BHARAT SANCHAR NIGAM LIMITED<br />

(A Govt. of India Enterprise)<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

TENDER DOCUMENTS / FINANCIAL BID<br />

1<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

Name of the work : Construction of tower foundation for 40mtr high tower at BTS sites<br />

in Tohana Tehsil(Sirsa) [Kanheri, Samain, Jamal Pur Shekhan]<br />

Under Phase V.2<br />

Name of the Firm: …………………………………………………………………..<br />

These <strong>tender</strong> <strong>documents</strong> (Financial Bid) contain 32(Thirty Two) pages only.<br />

Note: In case of <strong>tender</strong> <strong>documents</strong> downloaded from the website,<br />

1. The firms are advised to put page numbers on all the enclosures and sign on each<br />

page of the eligibility document including the enclosures.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


To<br />

The Executive Engineer (C),<br />

BSNL Civil Division,<br />

Rohtak<br />

APPLICATION FORM<br />

2<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

Sub: Application (along with eligibility <strong>documents</strong>) for <strong>tender</strong>ing for the work “Construction of tower foundation for<br />

40mtr high tower at BTS sites in Tohana Tehsil(Sirsa) [Kanheri, Samain, Jamal Pur Shekhan]<br />

Under Phase V.2<br />

Sir,<br />

I am registered with the BSNL/DOT, CPWD, MES, D.O.P, Railway, Haryana State PWD (B&R) as Class ……..<br />

contractor and my Registration No. is ……… ………….. …………… ……………. ……… I am eligible to submit<br />

<strong>tender</strong>s for works costing upto Rs. ………… Lakhs.<br />

I,_____ _______ _________ _______ _____s/o Shri__ _______ ________ ________ __Resident of ____ ___<br />

___ ___ ___ ___ ___ ___ ___ ___ ___ hereby certify that none of my relative (s) as defined above is/are<br />

employed in concerned BSNL Civil Zone. In case at any stage, it is found that the information given by me is<br />

false / incorrect, BSNL shall have the absolute right to take any action as deemed fit without any prior intimation<br />

to me.<br />

It is certified (confirmed) that this registration is valid as on date and I shall inform the department myself as soon<br />

as my registration expires or is cancelled/revoked.<br />

It is requested that we may be allowed to take part in the <strong>tender</strong>ing (Financial Bid)<br />

Date: …………………<br />

Place: ………………...<br />

Yours Faithfully,<br />

(Contractor)<br />

Name…………………………………<br />

Address. ………………………………<br />

………………………………..<br />

…………………………………<br />

Contact Phone No.: ……………………………….<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


CHECK LIST FOR ENCLOSURES<br />

Please check that the following <strong>documents</strong> have been enclosed along with the application:-<br />

Sr.<br />

No.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

Document Attached *<br />

Attested copy of the registration/ enlistment with DOT/BSNL,<br />

CPWD,DOP, MES, Railway and Haryana State PWD (B&R) etc.<br />

Attested Copy of partnership deed in case of partnership firm and<br />

Article & Memorandum of Association and certificate of incorporation in<br />

case of a company.<br />

Attested copy of Power of Attorney of signatory of the Tender/ Attested<br />

copy of proof of authority to sign the <strong>tender</strong>.<br />

Tender fee as detailed in the Notice Inviting Tender has been<br />

enclosed.<br />

Earnest money as detailed in the Notice Inviting Tender has been<br />

enclosed.<br />

All the pages of application and enclosures have been duly numbered<br />

and signed by authorized signatory.<br />

(* Strike out inapplicable portion)<br />

Date: ……………<br />

Place…………..<br />

3<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

Yes / No<br />

Yes / No /NA<br />

Yes / No<br />

Yes / No<br />

Yes / No<br />

Yes / No<br />

Signature of Applicant<br />

No. of<br />

sheets<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


BHARAT SANCHAR NIGAM LIMITED<br />

(A GOVERNMENT OF INDIA ENTERPRISE)<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

NOTICE INVITING TENDER<br />

4<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

1. Item rate <strong>tender</strong>s are invited on behalf of BHARAT SANCHAR NIGAM LIMITED (A Government of India Enterprise) from<br />

approved and eligible contractors registered with D.O.T./BSNL and enlisted agency, enlisted in CPWD, Haryana State<br />

PWD (B&R), D.O.P, MES, Railway for the following work:-<br />

SL.<br />

Name of Work Estimated Cost Earnest Money Time for<br />

No.<br />

(Rs.)<br />

(Rs.)<br />

completion<br />

1. Construction of tower<br />

foundation for 40mtr high tower<br />

at BTS sites in Tohana<br />

Tehsil(Sirsa) [Kanheri, Samain,<br />

904357.00 18087.00 30(thirty) days<br />

Jamal Pur Shekhan] Under<br />

Phase V.2.<br />

Last Date of receipt of application : 11.09.2009 upto 16.00 hrs.<br />

Last date of issue of <strong>tender</strong> from the Division Office : 14.09.2009 upto 16.00 hrs.<br />

Last date and time of submission of <strong>tender</strong> : 15.09.2009 up to 15.00 hrs.<br />

Date and time of Opening of Tender : 15.09.2009 at 15.30 hrs.<br />

Cost of<br />

<strong>documents</strong><br />

Rs. 563.00<br />

2. All the intending <strong>tender</strong>ers other than those contractors enlisted with BSNL/DOT should have successfully completed<br />

similar works during last 7 years ending 31.07.2009. Tenders will be issued to eligible contractors provided they<br />

produce definite proof from the appropriate authority not below the rank of Executive Engineer of having successfully<br />

completed works of magnitude as specified below. It is clarified that the works done for by Central Govt. /State Govt./<br />

PSU (PSU means an autonomous body which is under the state Govt./ Central Govt. like development authority,<br />

municipal corporations, universities run by the Govt.) shall only be considered for eligibility.<br />

(i) Three similar completed works costing not less than the amount equal to 40% of the estimated cost<br />

OR<br />

(ii) Two similar completed works costing not less than the amount equal to 50% of the estimated cost<br />

OR<br />

(iii) One similar completed works costing not less than the amount equal to 80% of the estimated cost<br />

Note: Similar works in the above Para means construction of Admn./ Technical buildings & staff quarters in RCC<br />

framed constructions & or load bearing constructions, tower foundation etc.<br />

3. The <strong>tender</strong> <strong>documents</strong> can be purchased from the Office of the Executive Engineer (C), BSNL Civil Division,<br />

Rohtak between 11.00 AM to 4.00 PM on all working days (upto last date of application) upon application along with<br />

the requisite <strong>tender</strong> fee as indicated above per set (non-refundable) in D.D./Pay order of a Scheduled Bank drawn in<br />

favour of Accounts Officer (Cash), O/O Executive Engineer[C], BSNL Civil Division, Faridabad.<br />

4. The complete application form and <strong>tender</strong> <strong>documents</strong> can also be downloaded from the web site<br />

www.haryana.bsnl.co.in/civil In case the <strong>tender</strong> document is downloaded from the website, the applicant will<br />

submit the cost of <strong>tender</strong> and his credentials required to establish his eligibility and <strong>tender</strong> <strong>documents</strong> in the manner<br />

detailed in the Tender Documents (BSNL W-6).<br />

5. The <strong>tender</strong> <strong>documents</strong> shall not be sent through Courier/Post. The <strong>tender</strong> <strong>documents</strong> received through courier/post<br />

shall not be opened / considered at all.<br />

6. In case holiday falls on or is declared on any of the above dates, the date shall stand extended to the next working<br />

day.<br />

7. The detailed NIT, <strong>tender</strong> <strong>documents</strong>, schedule of quantities and terms and conditions of the contract can be seen in<br />

the office of EE(C), BSNL Civil Division, Rohtak or downloaded from website www.haryana.bsnl.co.in/civil.<br />

Sd/-<br />

Executive Engineer (C)<br />

BSNL Civil Division<br />

Rohtak – 124001<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


BHARAT SANCHAR NIGAM LIMITED<br />

(A GOVERNMENT OF INDIA ENTERPRISE)<br />

5<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

No. 6(1063) EE/BSNL/CD/RTK/ Dated: 03.09.2009<br />

Copy forwarded to the following, they are requested to get it displayed on their notice<br />

board:<br />

1. The Chief Engineer (Civil), BSNL, Haryana Zone, Ambala Cantt.<br />

2. The Superintending Engineer (C), BSNL Civil Circle Rohtak.<br />

3-5 GMTD, Hissar/Rohtak/Rewari<br />

6-8 The Executive Engineer (C), BSNL Civil Division Ambala/Panipat/Faridabad.<br />

9-20 The SDE(C), BSNL Civil Sub Division, Rohtak/Sirsa/Hissar/Rewari<br />

/Karnal/Sonepat/Ambala-1 & 2/Gurgaon-1 and 2/Faridabad/Jind.<br />

21 The JTO (Tech), BSNL Civil Division Rohtak.<br />

22 Garrison Engineer, MES, Ambala Cantt.<br />

23 EE(C), Postal Civil Dvn., Ambala Cantt.<br />

24 EE(C), CPWD Civil Dvn., Subhash Colony, Karnal.<br />

25 Notice Board BSNL Civil Division Rohtak<br />

Sd/-<br />

Executive Engineer (C)<br />

BSNL Civil Division<br />

Rohtak – 124001<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


BHARAT SANCHAR NIGAM LIMITED<br />

(A Govt. of India Enterprise)<br />

NIT No. 20,33,34/EE/BSNL/CD/RTK/2009-10<br />

PRESS NOTICE INVITING TENDER<br />

6<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

The Executive Engineer (Civil), BSNL Civil Division, Rohtak (Haryana) invites on behalf of Bharat<br />

Sanchar Nigam Limited wax sealed item rate <strong>tender</strong>s from approved and eligible contractors registered with<br />

D.O.T./BSNL and enlisted agency, enlisted in CPWD, Haryana State PWD (B&R), D.O.P, MES, Railway for the<br />

following works:<br />

S.<br />

No.<br />

1.<br />

2.<br />

3.<br />

Name of work<br />

Construction of tower foundation for<br />

40 mtr high tower at BTS sites at<br />

Khudana, Mandola, Rasulpur,<br />

Rathiwas, Pota and Chajiawas/<br />

Jhanjriwas in Mahendergarh tehsil<br />

Construction of tower foundation for<br />

40 mtr. high tower at BTS site at<br />

Dharan and Pranpura in Bawal Tehsil<br />

Construction of tower foundation for<br />

40mtr high tower at BTS sites in Tohana<br />

Tehsil (Sirsa) [Kanheri, Samain, Jamalpur<br />

Shekhan] under phase V.2<br />

Estimated<br />

cost<br />

(Rs.)<br />

Earnest money<br />

(Rs.)<br />

18,08,714/- 36174/-<br />

6,02,907/- 12,058/-<br />

9,04,357/- 18,087/-<br />

Last date of issue of <strong>tender</strong> from Division Officer: 14.09.2009 upto 16.00 hrs.<br />

Last date and time of submission of <strong>tender</strong> : 15.09.2009 upto 15.00 hrs.<br />

Date and time of opening of <strong>tender</strong> : 15.09.2009 at 15.30 hrs.<br />

