Installation Instructions<br />

Some generators are equipped with an additional cooling<br />

water cap.<br />

This only serves for the first filling at the factory.<br />

This cap may not be opened when the generator is installed<br />

(hot cooling water may escape). Risk of scalding!<br />

Sample picture<br />

5.16 Isolation test<br />

After installation, before bringing into service and<br />

handover of the generator to the customer, an isolation<br />

test has to be accomplished as follows:<br />

ATTENTION!<br />

Fig. 5.15.3-2: Cooling water cap<br />

1. Switch off all electrical load.<br />

2. Start the generator.<br />

3. Measure the AC-voltage with a voltmeter (adjust to Volt/AC) between:<br />

a) generator housing and AC-Control box<br />

b) generator housing and ground.<br />

The measured voltage must not exceed 50 mV (millivolt).<br />

4. Once the safety systems have been installed, they must be checked. If a leakage current relay (RCD) has been<br />

installed, it also has to be tested in order to ensure that all contacts are connected properly. The individual<br />

phases have to be checked against each other, and between phase and ground. An additional 4th phase (L1’)<br />

also needs to be checked at generators with DVS winding.<br />

5. If the generator is protected by a ground connection, it has to be ensured that ALL electrical devices must also be<br />

connected to this „common“ ground (usually ground contacts are attached to the device’s metallic housing).<br />

The electrical system installation must also comply with the hook-up requirements of the shore current grid. Generally<br />

a leakage current relay (RCD) is sufficient for safe electrical operation; howewver, this must be confirmed by the<br />

electrical safety standard in the region where the system is attached to a main land power grid. The release current<br />

of the relay (RCD) has to meet the installation circumstances.<br />

5.17 Initial Operation<br />

After successful installation an initial operation has to be performed.<br />

For this purpose the initial operation record has to be completely filled out by the installing expert. The filled record<br />

has to be handed out to the owner.<br />

The owner has to be instructed regarding handling, servicing and risks of the generator. This applies to the service<br />

steps and risks mentioned in the manual as well as further risks which may arise from the specific installation and<br />

the connected components.<br />

7.5.12 Panda_4000s_PMS_SCB_FCB_eng.R04 - Kapitel/Chapter 5: Installation Instructions Seite/Page 93