May 2010
- Page 5 and 6:
3.4.1 Receipt of Information Regard
- Page 7 and 8:
8.2.7.1 Consultation of Operational
- Page 9 and 10:
Figure 3.1 SSMP Organizational Char
- Page 11 and 12:
[ Revision Date: April 23, 2010 ?Ò
- Page 13 and 14:
and maintained by the East Bay Muni
- Page 15 and 16:
Table 1.1 Service Population Estima
- Page 17 and 18:
As part of the GWDRs, all agencies
- Page 19 and 20:
1.9 ACKNOWLEDGEMENTS Carollo Engine
- Page 21 and 22:
1.11 REFERENCE MATERIAL The followi
- Page 23 and 24:
2.3 PORT SSMP GOALS In order to ach
- Page 25:
County Environmental Health Agency,
- Page 28 and 29:
• Facility Support Supervisor. Th
- Page 30 and 31:
3.3.1.5 Commercial/Real Estate Divi
- Page 32:
for reporting SSOs. For more inform
- Page 36 and 37:
2. Category 1 SSOs that Do Not Reac
- Page 38 and 39:
Chapter 4 LEGAL AUTHORITY This chap
- Page 40 and 41:
noted in Section 4.3.4 and Section
- Page 42 and 43:
“The Director [of EBMUD] may requ
- Page 44 and 45:
cleaning of the sanitary sewer syst
- Page 46 and 47:
10'' Legend 6'' ) Clarifier ) Drain
- Page 48 and 49:
BEACH FRWY Legend LILAC ST MAGNOLIA
- Page 50 and 51:
Table 5.1 Sanitary Sewer Collection
- Page 52 and 53:
It is further recommended that sewe
- Page 54 and 55:
Table 5.4 Aviation Sewer Maintenanc
- Page 56 and 57:
Legend ) Clarifier ) Drain Box ) Di
- Page 58 and 59:
BEACH FRWY Legend LILAC ST MAGNOLIA
- Page 60 and 61:
Legend ) Clarifier ) Drain Box ) Di
- Page 62 and 63:
Legend ) Clarifier ) Drain Box ) Di
- Page 64 and 65:
Table 5.6 Lift Station Preventative
- Page 66 and 67:
were created for each unique pipeli
- Page 68 and 69:
Chapter 6 DESIGN AND PERFORMANCE PR
- Page 70 and 71:
To comply with the GWDRs and the SW
- Page 72 and 73: f. A program to ensure that all rea
- Page 75 and 76: 7.2.1.5 Section 3.2 of the Port OER
- Page 78 and 79: maritime sewer system, Port staff s
- Page 80 and 81: Chapter 8 FOG CONTROL PLAN This cha
- Page 82 and 83: FSF is required to keep a copy of t
- Page 84 and 85: 3. The facility has caused or contr
- Page 86 and 87: Table 8.2 Best Management Practices
- Page 88 and 89: 8.2.8 FOG Problem Areas Based on th
- Page 90 and 91: Table 8.3 FOG Related Sanitary Sewe
- Page 92 and 93: and redundancy in pumping capacity,
- Page 94 and 95: Table 9.2 Minimum Slope for New Sew
- Page 96 and 97: There is a significant I/I response
- Page 98 and 99: POND DIKE ROAD Legend HARBOR PARKWA
- Page 100 and 101: Table 9.3 Capital Improvement Proje
- Page 102 and 103: main sources of runoff into the col
- Page 104 and 105: Table 9.5 High Priority Improvement
- Page 106 and 107: Chapter 10 MONITORING, MEASUREMENT,
- Page 108 and 109: • SSO Data. The overall purpose a
- Page 110 and 111: Chapter 11 SSMP PROGRAM AUDITS This
- Page 112 and 113: corrective actions and by the need
- Page 114 and 115: Table 11.2 Example Sewer Maintenanc
- Page 116 and 117: scheduled and why, and to determine
- Page 118 and 119: Chapter 12 COMMUNICATION PROGRAM AN
- Page 120 and 121: pw://Carollo/Documents/Client/CA/Po
- Page 124 and 125: pw://Carollo/Documents/Client/CA/Po
- Page 126 and 127: pw://Carollo/Documents/Client/CA/Po
- Page 128 and 129: pw://Carollo/Documents/Client/CA/Po
- Page 130 and 131: pw://Carollo/Documents/Client/CA/Po
- Page 132 and 133: pw://Carollo/Documents/Client/CA/Po
- Page 134 and 135: pw://Carollo/Documents/Client/CA/Po
- Page 136 and 137: pw://Carollo/Documents/Client/CA/Po
- Page 138 and 139: pw://Carollo/Documents/Client/CA/Po