For details visit our Website: http://www.haryana.bsnl.co.in/civil<br />

Fax No. 01262-250669<br />

Mobile No. 94160-14777<br />

Time for<br />

completion<br />

02(Two)<br />

Months<br />

01(one)Mont<br />

h<br />

30(thirty)<br />

days<br />

Executive Engineer (C)<br />

BSNL Civil Division<br />

Rohtak<br />

Cost of<br />

<strong>tender</strong><br />

document<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..<br />

563/-<br />

563/-<br />

563/-


NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

BHARAT SANCHAR NIGAM LIMITED<br />

(A GOVERNMENT OF INDIA ENTERPRISE)<br />

BSNL W-6<br />

NOTICE INVITING TENDER<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

1. Item rate <strong>tender</strong>s are invited on behalf of BHARAT SANCHAR NIGAM LIMITED (A Government of India Enterprise)<br />

from approved and eligible contractors registered with D.O.T./BSNL and enlisted agency enlisted in CPWD, State PWD<br />

(B&R), D.O.P, MES, Railway for the work of “Construction of tower foundation for 40mtr high tower at BTS sites in<br />

Tohana Tehsil(Sirsa) [Kanheri, Samain, Jamal Pur Shekhan] Under Phase V.2”<br />

1.1. The work is estimated to cost Rs. 9,04,357.00 (Rupees nine lacs four thousand three hundred fifty seven<br />

only)<br />

1.2. Tenders will be issued to eligible contractors provided they produce proof of their valid enlistment with the<br />

appropriate authority.<br />

1.3. All the intending <strong>tender</strong>ers other than those contractors enlisted with BSNL/DOT should have successfully<br />

completed similar works during last 7 years ending 31.07.2009. Tenders will be issued to eligible contractors<br />

provided they produce definite proof from the appropriate authority not below the rank of Executive Engineer of<br />

having successfully completed works of magnitude as specified below. It is clarified that the works done for by<br />

Central Govt. /State Govt./ PSU (PSU means an autonomous body which is under the state Govt./ Central Govt.<br />

like development authority, municipal corporations, universities run by the Govt.) shall only be considered for<br />

eligibility.<br />

(i) Three similar completed works costing not less than the amount equal to 40% of the estimated cost<br />

OR<br />

(ii) Two similar completed works costing not less than the amount equal to 50% of the estimated cost<br />

OR<br />

(iii) One similar completed works costing not less than the amount equal to 80% of the estimated cost<br />

Note: Similar works in the above Para means construction of Admn./ Technical buildings & staff quarters in RCC framed<br />

constructions & or load bearing constructions, tower foundation etc.<br />

2. Agreement shall be drawn with the successful Tenderer on prescribed Form No. BSNL-W 7/8 which is available as a<br />

BSNL Publication and on BSNL website www.civil.bsnl.co.in and www.haryana.bsnl.co.in/civil . Tenderer shall quote<br />

his rates as per various terms and conditions of the said form (In case" Tender Documents" are downloaded from<br />

the BSNL Website in which rates/percentage are to be quoted should be properly bound and sealed), which will form part<br />

of the agreement.<br />

3. The time allowed for carrying out the work will be 30(thirty) days from the 10 th day after the date of written order to<br />

commence the work or from the first day which ever is later, in accordance with phasing, if any indicate in the <strong>tender</strong><br />

<strong>documents</strong>.<br />

4. The site for the work shall be made available in parts.<br />

5. The last date of receipt of applications for issue of <strong>tender</strong> forms (in prescribed format/can also be downloaded from<br />

BSNL website www.haryana.bsnl.co.in/civil ) and date of issue of <strong>tender</strong> forms will be as follows:-<br />

i. Last date of receipt of application – 11.09.2009 upto 16.00 hours.<br />

ii. Last date of issue of <strong>tender</strong> forms – 14.09.2009.<br />

TENDER DOCUMENTS/FINANCIAL BID<br />

iii. In case the <strong>tender</strong> document is downloaded from the website, the applicant will submit his credentials required to<br />

establish his eligibility and work experience conditions to the Executive Engineer (C) on or before 11.09.2009.<br />

6. Tender <strong>documents</strong> consisting of plans, specifications, the schedule of quantities of the various classes of work to be done<br />

and set of terms and conditions of the contract to be complied with by the contractor whose <strong>tender</strong> may be accepted &<br />

other necessary <strong>documents</strong> can either be downloaded from the BSNL website www.haryana.bsnl.co.in/civil or be<br />

seen in the office of the Executive Engineer(C), BSNL Civil Division, Rohtak between 11.00 hours & 16.00 hours from<br />

03.09.2009 to 14.09.2009 everyday except on Sundays and Public Holidays. Tender <strong>documents</strong>, excluding standard<br />

form, will be issued from his office, during the hours specified above on payment of following:i.<br />

Rs.500.00 (Rs. Five Hundred only) plus 12.50% Sales Tax in the form of Demand Drafts / Pay Orders of a<br />

Scheduled Bank drawn in favour of Accounts Officer (Cash) O/O Executive Engineer(c), BSNL Civil<br />

Division, Faridabad.<br />

ii. Earnest money of Rs.18,087/- (Rupees eighteen thousand eighty seven only) in form of Demand Drafts /FDR/<br />

Pay Orders of a Scheduled Bank drawn in favour of Accounts Officer(Cash) O/o Executive Engineer(C),<br />

BSNL Civil Division, Faridabad.<br />

iii. The <strong>tender</strong> shall be accompanied by Earnest money along with the cost of <strong>tender</strong>, if not paid earlier as in the<br />

case of downloaded <strong>tender</strong> from website in the form as detailed in sub para (i) & (ii) above.<br />

7. Tenders, which should always be placed in sealed envelope, in the manner detailed at para 9 below, will be received by<br />

the Executive Engineer(C), BSNL Civil Division, Rohtak upto 15.00 Hrs. on 15.09.2009 and will be opened by him or<br />

his authorized representative in his office on the same day at 15.30 hours. The envelope containing the Earnest Money<br />

along with the cost of the <strong>tender</strong> as applicable in case of downloaded <strong>tender</strong> <strong>documents</strong> shall be opened first. The<br />

Tenders of <strong>tender</strong>er, who do not deposit the Earnest Money along with cost of <strong>tender</strong>, shall not be opened.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil….<br />

7


8<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

The description of the work is as follows:- “Construction of tower foundation for 40mtr high tower at BTS sites in<br />

Tohana Tehsil(Sirsa) [Kanheri, Samain, Jamal Pur Shekhan] Under Phase V.2”<br />

8. Submission of <strong>tender</strong>:<br />

8.1. The “Tender” and “Earnest money” shall be placed in separate sealed envelopes marked “Tender” and “Earnest<br />

money” respectively.<br />

8.1.1 In case the <strong>tender</strong> document is down loaded from BSNL website, the “Tender” and “Earnest money plus cost of<br />

<strong>tender</strong> shall be placed in a separate sealed envelopes marked “Tender” and “Earnest money plus cost of <strong>tender</strong>”<br />

respectively.<br />

8.2. The “Tender” sealed envelope and “Earnest money or Earnest money plus cost of <strong>tender</strong>” sealed envelope shall<br />

be placed in another sealed envelope with following data written on it.<br />

i. Name of work<br />

ii. Name of <strong>tender</strong>er<br />

iii. Last date of receipt of <strong>tender</strong><br />

8.3. The <strong>tender</strong> in which rates/percentage are to be quoted should be properly bound and sealed. Loose/spiral bound<br />

submission (in case the <strong>tender</strong> is downloaded from website) shall be rejected out rightly. In case of any<br />

correction/addition/alteration/omission in <strong>tender</strong> document vis-à-vis <strong>tender</strong> document available on website shall be<br />

treated as non-responsive and shall be summarily rejected.<br />

9. Copies of other drawings and <strong>documents</strong>, if any, pertaining to the work will be open for inspection by the <strong>tender</strong>ers at the<br />

office of the above-mentioned officer.<br />

9.1. Tenderers are advised to inspect and examine the site and its surroundings and satisfy themselves before<br />

submitting their <strong>tender</strong>s as to the nature of the ground and sub-soil (so far as is practicable),the form and nature of<br />

the site, the means of access to the site, the accommodation they may require and in the general, shall themselves<br />

obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect<br />

their <strong>tender</strong>. A <strong>tender</strong>er shall be deemed to have full knowledge of the site whether he inspects it or not and no<br />

extra charges consequent on any misunderstanding or otherwise shall be allowed. The <strong>tender</strong>er shall be<br />

responsible for arranging and maintaining at his own cost all materials, tools & plants, water, electricity, access<br />

facilities for workers and on all other services required for executing the work unless otherwise specifically provided<br />

for in the contract <strong>documents</strong>. Submission of <strong>tender</strong> by a <strong>tender</strong>er implies that he has read this notice and all other<br />

contract <strong>documents</strong> and has made himself aware of the scope and specifications of the work to be done and of<br />

conditions and rates at which stores, tools and plats, etc. will be issued to him by the Government and local<br />

conditions and other factors having a bearing on the execution of the work.<br />

10. The competent authority on behalf of Bharat Sanchar Nigam Limited does not bind himself to accept the lowest or any<br />

other <strong>tender</strong>, and reserves to himself the authority to reject any or all of the <strong>tender</strong>s received without the assignment of a<br />

reason. All <strong>tender</strong>s in which any of the prescribed conditions is not fulfilled or any condition including that of conditional<br />

rebate is put forth by the <strong>tender</strong>er, shall be summarily rejected.<br />

11. Canvassing whether directly or indirectly, in connection with <strong>tender</strong>s, is strictly prohibited and the <strong>tender</strong>s, submitted by<br />

the contractors, who resort to canvassing, will be liable to rejection.<br />

12. The competent authority on behalf of BHARAT SANCHAR NIGAM LIMITED reserves with himself the right of accepting<br />

the whole or any part of the <strong>tender</strong> and the <strong>tender</strong>er shall be bound to perform the same at rate quoted.<br />

13. The company or firm or any other person shall not be permitted to <strong>tender</strong> for works in BSNL Civil Zone in which his near<br />

relative(s) (directly recruited or on deputation in BSNL) is/are posted in any capacity either non-executive or executive<br />

employee. Near relative(s) for this purpose is/are defined as:-<br />

i. Member of Hindu Undivided family (HUF)<br />

ii. They are Husband and wife.<br />

iii. The one is related to other in the manner as father, mother, son(s) and son’s wife (daughter-in-law), Daughter(s),<br />

Daughter’s husband (son-in-Law), brother(s), brother’s wife, sister(s), sister’s Husband (brother-in-law).<br />

The contractor shall also intimate the names of persons who are working with him in any capacity or are subsequently<br />

employed by him and who are near relative to any executive employee/gazetted officer in the BSNL or Department of<br />

Telecom or in the Ministry of Communications.<br />

All the intending <strong>tender</strong>ers will have to give a certificate that none of his/her such near relative (s) as defined above<br />

is / are working in the concerned BSNL Civil Zone where he is going to apply for <strong>tender</strong>/work. The format of the certificate<br />

is as under :<br />

“I,_____ _______ _________ _______ _____s/o Shri__ _______ ________ ________ __Resident of ____ ___ ___ ___<br />

___ ___ ___ ___ ___ ___ ___ hereby certify that none of my relative (s) as defined above is/are employed in concerned<br />

BSNL Civil Zone. In case at any stage, it is found that the information given by me is false / incorrect, BSNL shall have the<br />

absolute right to take any action as deemed fit without any prior intimation to me.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

The certificate in case of proprietorship Firm shall be given by the proprietor, for Partnership Firm, Certificate shall be<br />

given by all partners and in case of Limited Company, by all Directors of the Company. However Government of<br />

India/Financial Institutions nominees and independent non-official Part time Directors appointed by Govt. of India or the<br />

Governor of the State are excluded from the preview of submission of this certificate while submitting <strong>tender</strong>s by Limited<br />

