04.03.2013 Views

BULETINUL INSTITUTULUI POLITEHNIC DIN IAŞI - Universitatea ...

BULETINUL INSTITUTULUI POLITEHNIC DIN IAŞI - Universitatea ...

BULETINUL INSTITUTULUI POLITEHNIC DIN IAŞI - Universitatea ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

264 Olga Marina Montes and Vasile V. Merticaru<br />

3.2. Analysis of geographical conditions<br />

In this section it has been checked that the chosen area has all the natural<br />

security conditions necessary for any deployment. There have been key issues<br />

such as security of land, about flooding (unlikely), forest fires, erosion and<br />

deforestation. With respect to climate and the presence or absence of surface<br />

water, to implement the factory has no special requirements. With regard to the<br />

existence of communications, industrial estate where the plant will be located<br />

has good links. This is a site near Valladolid, capital of the Community of<br />

Castilla y Leon and also is close to Madrid, capital of Spain, and near the<br />

national road Nº1, the road which connects the center of the country to the<br />

north. Communications are important both for the supply of waste glass and to<br />

deliver the finished products.<br />

In the community Castilla y León there are important industries like<br />

Renault, Michelin, Iveco, Pascual, Firestone, and the glass waste from these<br />

industries should be the materials the plant will recycle. Also, Madrid is near of<br />

the location, and the plant can recycle the waste from the industries of these<br />

regions or from other regions of the country.<br />

3.3. Analysis of urban conditions<br />

Each plot of the considered area has planning conditions that define the<br />

amount and location of the intended buildings. The following data provide some<br />

of the characteristics of the industrial area of the town of San Miguel del<br />

Arroyo.<br />

General Information - Surfaces:<br />

• Total area: 86,810.27 m²;<br />

• Endowment Surface: 5201.32 m²;<br />

• Public open space (green areas): 40,672.98 m²;<br />

• Maximum Plot: 2868.74 m²; Minimum Plot: 177.18 m²;<br />

• Minimum strippable: 175 m².<br />

Other Data:<br />

• Number of plots: 44; Free Plots: 11;<br />

• Access roads: Yes, in concrete pavement;<br />

• Supplies: Yes, municipal network;<br />

• Sanitation: Yes, primary treatment;<br />

• Lighting: Yes; Electricity: Yes; Gas: Yes;<br />

• Telecommunications: Yes.<br />

• Rules planning: Municipal Town Planning Regulations;<br />

• Maximum building height: 7 m and 10 m ridge cornice;<br />

• Setback: 5.00 m and 3.00 m front edge - rear edge.<br />

The previous planning conditions have been of paramount importance when<br />

deciding the final location of the plant.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!