 $185,381.00<br />

Resurfacing 08/18/11 05/01/12-06/15/12 $255,149.86<br />

Resurfacing 06/14/12 06/25/12-10/31/12 $1,372,165.00<br />

Enhancement<br />

(Streetscape)<br />

07/02/12 08/01/12-05/31/13 $1,342,000.00<br />

Resurfacing 08/08/12 08/15/12-11/01/12 $1,432,500.00


<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

COLUMBIANA COUNTY 11


Proj.<br />

No.<br />

Ref.<br />

PID<br />

<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

HARRISON COUNTY – ODOT Projects<br />

County/Route/Section Location Work Type<br />

HARRISON COUNTY 12<br />

Award<br />

Date<br />

Estimated Begin-End<br />

<strong>Construction</strong> Dates<br />

Estimated Cost<br />

91659 HAS-SR800-7.80 Just north <strong>of</strong> CR 69, south <strong>of</strong> Tippecanoe Slide Repair 03/22/12 09/01/12-11/15/12 $960,500.00<br />

110617 87539 HAS-ODNR State Forest<br />

84383<br />

HAS-US250-30.24-31.03<br />

JEF-US250-0.00-2.51<br />

Harrison State Forest between Jewett and<br />

Cadiz (not mapped)<br />

Through Harrisville<br />

Between the Harrison and Belmont County<br />

lines<br />

Resurfacing, Two-Lane 12/08/11 04/01/12-06/30/12 $438,213.35<br />

Resurfacing, Two-Lane 02/02/12 04/01/12-06/30/12 $704,415.00<br />

78034 HAS-SR646-16.13 About one mile north <strong>of</strong> SR 9 near Germano Relocation 03/29/12 05/01/12-10/31/12 $1,798,182.00<br />

84714 HAS-SR258-1.67 Just west <strong>of</strong> Twp. Rd. 101 (Stull Rd.) Slide Repair 02/24/12 03/01/12-07/31/12 $500,000.00<br />

BEL-SR9-16.06-23.39 From the Union Cemetery at St. Clairsville<br />

to the Harrison County line<br />

84384 BEL-SR149-1.75-11.00 From Bellaire to Glencoe<br />

Resurfacing, Two-Lane 04/19/12 05/04/12-08/31/12 $3,160,513.00<br />

HAS-SR9-0.00-1.36 From the Belmont County line to SR 149 at<br />

New Athens


<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

HARRISON COUNTY 13


Proj.<br />

No.<br />

Ref.<br />

PID<br />

<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

HOLMES COUNTY – ODOT Projects<br />

County/Route/Section Location Work Type<br />

24982 HOL-SR83-15.04<br />

92999<br />

HOL-SR39-27.83-32.49<br />

HOL-SR557-6.54-6.55<br />

HOL-SR557-8.21-8.22<br />

2 ½ miles south <strong>of</strong> the Wayne County<br />

line<br />

From the Tuscarawas County line to<br />

just west <strong>of</strong> SR 515 at Walnut Creek<br />

Just north <strong>of</strong> Charm<br />

Just south <strong>of</strong> CR 407 & Twp. Rd. 356<br />

92257 HOL-VAR GR Phase 7 Various county routes<br />

84037 HOL-County Trail Phase 5A<br />

HOLMES COUNTY 14<br />

Award<br />

Date<br />

Estimated Begin-End<br />

<strong>Construction</strong> Dates<br />

Estimated<br />

Cost<br />

Bridge Replacement 03/01/12 04/15/12-10/31/12 $1,398,970.00<br />

Resurfacing<br />

(Shoulder Reconstruction)<br />

HOLMES COUNTY – Local Projects<br />

Knox Co. Mohican Valley Trail to<br />

Holmes County Rd. 10 on the Holmes<br />

County Trail in Brinkhaven (not<br />

mapped)<br />

Safety<br />

(Guardrail Reconstruction)<br />

Enhancement<br />

(Bikeway)<br />

07/02/12 08/01/12-10/31/12 $2,300,000.00<br />

08/09/12 09/06/12-11/09/12 $300,000.00<br />

10/01/12 11/01/12-05/01/13 $1,214,217.00


<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

HOLMES COUNTY 15


Proj.<br />

No.<br />

Ref.<br />

PID<br />

<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

JEFFERSON COUNTY – ODOT Projects<br />

County/Route/Section Location Work Type<br />

JEFFERSON COUNTY 16<br />

Award<br />

Date<br />

Estimated Begin-End<br />

<strong>Construction</strong> Dates<br />

Estimated Cost<br />

110227 24979 JEF-SR7-8.56-9.92 South <strong>of</strong> SR 151 at Brilliant Bridge Repair 04/14/11 07/01/11-06/30/12 $2,699,980.53<br />

91501 JEF-SR150-9.20 Just east <strong>of</strong> Warren Twp. Rd. 114 and Dillonvale Slide Repair 08/01/12 09/01/12-04/01/13 $470,677.00<br />