Companies.<br />

In case of any breach of these conditions by the company or firm or any other person, the <strong>tender</strong> / work will be cancelled<br />

and earnest money/security deposit will be forfeited at any stage, whenever it is so noticed, the BSNL will not pay any<br />

damages to the company or Firm or the concerned persons but damages arising on account of such cancellation to be<br />

borne by the contractor. The Company or Firm or the person will also be debarred for further participation in the <strong>tender</strong> in<br />

the concerned BSNL Civil Zone. Further, any breach of this condition by the <strong>tender</strong>er would also render him liable to be<br />

removed from the approved list of contractors of this department. If, however, the contractor is registered in any other<br />

Department he shall also be debarred from <strong>tender</strong>ing in BSNL for any breach of this condition.<br />

14. No Engineer of Gazetted rank or other Gazetted Officer employed in Engineering or administrative duties in an<br />

Engineering Department of the Government of India / State Government or PSU’s is allowed to work as a contractor for a<br />

period of two years after his retirement from Govt. service, without previous permission of the Govt. of India or BSNL in<br />

writing. This contract is liable to be cancelled if either the contractor or any of his employee is found any time to be such a<br />

person who had not obtained the permission of the Govt. of India/State Government or PSU’s or BSNL as aforesaid<br />

before submission of the <strong>tender</strong> or engagement in the contractor’s service.<br />

15. The <strong>tender</strong> for the work shall remain open for acceptance for period of 60 (Sixty) days from the date of opening of<br />

<strong>tender</strong>s. If any <strong>tender</strong>er withdraws his <strong>tender</strong> before the said period or issue of letter of acceptance / intent whichever is<br />

earlier, or, makes any modifications in the terms and conditions of the <strong>tender</strong> which are not acceptable to the BSNL, then<br />

the B.S.N.L. shall, without prejudice to any other right or remedy, be at liberty to forfeit 50% of the said earnest money as<br />

aforesaid.<br />

16. In case of works having estimated cost below Rs.15,00,000/-, the successful <strong>tender</strong>er shall be required to execute an<br />

agreement with the Engineer-in-charge in the proforma annexed to the <strong>tender</strong> document, within 15 days of the issue of<br />

letter of acceptance by the BSNL. In the event of failure on the part of successful <strong>tender</strong>er to sign the agreement, the<br />

earnest money will be forfeited and <strong>tender</strong> cancelled. In case of works of estimated cost Rs.15,00,000/- and above, the<br />

successful <strong>tender</strong>er shall, upon issue of letter of acceptance of Tender, shall be required to furnish irrevocable Bank<br />

Guarantee of requisite amount to the Engineer-in-charge in the Performa annexed to the <strong>tender</strong> document, within 15 days<br />

of the issue of letter of acceptance of Tender by the BSNL. In the event of failure on the part of the successful <strong>tender</strong>er to<br />

furnish the Bank Guarantee within 15 days, the earnest money will be forfeited and <strong>tender</strong> cancelled.<br />

17. This Notice Inviting Tender (BSNL W-6) shall form a part of the Contract Document. In accordance with clause 1 of the<br />

contract, the letter of intent shall be issued first in favour of the successful Tenderer/Contractor. After submission of<br />

the performance guarantee, the letter for commencement of work shall be issued. The contract shall be deemed to have<br />

come into effect on issue of communication of acceptance of the <strong>tender</strong>. On such communication of acceptance, the<br />

successful Tenderer/Contractor shall, within 15 days from such date, formally sign the agreement consisting of :-<br />

i. The Notice Inviting Tender, all the <strong>documents</strong> including additional conditions, specifications and drawings, if any,<br />

forming the <strong>tender</strong> as issued at the time of invitation of <strong>tender</strong> and acceptance thereof together with any<br />

correspondence leading thereto.<br />

ii. Standard BSNL W-7/8 as on website www.haryana.bsnl.co.in/civil.<br />

iii. Agreement signed on Non Judicial Stamp paper as per Performa annexed to the <strong>tender</strong> <strong>documents</strong>.<br />

18. Payment to the contractors shall be made through e-payment system like ECS & EFT as detailed below:<br />

18.1. In cities/areas where ECS/EFT facility is provided by Banks, the <strong>tender</strong>er must have Account in such ECS/EFT<br />

facility providing Banks and that Bank A/c No shall be quoted in the <strong>tender</strong> by the <strong>tender</strong>er.<br />

18.2. The cost of ECS/EFT will be borne by BSNL in all cases where the payment to contractor is made in a local Branch<br />

i.e. <strong>tender</strong>er is having bank account in the same place from where the payment is made by BSNL unit.<br />

18.3. In case payment is made to outside branch i.e. <strong>tender</strong>er is having back account not in the same place form where<br />

the payment is made by BSNL unit, the crediting cost will have to be borne by the <strong>tender</strong>er only.<br />

18.4. The payments to contractors will compulsorily be made through ECS/EFT in respect of all contracts where the<br />

value of the contracts more than Rs. 10 lakhs.<br />

19. First running account bill shall be paid only after<br />

(a) Signing of the Agreement / Contract by both the parties; and<br />

(b) Progress chart has been prepared as required under clause 5 and approved by the competent authority.<br />

20. If a contractor after purchasing the <strong>tender</strong> does not quote consecutively on three occasions, the contractor may be<br />

debarred for further purchase of <strong>tender</strong>s for a period of six months.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..<br />

9


10<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

21. General conditions of contract for works in BHARAT SANCHAR NIGAM LIMITED are available on website<br />

www.haryana.bsnl.co.in/civil as well as in the Divisional/ Sub divisional Office.<br />

22. The <strong>tender</strong>er shall furnish a declaration to this effect (In case of downloaded <strong>tender</strong>) that no addition/ deletion/ correction<br />

have been made in the <strong>tender</strong> document submitted and it is identical to the <strong>tender</strong> document appearing on website. Every<br />

page of downloaded <strong>tender</strong> shall be signed by the <strong>tender</strong>er with stamp (seal) of his firm/organization.<br />

Sd/- .<br />

Executive Engineer(C)<br />

BSNL Civil Division<br />

Rohtak (Haryana)<br />

For & on behalf of Bharat Sanchar Nigam Limited<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


TENDER DOCUMENTS/FINANCIAL BID BSNL<br />

BHARAT SANCHAR NIGAM LIMITED<br />

(A GOVERNMENT OF INDIA ENTERPRISE)<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

11<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

BSNL W 7/8<br />

STATE: HARYANA CIRCLE:- BSNL CIVIL ROHTAK<br />

DIVISION:- BSNL CIVIL ROHTAK<br />

ZONE: HARYANA SUB DIVISION: BSNAL CIVIL SIRSA<br />

ITEM RATE TENDER AND CONTRACT FOR WORKS<br />

(A) Tender for the work of : “Construction of tower foundation for 40mtr high tower at BTS sites in Tohana<br />

Tehsil(Sirsa) [Kanheri, Samain, Jamal Pur Shekhan] Under Phase V.2”<br />

(i) To be submitted by 15.00 hours on 15.09.2009 to the Executive Engineer (C), BSNL Civil Division, Rohtak.<br />

(ii) To be opened in presence of <strong>tender</strong>ers who may be present at 15.30 hours on 15.09.2009 in the office of the<br />

Executive Engineer (C), BSNL Civil Division, Rohtak.<br />

Issued to:- ______________________________________________________________________<br />

Signature of officer issuing the <strong>tender</strong> <strong>documents</strong>:- ______________________________________<br />

Designation: - Executive Engineer (C), BSNL Civil Division, Rohtak<br />

Date of Issue:___________________ (Not applicable for <strong>documents</strong> downloaded from website)<br />

T E N D E R<br />

I/ We have read and examined the notice inviting <strong>tender</strong>, schedule A, B, C, D, E & F, Specifications applicable, Drawings &<br />

Designs, General rules and directions, Conditions of contract, clauses of contract, Special conditions, Schedule of Rate &<br />

other <strong>documents</strong> and Rules referred to in the conditions of contract and all other contents in the <strong>tender</strong> document for the work.<br />

I/ We hereby <strong>tender</strong> for the execution of the work specified for the BSNL within the time schedule specified in Schedule ‘F’,<br />

viz., schedule of quantities and in accordance in all respects with the specifications, designs, drawings and instructions in<br />

writing referred to in Rule-1 of General Rules and Directions and in Clause 11 of the Conditions of contract and with such<br />

materials as are provided for, by, and in respect in accordance with, such conditions so far as applicable.<br />

We agree to keep the <strong>tender</strong> open for 60 days from the due date of submission thereof and not to make any modification in its<br />

terms and conditions. If any <strong>tender</strong>er withdraws his <strong>tender</strong> before the said period or issue of letter of acceptance/intent<br />

whichever is earlier ,or, makes any modification in the terms and conditions of the <strong>tender</strong> which are not acceptable to BSNL,<br />

then the BSNL shall, without prejudice to any other right or remedy, be at liberty to forfeit 50% of the said earnest money as<br />

aforesaid.<br />

A sum of Rs.18,087/= (Rupees eighteen thousand eighty seven only) has been deposited in cash (upto Rs. 2500.00) /<br />

Demand Draft/ FDR / Pay Order of a Scheduled Bank as earnest money. If I/We, fail to commence the work specified, I/ We<br />

agree that the said BSNL shall without prejudice to any other right or remedy, be at liberty to forfeit the said earnest money<br />

absolutely otherwise the said earnest money shall be retained by competent authority on behalf of BSNL towards security<br />

deposit to execute all the works referred to in the <strong>tender</strong> <strong>documents</strong> upon the terms and conditions contained or referred to<br />

therein and to carry out such deviations as may be ordered, up to a maximum of the percentage mentioned in Schedule ‘F’<br />

and those in excess of that limit at the rates to be determined in accordance with the provision contained in Clause 12.2 and<br />

12.3 or the <strong>tender</strong> form.<br />

I/We agree that, in case of works of estimated cost exceeding Rs.15,00,000/, to deposit an amount equal to 5% of Tendered<br />

value of the work as performance guarantee in the form of bond of any Scheduled Bank of India in accordance with the<br />

proforma prescribed or in the form of Fixed Deposit Receipt etc., within 15 days of the issue of letter of acceptance of Tender<br />

by the BSNL. I/We am/are aware that in the event of failure on my/our part to furnish the Bank Guarantee within 15 days, the<br />

earnest money will be forfeited and <strong>tender</strong> cancelled<br />

I/We hereby intimate that for receiving payments I/we have an account in __________________ Bank with account No.<br />

_____________________ where the ECS/EFT facility of e-payment is available.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

I/We hereby declare that I/We shall treat the <strong>tender</strong> <strong>documents</strong> drawings and other records connected with the work as<br />

secret/ confidential <strong>documents</strong> and shall not communicate information derived there from to any person other than a<br />

person to whom I/we am/ are authorized to communicate the same or use the information in any manner prejudicial to the<br />

safety of the state.<br />

I/ We agree that should I/We fail to commence the work specified in the above memorandum, an amount equal to the amount<br />

of the earnest money mentioned in the form of invitation of <strong>tender</strong> shall be absolutely forfeited to the BSNL and the same may<br />

at the option of the competent authority on behalf of the BSNL be recovered without prejudice to any other right or remedy<br />

available in law out of the deposit in so far as the same may extend in terms of the said bond and in the event of deficiency<br />

out of any other money due to me/ us under this contract or otherwise.<br />

The information in respect of works in hand is as per proforma enclosed.<br />

Dated : _____________<br />

Witness:-<br />

Address:-<br />

Occupation:-<br />

A C C E P T A N C E<br />

12<br />

Signature of Contractor:- ______________<br />

Postal Address:- ____________________<br />

______________________<br />

______________________<br />

The above <strong>tender</strong> (as modified by your (Contractor) and as provided in the letters mentioned hereunder is accepted by me for<br />

and on behalf of the Bharat Sanchar Nigam Limited for a sum of Rs. __________ (Rupees _____________ __________<br />

_______ __________ ________ ___________ ___________ ___________ ___________ _________ _______).<br />

The letters referred to below shall form part of this contract Agreement:-<br />

(a)<br />

(b)<br />

(c)<br />

Dated: ………………….<br />

For and on behalf of BSNL<br />

Signature. …………………………..<br />

Designation ……………………….<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


TENDER DOCUMENTS/FINANCIAL BID BSNL<br />

PROFORMA OF SCHEDULES<br />

(Operative Schedules to be supplied separately to each of the intending <strong>tender</strong>er)<br />

SCHEDULE ‘A’<br />

Schedule of Quantities (Enclosed)<br />

SCHEDULE ‘B’<br />

Schedule of materials to be issued to the contractor:-<br />

S.<br />

No.<br />

Description of item Quantity Rates in figures and words at which the<br />

material will be charged from the<br />

contractor<br />

13<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

Place of issue<br />

1 2 3 4 5<br />

------------------------------------- NIL ------------------------------------<br />

SCHEDULE ‘C’<br />

Tools and plants to be hired to the contractor<br />

S.No. Description Hire charges per day Place of issue<br />

1 2 3 4<br />

------------------------------------- NIL ------------------------------------<br />

SCHEDULE ‘D’<br />

Extra schedule for specific requirements/ <strong>documents</strong> for the work, if any. ….NIL<br />

SCHEDULE ‘E’<br />

Schedule of component of Materials, Labour etc. for escalation.<br />

CLAUSE 10 C Not Applicable<br />

Component of materials expressed as per cent of total value of work ; “X”<br />

Component of labour expressed as per cent of total value of work ; “Y”<br />

Component of P.O.L. expressed as per cent of total value of work “Z”<br />

SCHEDULE ‘F’<br />

Reference to General Conditions of contract.<br />

Name of Work “Construction of tower foundation for 40mtr high tower at BTS sites in Tohana Tehsil(Sirsa) [Kanheri,<br />

Samain, Jamal Pur Shekhan] Under Phase V.2”<br />

Estimated cost of work:<br />

Rs. 9,04,357/- (Rupees nine lacs four<br />

thousand three hundred fifty seven only)<br />

Earnest Money:<br />

Performance Guarantee (5% of the <strong>tender</strong>ed value in<br />

the form of Bank Guarantee from Scheduled Bank in<br />

respect of works with estimated cost put to <strong>tender</strong><br />

exceeding Rs. 15 lakhs)<br />

Security Deposit:<br />

(10% of the <strong>tender</strong>ed value for works with estimated<br />

cost put to <strong>tender</strong> upto Rs. 15 Lakhs) (5% of the<br />

<strong>tender</strong>ed value in respect of works with estimated cost<br />

put to <strong>tender</strong> exceeding Rs. 15 lakhs)<br />

General Rules & Directions:<br />

Officer inviting <strong>tender</strong>:<br />

Addl. … nil….… Deletion..…nil..…..<br />

Rs.18087/= (Rupees eighteen thousand<br />

eighty seven only)<br />

Rs………………………………..<br />

Rs. …………………………………..<br />

Executive Engineer (C), BSNL Civil Division,<br />

Rohtak.<br />

Corr…nil … Overwriting…nil…..…


NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

Maximum percentage for quantity of items of work to be<br />

executed beyond which rates are to be determined in<br />

accordance with the clause 12.2 & 12.3<br />

50%<br />

Definitions See below<br />

2(v) Engineer-in-charge<br />

Executive Engineer (C), BSNL Civil Division,<br />

Rohtak<br />

2(viii) Accepting Authority<br />

2(x) Percentage on cost of materials and labour to<br />

cover all overheads and profits.<br />

2(xi) Standard schedule of rates<br />

9(ii) Standard BSNL contract Form<br />

Clause 2:<br />

Authority for fixing compensation under clause 2<br />

Clause 2A:<br />

Whether Clause 2A shall be applicable<br />

Clause 5:<br />

Time allowed for execution of work.<br />

Authority to give fair and reasonable extension of time<br />

for completion of work:<br />

Clause 7:<br />

Gross value of work to be done together with net<br />

payment/ adjustment of advances for material collected,<br />

if any, since the last such payment for being eligible to<br />

interim payment.<br />

Clause 11:<br />

Specifications to be followed for execution of work:<br />

Clause 12:<br />

12.1.2(iii)<br />

Schedule of rates for determining rates for additional,<br />

altered or substituted items that cannot be determined<br />

under 12.1.2(i) and (ii)<br />

12.1.2(iii)<br />

Plus/ minus the % over the rate entered in the schedule<br />

of rates.<br />

12.2<br />

Limit for value of any item of any individual trade<br />

beyond which sub-clauses (i) to (v) shall not apply and<br />

clauses 12.2 & 12.3 shall apply.<br />

Clause 16:<br />

Competent authority for deciding reduced rates:<br />

Clause 25:<br />

Competent Authority for conciliation:<br />

Clause 36:<br />

(a) Minimum qualifications and experience<br />

required for Principal Technical Representative<br />

for civil works with estimated cost put to<br />

<strong>tender</strong>.<br />

(i) Above Rs. 5 Lakhs but less than Rs. 10 Lakhs.<br />

Addl. …nil…. Deletion..…nil..…..<br />

Superintending Engineer (Civil), BSNL Civil<br />

Circle Rohtak<br />

10 %<br />

DSR 2007, Published by CPWD with upto date<br />

correction slips<br />

BSNL W-8 form as modified and corrected<br />

upto date<br />

Superintending Engineer (Civil) , BSNL Civil<br />

Circle Rohtak<br />

NO<br />

30(thirty) days<br />

Superintending Engineer (C), BSNL Civil<br />

Circle, Rohtak<br />

Rs. 9,00,000/-<br />

1. Generic requirement of TEC, DOT,<br />

Government of India, for 40 metre tower<br />

(GR/TWR-04/01/Dec.2000 with amendment<br />

no. 2 dated 29.06.2005)<br />

2.CPWD specifications 1996 with up-to-date<br />

correction slips.<br />

DSR 2007 published by CPWD with upto date<br />

correction slips as on the date of opening of<br />

<strong>tender</strong>s/ specifications described in item<br />

schedule.<br />

________________________________<br />

50%<br />

SE(Civil), BSNL Civil Circle, Rohtak.<br />

Superintending Engineer (Civil), BSNL Civil<br />

Circle, Ambala Cantt.<br />

Recognised Diploma Holder in Civil<br />

Engineering.<br />

Corr…nil … Overwriting…nil…..…<br />

14


(i) Rs. 10 Lakhs and above but less than Rs.<br />

60 Lakhs.<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

Graduate Civil Engineer or Retired AE (Civil)<br />

possessing at least Recognised Diploma in<br />

Civil Engineering.<br />

(iii) Rs. 60 Lakhs and above. Principal Technical Representative supported<br />

by requisite organization i.e. one technical<br />

assistant and one foremen. The principal<br />

Technical representative shall be at least a<br />

graduate civil engineer with five years of<br />

minimum experience of works or Retired<br />

Executive Engineer (Civil) possessing at least<br />

recognized diploma in Civil Engineering.<br />

(j) Recovery to be effected from the contractor in<br />

event of not fulfilling provision of clause 36(1)<br />

Clause 42:<br />

(i) Schedules/ statement for determining<br />

theoretical quantity of cement & bitumen<br />

on the basis of Delhi Schedule of Rates<br />

2002 printed by C.P.W.D.<br />

(ii) Variations permissible on theoretical<br />

quantities<br />

(a) Cement for works with estimated cost<br />

put to <strong>tender</strong> not more than Rs. 5 Lakhs<br />

(b) Cement for works with estimated cost<br />

put to <strong>tender</strong> more than Rs. 5 Lakhs<br />

(c) Steel reinforcement and structural steel<br />

sections for each diameter, section and<br />

category.<br />

Rs. 4000/- P.M. for Graduate Engineer.<br />

Rs. 2000/- P.M. for Diploma Holder.<br />

3% minus<br />

2% minus<br />

2% minus<br />

Star Prices to be considered for escalation - Not Applicable<br />

S. No. Material Star Price<br />

(Rates in Figures and Words)<br />

1. For Cement (MM 43 grade) Rs. ______ per MT<br />

2(a) For Mild Steel NIL<br />

2(b) For Reinforcement Steel conforming to<br />

BIS 1786 (Fe 415 Grade)<br />

NIL<br />

2(c) For Reinforcement Steel TMT bars conforming to relevant<br />

ISI Specifications (Main producers approved by the<br />

Ministry of Steel)<br />

Rs. ________per MT<br />

Note: Recovery rates for quantities beyond permissible variations shall be same as the star prices under for “Lesser<br />

consumption below permissible variation”.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..<br />

15


TENDER DOCUMENTS/FINANCIAL BID BID BSNL BSNL<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

PROFORMA FOR AGREEMENT<br />

(ON NON-JUDICIAL STAMP PAPER OF APPROPRIATE VALUE)<br />

CONTRACT AGREEMENT FOR THE WORK OF ……… ………. …………. ……..……………DATED … … … … Between<br />

M/s………………………………….( refer note) in the town of … …… … … hereinafter called the contractor (which term shall,<br />

unless excluded by or repugnant to the subject or context, include its successors and permitted assigns) of the one part and<br />

the Bharat Sanchar Nigam Limited hereinafter called the BSNL (which term shall unless excluded by or repugnant to the<br />

subject or context include its successes and assigns) of the other part.<br />

WHEREAS<br />

A. The BSNL is desirous that the construction of ……………………………….at ……………….should be executed<br />

as mentioned, enumerated or referred to in the <strong>tender</strong> including Notice Inviting Tender, General Conditions of<br />

the Contract, Special Conditions of the Contract, Specifications, Drawings, Plans, Time Schedule of completion<br />

of jobs, Schedule of Quantities and Rates, Agreed Variations, other <strong>documents</strong>, as called for Tender.<br />

B. The contractor has inspected the site and surroundings of the work specified in the <strong>tender</strong> <strong>documents</strong> and has<br />

satisfied himself by careful examination before submitting his <strong>tender</strong> as to the nature of the surface, strata, soil,<br />

sub-soil and grounds, the form and nature of the site and local conditions, the quantities, nature and magnitude<br />

of the work, the availability of labour and materials necessary for the execution of work, the means of access to<br />

site, the supply of power and water thereto and the accommodation he may require and has made local and<br />

independent enquiries and obtained complete information as to the matters and things referred to or implied in<br />

the <strong>tender</strong> <strong>documents</strong> or having any connection therewith, and has considered the nature and extent of all the<br />

probable and possible situations, delays, hindrances or interferences to or with the execution and completion of<br />

the work to be carried out under the contract, and has examined and considered all other matters, conditions<br />

and things and probable and possible contingencies and generally all matters incidental thereto and ancillary<br />

thereof affecting the execution and completion of the work and which might have influenced him in making his<br />

<strong>tender</strong>.<br />

C. The <strong>tender</strong> <strong>documents</strong> including the Notice Inviting Tender, General conditions of contract, Special Conditions<br />

of Contract, Schedule of Quantities and rates, General obligations, Specifications, Drawings, Plan, Time<br />

Schedule for completion of work, Letter of Acceptance of <strong>tender</strong> and any statement of agreed variations with its<br />

enclosures, copies of which are hereto annexed, form part of this contract though separately set out herein and<br />

are included in the expression contract wherever herein used.<br />

AND WHEREAS<br />

The BSNL accepted the <strong>tender</strong> of M/s………………….(refer note at page………………) (Contractor) for the construction<br />

of …………………………….at……………..and conveyed vide letter No…………………… dated……………….. at the<br />

rates stated in the schedule of quantities for the work and accepted by the BSNL (hereinafter called the Schedule of<br />