110418 79175 JEF-SR822-0.27 Fort Steuben Bridge<br />

Bridge<br />

Removal/Demolition<br />

07/07/11 01/11/12-07/30/12 $2,259,059.50<br />

116019 90969<br />

JEF-SR7-34.20<br />

JEF-SR7-21.3<br />

Near Yellow Creek in Saline Township<br />

Near the Pottery Addition Exit<br />

Rock Slope Repair 07/25/11 09/01/11-05/15/12 $8,973,251.04<br />

110475 86841 JEF-SR43-0.79-5.20 In Steubenville and Wintersville<br />

Safety<br />

(Sign Upgrade)<br />

08/18/11 02/13/12-05/31/12 $308,775.00<br />

23736 JEF-SR7-19.21-22.97<br />

From just north <strong>of</strong> SR 213 at Alikanna to just<br />

north <strong>of</strong> CR 56 near Costonia<br />

Resurfacing,<br />

Four-Lane<br />

03/29/12 04/15/12-09/30/12 $5,298,570.00<br />

87818 JEF-SR213-0.04-8.83 From U.S. 22 to SR 152<br />

Resurfacing,<br />

Two-Lane<br />

01/19/12 05/01/12-07/31/12 $1,704,663.00<br />

84006 JEF-SR7-8.17 At Brilliant, about 3 ½ miles south <strong>of</strong> SR 151<br />

Bridge Deck<br />

Replacement<br />

04/19/12 05/01/12-10/31/12 $1,900,380.00<br />

25498 JEF-US22-7.33-10.21 From just east <strong>of</strong> CR 166 to SR 43<br />

Resurfacing,<br />

Four-Lane<br />

05/17/12 05/31/12-10/31/12 $3,193,923.00<br />

81487 JEF-SR7-14.78-17.62 Through Steubenville<br />

Resurfacing,<br />

Four-Lane<br />

05/31/12 06/25/12-12/31/12 $3,149,563.00<br />

81015 JEF-SR7-5.00-6.00 At Rush Run Slide Repair 05/15/12 06/01/12-10/31/12 $33,835,000.00<br />

85895 JEF-County Garage<br />

113012 84331<br />

BEL-SR7-6.11-8.68<br />

BEL-SR7-14.09-16.97<br />

JEF-SR7-0.00-14.76<br />

84383 HAS-US250-30.24-31.03<br />

JEF-US250-0.00-2.51<br />

90233<br />

JEF-Lover’s Lane<br />

Connector<br />

Along CR 43 just south <strong>of</strong> the Jefferson County<br />

Industrial Park<br />

Through Dilles Bottom<br />

Between Bellaire and Shadyside<br />

From the Belmont County line to Steubenville<br />

Through Harrisville<br />

Between the Harrison and Belmont County lines<br />

Facilities<br />

(New <strong>Construction</strong>)<br />

Safety<br />

(Sign Upgrade)<br />

Resurfacing,<br />

Two-Lane<br />

JEFFERSON COUNTY – Local Project<br />

03/22/12 07/01/12-05/31/13 $5,000,000.00<br />

11/30/11 01/17/12-10/31/12 $891,750.00<br />

02/02/12 04/01/12-06/30/12 $704,415.00<br />

In Steubenville, from SR 43 to CR 43 Resurfacing 08/01/12 09/01/12-10/31/12 $930,000.00


<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

JEFFERSON COUNTY 17


Proj.<br />

No.<br />

Ref.<br />

PID<br />

110326 84270 TUS-US36-16.73<br />

<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

TUSCARAWAS COUNTY – ODOT Projects<br />

County/Route/Section Location Work Type<br />

About a mile west <strong>of</strong> U.S. 250 at Trenton<br />

Avenue<br />

TUSCARAWAS COUNTY 18<br />

Award<br />

Date<br />

Estimated Begin-End<br />

<strong>Construction</strong> Dates<br />

Estimated<br />

Cost<br />

Bridge Replacement 05/26/11 09/19/11-06/30/12 $1,424,311.29<br />

116088 92025 TUS-US36-16.00 Between Indian Hill Rd. and the Y Tavern Slope Repair 11/10/11 12/12/11-05/25/12 $243,458.20<br />