Rates) upon the terms and subject to the conditions of the contract.<br />

NOW THIS AGREEMENT WITNESSTH & IT IS HEREBY AGREED AND DECLARED AS FOLLOWS.<br />

1. In consideration of the payment to be made to the contract for the work to be executed by him, the contractor hereby<br />

convenient with the BSNL that the contractor shall and will duly provide, execute, complete and maintain the said<br />

work and shall do and perform all other acts and things in the contract mentioned or described or which are to be<br />

implied and there-from or may be reasonably necessary for the completion of the said works and at the said times<br />

and in the manner and subject to the terms and conditions or stipulations mentioned in the contract, AND.<br />

2. In consideration of the due provisions execution, completion and maintenance of the said work, the BSNL does<br />

hereby agree with the contractor that the BSNL will pay to contractor the respective amounts for the work actually<br />

done by him and approved by the BSNL at the Schedule of Rates and such other sum payable to the contractor<br />

under provision of the contract, such payment to be made at such time in such manner as prescribed for in the<br />

contract.<br />

It is specially and distinctly understood and agreed between the BSNL and the contractor that the contractor shall<br />

have no right, title or interest in the site made available by the BSNL for execution of the works or in the building,<br />

structures or works executed on the said site by the contractor or in the goods, articles, materials, etc. brought on the<br />

said site (unless the same specially belongs to the contractor) and the contractor shall not have or deemed to have<br />

any lien whatsoever charge for unpaid bills will not be entitled to assume or retain possession or control of the site or<br />

structures and the BSNL shall have an absolute and unfettered right to take full possession of site and to remove the<br />

contractor, their servants, agents and materials belonging to the contractor and lying on the site.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..<br />

16


17<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

In Witness whereof the parties hereto have here-into set their respective hands and seals in the day and the year<br />

first above written.<br />

Signed and delivered by<br />

_______________________<br />

For and on behalf of BSNL<br />

Date:<br />

Place<br />

In presence of<br />

1. __________________________<br />

2.___________________________<br />

Signed and delivered by<br />

_______________________<br />

For and on behalf of the agency<br />

Date:<br />

Place:<br />

In presence of<br />

1. __________________________<br />

2.___________________________<br />

For Proprietory Concern<br />

Shri……………………s/o…………………………r/o……………………..carrying on business under the name and style<br />

of………………at………………. (hereinafter called the said Contractor which expression shall unless the context requires<br />

otherwise include his heirs, executors, administrators and legal representatives).<br />

For Partnership Concern<br />

M/s ………………………………….a partnership firm having its registered office at ………………………..(hereinafter<br />

called the said Contractor which expression shall unless the context requires otherwise include his heirs, executors,<br />

administrators and legal representatives). The partners of the firms are:<br />

i) Shri ………………………………….s/o………………………… , And<br />

ii) Shri ……………………………..s/o………………………..etc..<br />

For Companies<br />

M/s …………………………………a company duly incorporated under the Indian Companies Act, 1956 and having its<br />

registered office at …………………………..in the state of ………………………….(hereinafter called the said Contractor which<br />

expression shall unless the context requires otherwise include its successors and assign).<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


SCHEDULE A- [SCHEDULE OF QUANTITIES]<br />

18<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

Name of work:- Construction of tower foundation for 40mtr high tower at BTS sites in Tohana<br />

Tehsil(Sirsa) [Kanheri, Samain, Jamal Pur Shekhan] Under Phase V.2<br />

----------- ----------------------------------------- ---------- ----- ---------- ---- ---------- ---------------------------------------------------<br />

SL NO DESCRIPTION OF ITEMS QUANTITY RATE UNIT AMOUNT<br />

----------- ----------------------------------------- ---------- ----- ---------- ---- ---------- ---------------------------------------------------<br />

** SUB HEAD:**: EARTH WORK<br />

1. Earth work in excavation by mechanical<br />

means ( Hydraulic excavator ) / manual<br />

means over areas ( exceeding 30 cm in<br />

depth, 1.5 m in width as well as 10 sqm<br />

on plan ) including disposal of<br />

excavated earth, lead up to 50 m and<br />

lift up to 1.5 m, disposed earth to be<br />

levelled and neatly dressed :<br />

(a) All kinds of soil. 531.00 Cum One<br />

Cubic<br />

Metre<br />

2. Filling available excavated earth 531.00 Cum One<br />

(excluding rock) in trenches, plinth, Cubic<br />

sides of foundations etc in layers not Metre<br />

exceeding 20 cm in depth, consolidating<br />

each deposited layer by ramming and<br />

watering, lead up to 50 m and lift<br />

up to 1.5 m.<br />

3. Extra for every additional lift of 1.5 m<br />

or part thereof in :<br />

(a) All kinds of soil. 351.00 Cum One<br />

Cubic<br />

Metre<br />

** SUB HEAD:**: CONCRETE WORK<br />

1. Providing and laying in position cement<br />

concrete of specified grade excluding<br />

the cost of centering and shuttering :<br />

All work upto plinth level :<br />

(a) 1 : 5 : 10 (1 Cement : 5 coarse sand : 15.00 Cum One<br />

10 graded stone aggregate 40 mm Cubic<br />

nominal size). Metre<br />

** SUB HEAD:**: REINFORCED CEMENT CONCRETE<br />

1. Providing and laying in position<br />

specified grade of reinforced cement<br />

concrete excluding the cost of<br />

centering, shuttering finishing and<br />

reinforcement :<br />

- All work upto plinth level :<br />

(a) 1 : 1.5 : 3 ( 1 cement : 1.5 coarse 72.00 Cum One<br />

sand : 3 graded stone aggregate 20 mm Cubic<br />

nominal size). Metre<br />

2. Centering and shuttering including<br />

strutting, propping etc and removal of<br />

form for :<br />

(a) Foundations, footings, bases of 36.00 Sqm One<br />

columns, etc for mass concrete. Square<br />

Metre<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


19<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

----------- ----------------------------------------- ---------- ----- ---------- ---- ---------- ---------------------------------------------------<br />

SL NO DESCRIPTION OF ITEMS QUANTITY RATE UNIT AMOUNT<br />

----------- ----------------------------------------- ---------- ----- ---------- ---- ---------- ---------------------------------------------------<br />

(b) Lintels, beams, plinth beams, girders, 15.00 Sqm One<br />

bressumers and cantilevers. Square<br />

Metre<br />

(c) Columns, Pillars, Piers, Abutments, 120.00 Sqm One<br />

Posts and Struts. Square<br />

Metre<br />

3. Reinforcement for R.C.C. work<br />

including straightening, cutting,<br />

bending, placing in position and<br />

binding all complete :<br />

(a) Thermo-Mechanically Treated bars. 11700.00 Kg One<br />

Kilogram<br />

** SUB_HEAD:**: STEEL WORK<br />

1. Cartage of all anchor bolts, bed plates, 3.00 Job One Job<br />

templets etc. for stems of tower<br />

foundation from BSNL store, to site of<br />

work including loading,unloading,<br />

carriage etc.complete for four legged<br />

foundation and as per the direction of<br />

Engineer-in-charge. (Anchor bolts, bed<br />

plates and templets to be supplied by<br />

the department free of cost).<br />

2. Fixing bed plates, templets and all 3.00 Job One Job<br />

anchor blots etc. for stems of tower<br />

foundation including extremely accurate<br />

positioning, levelling etc. complete as<br />

per the direction of Engineer-in-charge.<br />

(Bed plates, templets and anchor bolts<br />

etc. to be supplied by the department<br />

free of cost. Rate includes fixing all<br />

bed plates, templets and anchor bolts<br />

for four legged tower etc. complete).<br />

** SUB HEAD:**: FINISHING<br />

1. 6 mm cement plaster of mix :<br />

(a) 1 : 3 (1 Cement : 3 fine sand). 48.00 Sqm One<br />

Square<br />

Metre<br />

2. Finishing walls with water proofing<br />

cement paint of required shade :<br />

(a) New work (two or more coats applied 48.00 Sqm One<br />

@ 3.84 Kg / 10 sqm). Square<br />

Metre<br />

Sd/-<br />

Executive Engineer(C)<br />

BSNL Civil Division<br />

Rohtak (Haryana)<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

FORM OF PERFORMANCE SECURITY<br />

BANK GUARANTEE BOND<br />

1. In consideration of the BHARAT SANCHAR NIGAM LIMITED (hereinafter called “the BSNL”) having agreed under the<br />

terms and conditions of agreement No.______________ Dated__________made between _______________ and<br />

__________________________ (hereinafter called “the said contractor(s)”) for the _______________________work<br />

(hereinafter called “the said agreement”) for compliance of his obligation in accordance with the terms and conditions in<br />

the said agreement.<br />

We _____________________________________ (indicate the name of the Bank) (hereinafter referred to as “as Bank)<br />

hereby undertake to pay to the BSNL and amount not exceeding Rs.___________(Rupees ___________________only)<br />

on demand by the BSNL.<br />

2. We________________________________________(Indicate the name of the Bank) do hereby undertake to pay the<br />

amount due and payable under this Guarantee without any demure, merely on a demand from the BSNL stating that the<br />

amount claimed is required to meet the recoveries due or likely to be due from the said contractor(s). Any such demand<br />

made on the Bank shall be conclusive as regards the amount due and payable by the bank under this Guarantee.<br />

However, our liability under this guarantee shall be restricted to an amount not exceeding<br />

Rs._________________(Rupees___________________only).<br />

3. We undertake to pay to the BSNL any money so demanded notwithstanding any dispute or disputes raised by the<br />

contractor (s) in any suit or proceeding pending before any court or Tribunal relating thereto our liability under this present<br />

being absolute and unequivocal.<br />

The payment made by us under this bond shall be valid discharge of our liability for payment to there-under and the<br />

contractor(s) shall have no claim against us making such payment.<br />

4. We ____________________________(Indicate the name of Bank) further agree that the guarantee herein contained shall<br />

remain in full force and effect during the period that would be taken for the performance of the said agreement and that it<br />

shall continue to be enforceable till all the dues of the BSNL under or by virtue of the said agreement have been fully paid<br />

and it is claims satisfied or discharged or till Engineer-in-charge on behalf of the BSNL certifies that the terms and<br />

conditions of the said Agreement have been fully and properly carried out be the said contractor(s) accordingly discharges<br />

this guarantee.<br />

5. We ___________________________(indicate the name of Bank) further agree with the BSNL that the BSNL shall have<br />

the fullest liberty without our consent and without affecting any manner our obligations hereunder to vary any of the terms<br />

and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to<br />

postpone for any time to time any of the powers exercisable by the BSNL against the said contractor(s) and to forebear or<br />

enforce any of the terms and conditions relating to the said agreement shall not be relieved from our liability by reasons of<br />

any such variation or extension being granted to the said contractor(s) or for any forbearance act of omission on that part<br />

of the BSNL or any indulgence by the BSNL to the said contractor(s) or by any such matter or thing whatsoever which<br />

under the law relating to sureties would, but for this provision, have effected or so relieving us.<br />

6. The guarantee will not be discharged due to the change in the constitution of the Bank or the contractor(s).<br />

7. We ________________________________________(indicate the name of Bank) lastly undertake not to revoke this<br />

guarantee except with the previous consent of the BSNL in writing.<br />

8. This guarantee shall be valid upto_______________unless extended on demand by BSNL. Notwithstanding any thing<br />

mentioned above our liability against this Guarantee is restricted to Rs.___________ (Rs. ___ _____ ____ _______<br />

_______ only) and unless a claim in writing is lodged with us within six months of the date of expiry or the extended date<br />

of expiry of this guarantee, all our liabilities under the Guarantee shall stand discharged.<br />

20<br />

Dated the________________day of__________<br />

for _______________ ___________________<br />

(Indicate the name of Bank)<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


AFFIDAVIT<br />

21<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

ANNEXURE –(i)<br />

I/We have submitted a bank guarantee for the work______________________________ ___ ___ ___ ___ ___ ___ ___ ___<br />

___ ___ _____ (Name of Work), Agreement No. ________________ Dated: ___ ___ ___ ___ ___ ___ ___ __ from<br />

_________________________________________ (Name of the Division) with a view to seek exemption from payment of<br />

performance guarantee in cash. This Bank guarantee expires on ________________________________<br />

I/ We undertake to keep the validity of the bank guarantee intact by getting it extended from time to time at my/our own<br />

initiative upto a period of _______________________________ months after the recorded date of completion of the work or<br />

as directed by the Engineer in charge.<br />

I/We also indemnify the Bharat Sanchar Nigam Limited against any losses arising out of non-encashment of the bank<br />

guarantee if any.<br />

Note: The affidavit is to be given by the Executants before a first class Magistrate.<br />

(Deponent)<br />

Signature of Contractor<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

IMPORTANT INSTRUCTIONS TO ALL TENDERERS<br />

All <strong>tender</strong>er should read the following important instructions carefully before actually quoting rates :-<br />

1. The <strong>tender</strong>ers should read carefully & understand all the conditions for the Contract, schedule of quantity etc.<br />

attached with the <strong>tender</strong> <strong>documents</strong> before actually quoting for the work.<br />

2. The printout of <strong>tender</strong> document should be taken on suitable paper and the printer settings etc are such that<br />

document is printed as appearing in the web and there is no change in formatting, number of pages etc.<br />

3. The <strong>tender</strong>er should ensure that no page in the down loaded <strong>tender</strong> document is missing.<br />

4. The <strong>tender</strong>er should ensure that all pages in the down loaded <strong>tender</strong> document are legible, clear & are printed on a<br />

good quality paper.<br />

5. The <strong>tender</strong>er should ensure that every page of the downloaded <strong>tender</strong> document is signed by <strong>tender</strong>er with stamp<br />

(seal).<br />

6. The <strong>tender</strong>er should ensure that the down loaded <strong>tender</strong> document is properly bound and sealed before submitting<br />

the same.<br />

7. The loose / spiral bound <strong>tender</strong>s not properly sealed shall be liable for rejection.<br />

8. The <strong>tender</strong> document (in full) downloaded along with the various <strong>documents</strong> required to be submitted as per the<br />

<strong>tender</strong> conditions in a sealed cover duly super scribing with the name of the work, <strong>tender</strong> notice no., and date, and<br />

the same should be dropped in the <strong>tender</strong> box kept in the office of the Executive Engineer (Civil) BSNL Civil<br />

Division, Rohtak before the date and time stipulated in the <strong>tender</strong> document.<br />

9. In case of any doubt in the down loaded <strong>tender</strong>, the same should be got clarified from the O/o Executive Engineer<br />

Civil, BSNL Civil Division, Rohtak before submitting the <strong>tender</strong>.<br />

10. The <strong>tender</strong>ers are free to download <strong>tender</strong> document at their own risk and cost, for the purpose of perusal as well as<br />

for using the same as <strong>tender</strong> document for submitting the offer. Master copy of the <strong>tender</strong> <strong>documents</strong> is available in<br />

the office of Executive Engineer (Civil), BSNL Civil Division, Rohtak. After award of work agreement will be<br />

prepared based on the master copy of the <strong>tender</strong> document available in the above mentioned office. In case any<br />

discrepancy between the <strong>tender</strong> <strong>documents</strong> downloaded from the internet and the master copy, later shall prevail<br />

and will be binding on the <strong>tender</strong>er/s. No claim on this account will be entertained.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..<br />

22


23<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

Undertaking to be given by the <strong>tender</strong>er if the <strong>tender</strong> <strong>documents</strong> are<br />

downloaded from the website:<br />

I/We hereby declare:-<br />

1. That no addition/ deletion/ corrections have been made in the <strong>tender</strong> document submitted and it is identical to the<br />

<strong>tender</strong> document appearing on website.<br />

2. That in case of any stage later, it is found there is difference in our downloaded <strong>tender</strong> <strong>documents</strong> from the original,<br />

BSNL shall have the absolute right to take any action as deemed fit without any prior intimation to me / us.<br />

3. That In case at any stage later, it is found there is difference in our downloaded <strong>tender</strong> <strong>documents</strong> from the original,<br />

the <strong>tender</strong> / work will be cancelled and Earnest Money/ Security Deposit will be forfeited at any stage whenever it is<br />

so noticed. The department will not pay any damages to me / us on this account.<br />

4. That In case at any stage later, it is found there is difference in our downloaded <strong>tender</strong> <strong>documents</strong> from the original, I<br />

/ We may also be debarred for further participation in the <strong>tender</strong> in the concerned BSNL Civil Zone & would also<br />

render me / us liable to be removed from the approved list of contractors of the Department.<br />

Date: …………..<br />

Sign of the Contractor/s<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil….


GENERAL<br />

ADDITIONAL CONDITIONS & SPECIFICATIONS<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

The quoted rates for various items in the <strong>tender</strong> shall be inclusive of all the additional conditions and particular<br />

specifications and for adherence to all these conditions and specifications, no extra payment shall be made to the contractor.<br />

Any infringement and/or breach of these specification and condition(s) etc. shall render the contractor liable to action(s) under<br />

various clauses of the contract and such action stipulated in conditions therein.<br />

[A] ADDITIONAL CONDITIONS<br />

1. The Contractor shall maintain safe custody of materials brought to the site. The Contractor shall also employ necessary<br />

watch and ward establishment for the work and other purposes as required at his own cost.<br />

2. The procurement of Cement and Reinforcement Steel, and, their issue and consumption shall be governed as per<br />

conditions laid down hereunder.<br />

2.1 Cement<br />

2.1.1. The contractor shall procure 43 grade (Conforming to IS: 8112) Ordinary Portland Cement, as required in the work,<br />

from reputed manufactures of cement, having a production-capacity of one million tones per annum or more, such as<br />

A.C.C. L&T, Vikram, Shri Cement, J K Cement and Cement Corporation of India etc., and holding license to use ISI<br />

certification mark for their product whose name shall be got approved from Engineer-in-Charge. Supply of cement shall<br />

be taken in 50 kg bags bearing manufacture’s name and ISI marking.<br />

2.1.2. The Cement shall be brought at site in quantities as decided by the Engineer-in-Charge.<br />

2.1.3. The contractor will have to make proper arrangements to the satisfaction of Engineer-in-charge for storage of cement at<br />

site of work for which no extra payment shall be made. The contractor shall facilitate the inspection of the cement store<br />

by the Engineer-in-Charge at any time.<br />

2.1.4. The contractor shall supply free of charge the cement required for testing. The cost of tests shall be borne by the<br />

contractor/ Department in the manner indicated below:<br />

(1) By the contractor, if the results show that the cement does not conform to relevant BIS codes.<br />

(2) By the Department, if the results show that the cement conforms to relevant BIS codes.<br />

2.2 Steel<br />

2.2.1. The contractor shall procure steel reinforcement bars conforming to relevant BIS codes from main producers as<br />

approved by the Ministry of Steel. The contractor can also use steel reinforcement bars manufactured from secondary<br />

producers and re-rollers having BIS License to produce CTD bars as specified in schedule-F subject to following<br />

stipulations.<br />

(1) If it is provided in the agreement that steel is to be procured from primary producers and procurement of steel from<br />

secondary producers is allowed then a deduction based on the difference in market rate of steel from primary<br />

producers and secondary producers shall be made in the running / final bills.<br />

(2) However, if the stipulation is for procurement of steel from secondary producers then if the contractor uses steel from<br />

primary producers the same shall be allowed but nothing extra shall be payable on this account.<br />

The procurement of TMT Bars conforming to relevant BIS codes shall be made from main producers as approved by<br />

the Ministry of steel or from secondary producers having BIS license to produce TMT bars as specified in Schedule-F subject<br />

to following stipulations:-<br />

(1) If it is provided in the agreement that steel is to be procured from primary producers and procurement of steel from<br />

secondary producers is allowed then a deduction based on the difference in market rate of steel from primary<br />

producers and secondary producers shall be made in the running / final bills.<br />

(2) However, if the stipulation is for procurement of steel from secondary producers then if the contractor uses steel from<br />

primary producers the same shall be allowed but nothing extra shall be payable on this account.<br />

The contractor shall have to obtain and furnish test certificates to the Engineer-in-Charge in respect of all supplies of<br />

steel brought by him to the site of work. Samples shall also be got tested by the Engineer-in-charge as per provisions in this<br />

regard in the relevant BIS codes. In case the test results indicate that the steel arranged by the contractor does not conform to<br />

BIS codes, the same shall stand rejected and shall be removed from the site of work within a week’s time from written order<br />

from the Engineer-in-charge to do so. Deduction item made on account of use of steel from secondary producers instead of<br />

primary producers shall not be treated as sub standard work.<br />

2.2.2. The steel reinforcement shall be brought to the site in quantity of lots as approved by the Engineer-In-Charge.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..<br />

24


NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

2.2.3. The steel reinforcements shall be stored by the contractor at site of work in such a way as to prevent distortion and<br />

corrosion and nothing extra shall be paid on this account. Bars of different sizes (diameters) and lengths shall be stored<br />

separately to facilitate easy counting and checking.<br />

2.2.4. The contractor shall supply free of charge the steel bars required for testing. The cost of tests shall be borne by the<br />

contractor/ Department in the manner indicated below:<br />

(1) By the contractor, if the results show that the steel does not conform to relevant BIS codes.<br />

(2) By the Department, if the results show that the steel conforms to relevant BIS codes.<br />

2.2.5. Coefficient of weight i.e. the weight per unit length of the steel procured by the contractor shall be ascertained at site<br />

before using it and certified by the Engineer-In-Charge. In case weight per unit length is beyond the rolling margin as<br />

laid down in the BIS: 1786, the steel will be rejected and shall be removed from the site of work within a weeks’ time<br />

from written order from the Engineer-in-Charge to do so. In case weight per unit length is more than the standard<br />

coefficient of weight for the diameter, but is within the rolling margin, then the payment shall be made as per the<br />

standard weight per unit length, and, where the weight per unit length is lesser than the standard coefficient of weight<br />

for the diameter, but is within the rolling margin, the payment shall be restricted with respect to the actual weight per<br />

unit length of the diameter.<br />

2.3 The standard sectional weights referred to in standard table under para 5.3.3., page 75 of the revised CPWD<br />

Specifications 2002 for Cement Mortar, Cement Concrete and RCC works, are to be considered for conversion of<br />

length of various sizes of Steel Reinforcement bars into weight and are reproduced below for ready reference.<br />

SIZE (mm) WEIGHT (Kg/M) SIZE (mm) WEIGHT (Kg/M)<br />

6 0.222 20 2.470<br />

8 0.395 22 2.980<br />

10 0.617 25 3.850<br />

12 0.888 28 4.830<br />

16 1.580 32 6.310<br />

18 2.000 36 7.990<br />

2.4 Steel and Cement brought to site and remaining unused shall not be removed from site without the written permission of<br />

the Engineer-In-Charge.<br />

3. No payment shall be made to the contractor for any damage caused during the execution of work because of cause(s)<br />

not covered under Clause 43 of the Contract. The damage to work will be made good by the contractor at his own cost,<br />

and no claim on this account shall be entertained.<br />

4. Some restrictions may be imposed by the security staff etc. on the working and/ or movement of labour, materials etc.<br />

and the contractor shall be bound to follow all such restrictions/ instructions and nothing extra shall be payable on this<br />

account.<br />

5. The contractor shall comply with proper and legal orders and directions of the local or public authority or municipality<br />

and abide by their rules and regulations and pay all fees and charges which he may be liable and nothing extra shall be<br />

payable on this account. The work shall be carried out without infringing on any of the local Municipal Bye-Laws.<br />