80130 TUS-IR77-28.62<br />

84411 TUS-IR77-32.33<br />

91711 TUS-SR800-4.01<br />

92242<br />

COL-County Garage<br />

TUS-County Garage<br />

90354 TUS-SR800-7.39-7.58<br />

85338<br />

TUS-Dennison Depot,<br />

Phase 7<br />

75580 TUS-TR62-305<br />

On Twp. Rd. 420 (Reed Rd.) over I-77 just<br />

north <strong>of</strong> the Strasburg Exit<br />

Over I-77, 1 mile south <strong>of</strong> SR 212 at<br />

Bolivar<br />

Just north <strong>of</strong> Mill Twp. Rd. 167 and<br />

Tippecanoe<br />

U.S. 30, Lisbon<br />

Stonecreek Rd., New Philadelphia<br />

Bridge Replacement 03/15/12 05/01/12-12/31/12 $1,744,871.00<br />

Bridge Deck<br />

Replacement<br />

03/29/12 05/01/12-09/30/12 $1,179,079.00<br />

Slide Repair 05/31/12 07/31/12-09/30/12 $19,586.00<br />

Facilities<br />

(Wash Water System)<br />

TUSCARAWAS COUNTY – Local Projects<br />

At CR 37 (Pleasant Valley Rd.)<br />

intersection<br />

400 Center Street, Dennison<br />

In Wayne Township, just north <strong>of</strong> SR 93<br />

over South Fork <strong>of</strong> Sugar Creek<br />

Safety<br />

(Intersection<br />

Improvement)<br />

Enhancement<br />

(Renovation <strong>of</strong> 2 historic<br />

train car coaches)<br />

06/01/12 07/01/12-10/01/12 $70,000.00<br />

01/18/12 04/02/12-08/15/12 $888,072.00<br />

03/15/12 04/15/12-12/15/12 $615,000.00<br />

Bridge Replacement 06/04/12 07/01/12-11/01/12 $490,000.00


<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

TUSCARAWAS COUNTY 19


<strong>2012</strong> DISTRICT 11 CONSTRUCTION PROGRAM<br />

ODOT MAINTENANCE PROJECTS (Not Mapped)<br />

Proj. No. Ref. PID Project Name Work Type Award Date<br />

100319 88007 <strong>D11</strong> Signal Relamping<br />

100528 86968 <strong>D11</strong> MOW FY 2011B<br />

100577 86967 <strong>D11</strong> MOW FY 2011A<br />

110404 88641 <strong>D11</strong> LG FY <strong>2012</strong><br />

110532 88642 <strong>D11</strong> PM FY <strong>2012</strong>A<br />

120023 88473 <strong>D11</strong> CH FY <strong>2012</strong><br />

110616 88643 <strong>D11</strong> PM FY <strong>2012</strong>B<br />

88644 <strong>D11</strong> RPM FY <strong>2012</strong><br />

90560 <strong>D11</strong> HS FY <strong>2012</strong>A<br />

90561 <strong>D11</strong> HS FY <strong>2012</strong>B<br />

88474 <strong>D11</strong> GR FY <strong>2012</strong><br />

90569 <strong>D11</strong> PM FY 2013B<br />

90573 <strong>D11</strong> LG FY 2013<br />

85141 <strong>D11</strong> CS FY 2013<br />

Safety<br />

(Districtwide LED, Signal Back Plates/Tether<br />

Signal Replacement)<br />

Maintenance<br />

(Mowing: Columbiana, Harrison & Jefferson)<br />

Maintenance<br />

(Mowing: Belmont Jefferson & Tuscarawas)<br />

Maintenance<br />

(Lighting)<br />

Safety<br />

(Pavement Marking)<br />

Maintenance<br />

(Cleaning/Sweeping Highways)<br />

Safety<br />

(Pavement Marking)<br />

Safety<br />

(Raised Pavement Markers)<br />

Maintenance<br />

(Herbicidal Spraying: Belmont, Harrison &<br />

Jefferson)<br />

Maintenance<br />

(Herbicidal Spraying: Carroll, Columbiana,<br />

Holmes & Tuscarawas)<br />

Maintenance<br />

(Guardrail Repair/Reconstruction)<br />

Safety<br />

(Pavement Marking)<br />

Maintenance<br />

(Lighting)<br />

Preventive Maintenance<br />

(Crack Sealing)<br />

Estimated Begin-End<br />

<strong>Construction</strong> Dates<br />

Estimated Cost<br />

05/27/10 01/23/12-07/31/12 $867,375.00<br />

10/28/10 05/02/11-10/31/12 $133,080.00<br />

12/09/10 05/09/11-10/31/12 $236,000.00<br />

06/24/11 08/01/11-07/31/12 $328,625.00<br />

10/17/11 04/01/12-05/15/13 $255,019.00<br />

01/19/12 04/01/12-06/30/12 $201,228.00<br />

12/09/11 04/02/12-03/15/13 $1,615,000.00<br />

02/02/12 04/02/12-05/15/13 $250,057.00<br />

02/16/12 05/01/12-09/30/12 $100,000.00<br />

02/16/12 05/01/12-09/30/12 $125,000.00<br />

06/14/12 07/01/12-04/01/13 $933,124.00<br />

07/02/12 07/16/12-10/31/13 $1,800,000.00<br />

07/02/12 07/23/12-07/31/13 $380,000.00<br />

07/02/12 07/31/12-10/26/12 $900,735.00<br />

MAINTENANCE PROJECTS 20


For more information, contact:<br />

District 11 Deputy Director Lloyd MacAdam, P.E., P.S., CPM at (330) 308-3950,<br />

District 11 <strong>Construction</strong> Administrator Nick Susich, P.E. at (330) 308-7809, or<br />

District 11 Public Information Officer Becky Giauque at (330) 308-3949.<br />

For general information, call (330) 339-6633, or<br />

Visit www.Transportation.<strong>Ohio</strong>.Gov/Dist11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!