6. The contractors shall given a performance test of the entire installations as per standard specifications before the work<br />

is finally accepted and nothing extra what so ever shall be payable to the contractor for the tests.<br />

7. The water supply sanitary installation and drainage work shall be carried out in a manner complying in all respects with<br />

the requirement of relevant by laws of the local municipal authority of the place at no extra cost of the department.<br />

8. The rate for every item of work to be done under this contract shall be for all heights, depths, lengths and widths of the<br />

structure (except where specially mentioned in the item) and nothing extra will be paid on this account.<br />

9. The contractor shall take all precautions to avoid all accidents by exhibiting necessary caution boards such as day and<br />

night boards, speed limit boards and flags, red lights and providing barriers etc. He shall be responsible for all damages<br />

and accidents caused due to negligence on his part. No hindrance shall be caused to traffic during the execution of<br />

work. Nothing extra shall be paid on this account.<br />

10. The contractor will work in close liaison, during the works, with other contractors of water supply, sanitary, drainage<br />

arrangements, electrical installation and any other works and adjust his work plan accordingly.<br />

11. Other Taxes and Royalties<br />

11.1 Income Tax and surcharges over Income Tax etc. at the rates fixed by the Ministry of finance, Government of India,<br />

shall be deducted from all the running and final bills of the contractor. Should there be any increase in rate of Income<br />

Tax and surcharge during execution of the contract, the same shall be payable by the contractor.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..<br />

25


26<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

11.2 Works Contract Sales Tax as prevalent as per statutory orders of State/Central Government and shall be charged on<br />

gross value of all the bills and shall be recovered from each bill of the contractor as ‘works contract sales tax’. Should<br />

there be any increase in rate of Works Contract Sales Tax during execution of the contract, the same shall also be<br />

payable by the contractor.<br />

11.3 Royalty shall have to be paid by the contractor on all materials such as stone, bricks, boulders, metal, shingle, bajri,<br />

stone aggregate, coarse sand and fine sand etc. or any other materials used for the execution of the work direct to the<br />

Revenue Authority of the District/State Govt. concerned. It will be the sole responsibility o the contractor to ensure that<br />

there is “No Demand” from the District/State Govt. authority concerned in this regard.<br />

11.4 The contractor shall have to bear the cost of non-judicial stamp paper of appropriate value for preparation of contract<br />

agreement of the work.<br />

12. Secured Advance:<br />

12.1 Secured advance on bricks, stone, stone aggregate brought at site for use in the work shall be paid only after receipt of<br />

satisfactory test results from the laboratory and provisions under rules.<br />

12.2 Secured advance on steel doors, steel windows, etc. shall be paid only after the Engineer-in-Charge has personally<br />

verified that the materials brought at site of work, for use in work, conforms to the sample approved by him.<br />

12.3 Secured advance whenever admissible on water supply, sanitary installation materials and fittings shall be allowed only<br />

after the Engineer-in-Charge has verified that materials brought at site have been checked by him personally and are in<br />

conformity with the samples approved by him.<br />

12.4 Secured advance for terrazzo tiles shall be paid only after satisfactory results are received from the laboratory.<br />

*************<br />

[B] ADDITIONAL SPECIFICATIONS<br />

1. GENERAL<br />

1.1. The Work shall, in general, conform to the CPWD Specifications. The CPWD specifications shall mean CPWD<br />

Specifications – 1996 Vol. 1 to VI with up-to-date correction slips and Revised CPWD Specifications 2002 for Cement<br />

Mortar, Cement Concrete and RCC works which supersede Chapter 3,4 & 5 of CPWD specifications 1996 Vol. II.<br />

1.1.1. Should there be any difference between the specifications mentioned above and the specifications given in the<br />

schedule of quantities, the later shall prevail.<br />

1.1.2. If the specifications for any item are not available in the CPWD Specifications cited above, relevant BIS Specifications<br />

should be followed.<br />

1.1.3. In case BIS Specifications are also not available, the decision of Engineer-in-Charge given in writing based on<br />

acceptable sound engineering practice and local usage shall be final and binding on the contractor.<br />

1.2. The work will be carried out in accordance with the architectural drawings and structural drawings to be issued by the<br />

Engineer-in-Charge. The structural and architectural drawings shall have to be properly correlated before executing the<br />

work.<br />

1.2.1. Incase of any difference noticed between Architectural and Structural drawings, the contractor shall obtain final decision<br />

in writing of the Engineer-in-Charge.<br />

1.2.2. In case of any discrepancy in the item given in the schedule of quantities appended with the <strong>tender</strong> and architectural<br />

drawings relating to the relevant item, former shall prevail unless otherwise given in writing by the Engineer-in-Charge<br />

1.3. For items where so desired, samples shall be prepared before starting the particular items of work for prior approval of<br />

the Engineer-in-Charge and nothing extra shall be payable on this account.<br />

1.4. Materials brought at site of work shall not be used in the work before getting satisfactory Mandatory test results. For<br />

details, relevant provisions in the CPWD specification shall be referred to.<br />

1.4.1. Wherever it is desired to procure factory-made materials, such factory-made materials shall be procured from reputed<br />

and approved manufacturers or through their authorized dealers. The contractor shall have no claim if the factory made<br />

materials brought to the site are rejected by the Engineer-in-charge in part or in full due to bad workmanship/ quality etc.<br />

1.4.2. The manufactured materials brought at site of work shall, in general, conform to the relevant specifications. The<br />

contractor shall have no claim if the manufactured materials brought to the site are rejected by the Engineer-in-charge in<br />

part or in full due to bad workmanship/ quality etc.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


27<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

1.4.3. The preference amongst the various alternative materials available shall be as follows: -<br />

(a) The materials shall be as per the Brand specified to be used in the work.<br />

(b) If the Brand specified material is not available then the material shall be ISI marked.<br />

(c) If ISI marked item is not available then it should be from ISO certified Company.<br />

(d) If the ISI marked or ISO certified items are not available then the best available items in the market to be procured.<br />

1.4.4. Equivalents for the various materials and the materials of approved make shall be got approved from the Engineer-in-<br />

Charge of work in writing before using them on the work.<br />

2. The following modifications to the above specifications shall, however, apply.<br />

2.1. Earth Work<br />

2.1.1. During excavation and trenching work etc., the contractors shall ensure compliance to the guidelines in such matters<br />

laid down by the local body / bodies to ensure that there is minimum hazard to the operating personnel and users,<br />

minimum inconvenience to the users, minimized damage to the underground plant/services of other utilities in a<br />

coordinated way, in the interest of public convenience and overall safety.<br />

2.1.2. Any trenching and digging for laying sewer lines/ water lines/ cables etc. shall be commenced by the contractor only<br />

when all men, machinery’s and materials have been arranged and closing of the trench(s) thereafter shall be ensured<br />

within the least possible time.<br />

2.1.3. Surplus excavated earth which is beyond the requirement of the B.S.N.L. shall have to be disposed of by the contractor<br />

at his own cost beyond the municipal limits or at places identified by the local bodies or as directed by the Engineer-in-<br />

Charge after obtaining written permission of the Engineer-in-Charge and no payment will be made by the Department for<br />

such disposal of this surplus excavated earth.<br />

2.1.4. Unless otherwise stated in the agreement, the contractor shall, at his own expense and without extra charges, make<br />

provision for all shoring, pumping, dredging or bailing out water, if necessary, irrespective of the source of water. The<br />

foundation trenches shall be kept free from water while all the works below Ground Level are in progress, without any<br />

extra payment.<br />

2.2. R. C. C. Work (Nominal mix concrete)- Water-Cement Ratio: - For RCC Works, wherever nominal mix of concrete is<br />

stipulated in the items for work, for maintaining proper quality and durability requirements of the structure, maximum<br />

water-cement ratio shall be restricted to 0.55. If in normal course of work, the required workability is not achieved;<br />

suitable plasticizers/ admixtures may be used for improving the workability of concrete with the approval of Engineer-in-<br />

Charge. Nothing extra shall be paid towards the cost of such plasticizers/ admixtures unless otherwise stated in the<br />

nomenclature of items.<br />

2.3. Non-destructive Testing for Concrete/R.C.C Work: - The Engineer-in-charge shall, at his discretion, get the nondestructive<br />

testing (Such as Ultrasonic Pulse Velocity Test etc.) done and the Contractor shall make all necessary<br />

arrangements for getting such tests done and make good the same after the test, for which nothing extra shall be paid.<br />

The results of such tests shall be binding on the Contractor. In case of non-conformity of the test to the standards, the<br />

contractor shall be liable to re-do the concrete work at his cost including the cost of test, subject however, to the<br />

acceptability of the work as laid down in the mandatory test defined in the relevant CPWD specifications.<br />

2.4. Cement slurry, if any, added over base surface (or) for continuation of concreting for better bond is deemed to have been<br />

in built in the items (Unless other wise explicitly stated) and nothing extra shall be payable (or) extra cement considered<br />

in consumption on this account.<br />

2.5. WOOD WORK: - Timber required for manufacture of chowkhats and shutters for doors, windows, ventilators, and<br />

partitions etc. in the work shall be kiln seasoned and preservative treated. The Timber shall be kiln seasoned before<br />

applying preservative treatment. The rate quoted for various items shall be inclusive of kiln-seasoning and preservative<br />

treatment of wood. The wood used in the work shall conform to the provisions in the CPWD Specifications for works.<br />

2.6. FACTORY MADE SHUTTERS etc.:- The shutters for doors, windows & ventilators, and, chowkhats etc. shall be factory<br />

made and obtained from suppliers approved by the Engineer-in-charge.<br />

2.7. STEEL WORK:-All steel doors, steel windows, steel ventilators, wire gauge, steel glazing, steel grill shall be according to<br />

the Architect’s detailed drawings and factory made and obtained from approved suppliers.<br />

2.7.1. In the case of composite steel windows the rates shall include the cost of coupling mullion and transom etc. Where<br />

windows with inside open able shutters are fixed along-with windows with shutters open able outside, such inside open<br />

able windows shall be fitted with suitable friction hinges and open able outside with box type hinges, lever handles or<br />

otherwise as approved by the Engineer-in-Charge of the work. For such windows, cement concrete blocks of size 15cmx<br />

10cmx 10cm shall be provided. Nothing extra shall be paid on this account.<br />

2.7.2. In the case of steel windows and doors, steel glazing, wire gauge steel ventilators, rolling shutters, grills etc. an<br />

approved quality-priming coat of zinc chromate shall be applied over and above shop coat of primer. Nothing extra shall<br />

be payable for providing shop-coat primer.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


28<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

2.8. Sanitary and Water supply installations :-The contractor shall engage licensed plumber for sanitary, water supply,<br />

drainage work and shall be carried out in a manner complying in all respects with the requirement of relevant by laws of<br />

the local municipal authority. The Contractor shall give a guarantee to the effect that the work shall remain structurally<br />

stable and shall guarantee against faulty workmanship, finishing, manufacturing defects of materials and leakages etc.<br />

2.9. Approval of sample work of repetitive/ typical nature prior to general execution of work shall be as enumerated<br />

hereafter.<br />

2.9.1. Samples of typical portion of the works of repetitive nature such as typical room, toilet room, or any other work shall be<br />

prepared by the contractor under the directions and to the satisfaction of Engineer-in-Charge and got approved from him<br />

in writing before the commencement of these items for the entire work.<br />

2.9.2. The work shall be so arranged to be carried out that the requirement for preparation of samples are observed and<br />

fulfilled without any detriment to the general progress of work. In other words, this will not be allowed to have any effect<br />

on the general progress of work or on any of the terms and conditions of the contract. No claims of any kind whatsoever<br />

including the claim of extension of time will be entertained due to the incorporation of this requirement.<br />

2.10. FLOOR TEST FOR TELEPHONE EXCHANGE BUILDINGS:<br />

2.10.1. Wherever applicable as decided by Engineer-in-charge, the floor of Technical rooms in the T.E. buildings shall be laid<br />

in such a way that the limits in floor levels would not be exceeded as follows.<br />

(a) The levels at any places when checked over a distance of one metre in any direction would not show variation in floor<br />

levels in excess of 3mm.<br />

(b) The levels if checked over a distance of 4 metres in any direction shall not to exceed 5mm.<br />

(c) The maximum permissible variation in the levels at any two points more than 4 meters away in any direction in the same<br />

room shall not be more than 8mm.<br />

(d) Floor levels shall be taken at every metre and recorded in a “Level chart” for flooring in all technical room. This shall be<br />

checked, prepared and Certified by the Assistant Engineer-in-Charge of the work and contractor. This level chart shall be<br />

checked by the Engineer-in-Charge of work to satisfy himself that levels in the floors of technical rooms are with in the<br />

variation limits laid down at I) to iii) above.<br />

2.11. TEST RESULTS & RELATED ASPECTS<br />

2.11.1. Normally, part-rate payment shall be allowed in the running account bills only if the materials conforming to the<br />

CPWD specifications for works as mentioned in the work are tested and test results are found to be satisfactory by<br />

the Engineer-in-Charge.<br />

2.11.2. The Engineer-in-Charge of work shall check the test results and satisfy himself before allowing any payment in the<br />

running/final bill.<br />

[C] PARTICULAR SPECIFICATIONS<br />

1. TOWER FOUNDATION AND INFRASTRUCTURE WORKS:<br />

1.1. The location/place and the district indicated in the <strong>tender</strong> is provisional. Although every effort shall be made to carry out<br />

the work at the indicated location, the site of work can be shifted by mutual consent, to any other location within the same<br />

revenue district. Once the contractor consents for shifting, he shall be bound to carry out the work on the shifted location<br />

at his accepted rates and at the same terms and conditions. He shall be deemed to have full knowledge of the changed<br />

site whether he inspects it or not and no extra charges consequent on any misunderstanding or otherwise shall be<br />

allowed.<br />

1.2. The foundation shall be constructed in accordance with specifications and drawings as per TEC’s Generic Requirements<br />

published vide GR No: GR/TWR-12/01-JUN 2005 with upto date amendments. The above mentioned specifications are<br />

available for reference in respective civil division offices. The specification is also available as a priced publication at the<br />

Telecom Engineering Centre, Khurshid Lal Bhawan, Janpath, New Delhi-110001<br />

1.3. The provisions of all relevant IS Codes and CPWD specifications for the work shall be applicable irrespective of whether<br />

they are explicitly mentioned in the above TEC specifications or not.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


29<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

ADDITIONAL SPECIFICATIONS<br />

GENERAL<br />

(1) The work shall in general confirm to the relevant specifications of the C.P.W.D. specifications for work 1996 Vol. I to<br />

VI with upto date correction slips.<br />

(2) Should there be any difference between the specifications mentioned above and the specifications given in the<br />

schedule of quantities, the latter shall prevail.<br />

(3) The following modifications to the above specifications shall however apply.<br />

(1) Earth work:<br />

a) Surplus excavated earth which is beyond the requirement of department of Telecom shall have to be disposed off by<br />

the contractor at his own cost after obtaining written permission of Engineer-in-Charge and no payment by the<br />

department for disposal of this surplus excavated earth will be made.<br />

(2) Steel work:<br />

Steel 10.1.2009-rs and windows shall be fabricated and fixed in position as per C.P.W.D. specification – 1996<br />

(volume – III ) para 10.10 Central hinges shall only be provided to side hung steel windows.<br />

2.1 Thickness of sheet glass provided in glazing being governed as under unless otherwise specified in<br />

the item:-<br />

S. No. Area of glazing Minimum thickness<br />

1. For glazing area upto 0.50 Sqm. 4 mm<br />

2. For glazing area more than 0.50 Sqm. 5.5 mm<br />

(3). Flooring: (only for technical rooms in T.E. Building)<br />

3.1 The floor of technical rooms in the telephone exchange building shall be laid in such a way that the limits in floor<br />

levels would not be exceeded as follows:<br />

i) The levels at any place when checked over a distance of 1.0 metre in any direction would not show variation in floor<br />

level in excess of 3mm.<br />

ii) The levels if checked over a distance of 4.0 metre in any direction should not be found to exceed 5mm.<br />

iii) The maximum permissible variation in the levels at any two points more than 4.0 metre away in any direction in the<br />

same room should not be more than 8mm.<br />

iv) Floor level shall be taken at every metre and recorded in a level chart for flooring in all technical rooms. This shall be<br />

prepared and signed by the assistant engineer and the contractor. This level chart shall be checked by the<br />

Engineer-in-Charge of work to satisfy himself that the levels in the floors of technical rooms are within the variation<br />

limits laid down under para 3.1 above.<br />

v) No payment of flooring in technical rooms shall be allowed till level chart be prepared and meet the requirement<br />

mentioned above. The levels are to be checked and certified by the Engineer-in-Charge.<br />

(4) Sampling of materials:<br />

4.1) Approval of sampling work of repetitive / typical nature required for the actual execution of work shall be as<br />

enumerated here after all samples of typical portion of works of repetitive such as typical rooms, toilet room, or any<br />

other work assigned by the Engineer-in-Charge of works, shall be prepared by the contractor under the direction and<br />

to the satisfaction of the Engineer-in-Charge and got approved from him in writing before the commencement of<br />

those items for the entire work.<br />

4.2) The work shall have to be so arranged to be carried out that requirement for preparation of samples are observed<br />

and obtained without any delay to the general progress of the work. In other words this will not be allowed to have<br />

any effect on the general progress of the work or any terms and conditions of the contract. No claims of any kind<br />

includes the claims of extension of time will be entertained due to incorporation of this requirement.<br />

5. Programme for Execution of work:<br />

5.1) The contractor shall submit a “BAR CHART” to the Engineer-in-Charge indicating the duration of various construction<br />

activities for technical as well as non-technical blocks, quarters etc. separately with in a month from the date of<br />

award of work. The total time taken for various activities should not exceed the stipulated time of completion<br />

specified in the 106.<br />

5.2 The work shall be executed as per Programme approved by the Engineer-in-Charge of the work. No claim<br />

whatsoever will be entertained on this account.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


30<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

(6) Miscellaneous:<br />

6.1. The rate for every item of work to be done under this contract shall be for all heights, depths, lengths and widths of<br />

the structure (except where specifically mentioned in the item) and nothing extra will be paid on this account.<br />

6.2. Damage done by the contractor to any existing work during the course of execution of the work awarded to him shall<br />

be made good by him at his own cost.<br />

6.3. The contractor will work in close liaison with the contractors during the work of water supply, sa106ary, drainage<br />

arrangement, electrical installations and any other works and adjust plan his work accordingly.<br />

6.4. The contractor shall maintain in good condition all work during execution till completion of entire work allotted to him.<br />

6.5. Sales Tax @ 4.0% (four percent) will be deducted from the gross amount of the work done.<br />

6.6 Wooden shuttering and scaffolding if steel shuttering not feasible can be used with approval of the Engineer-incharge.<br />

(CONTRACTOR) (EXECUTIVE ENGINEER)<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


GERNAL SPECIFICATIONS<br />

ADDITIONAL CONDITIONS FOR CEMENT AND STEEL<br />

31<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

“A” Conditions for Cement<br />

1. The contractor shall procure 43 grade (conforming to IS: 8112) ordinary Portland cement, as required in the work,<br />

from reputed manufacturers of cement, having a production – capacity of one million tones per annum or more such<br />

as A.C.C., L. & T., J.P. Rewa, Vikram, Shri Cement, Birla Jute and cement Corporation of India etc. as approved by<br />

Ministry of Industry Government of India and holding license to use ISI Certification mark for their product whose<br />

name shall be got approved from Engineer-in-Charge. Supply or cement shall be taken in 50 Kg. bags bearing<br />

manufacturer’s name and ISI marking. Samples of cement arranged by the contractor shall be taken by the<br />

Engineer-in-Charge and got tested in accordance with provisions of the relevant BIS Codes. In case tests results<br />

indicate that the cement arranged by the contractor does not conform to the relevant BIS Codes the same shall stand<br />

rejected and shall be removed from the site by the contractor at his own cost within a week’s time of written order<br />

from the Engineer-in-Charge to do so.<br />

2. The cement shall be brought at site in bulk supply of approximately 50 tones or as decided by the Engineer-in-<br />

Charge.<br />

3. The cement godown of the capacity to store about 2000 bags of cement or as decided by the Engineer-in-Charge<br />

shall be constructed by the contractor at site of work for which no extra payment shall be made. Double lock<br />

provision shall be made to the 10.1.2009-r of the cement godown. The keys of one lock shall remain with the<br />

Engineer-in-Charge or his authorized representative and the key of other lock shall remain with the contractor. The<br />

contractor shall facilitate the inspection of the cement godown by the Engineer-in-Charge at any time.<br />

4. The contractor shall supply free of charge the cement required for testing. The cost of tests shall be borne by the<br />

contractor / Department in the manner indicated below:-<br />

i) By the contractor, if the result shows that the cement does not conform to relevant BIS Codes.<br />

ii) By the Department, if the result show that the cement conform to relevant BIS Codes.<br />

5. The actual issue and consumption of cement on work shall be regulated and proper accounts maintained as<br />

provided in Clauses 10 of the contract. The theoretical consumption of cement shall be worked out as per procedure<br />

prescribed in Clause-42 of the contract and shall be governed by conditions laid therein.<br />

6. Cement brought to site and cement remaining unused after completion of work shall not be removed from site<br />

without the written permission of the Engineer-in-Charge.<br />

“B” Conditions for Steel<br />

1. The contractor shall procure steel reinforcement bars conforming to relevant BIS Codes f<br />

2. The steel reinforcement shall be brought to the site in quantity of lots as approved by the Engineer-in-Charge.<br />

3. The steel reinforcement shall be stored by the contractor at site of work in such a way as to prevent distortion and<br />

corrosion and nothing extra shall be paid on this account. Bars of different sizes and lengths shall be stored<br />

separately to facilitate easy counting and checking.<br />

4.7 The contractor shall supply free of charge steel bars required for testing. The cost of tests shall be borne by the<br />

contractor/Department in the manner indicated below:-<br />

i) By the contractor, if the results show that the steel does not conform to relevant BIS Codes.<br />

ii) By the Department, if the result shows that the steel conform to relevant BIS Codes.<br />

5. The actual issue and consumption of steel on work shall be regulated and proper accounts maintained as provided in<br />

Clause-10 of the contract. The theoretical consumption of steel shall be worked out as per procedure prescribed in<br />

Clauses-42 of the contract and shall be governed by conditions laid therein.<br />

6. Co-efficient of weight i.e. the weight per u106 length of the steel procured by the contractor shall be ascertained at<br />

the site before using it and certified by the Engineer-in-Charge. In case weight per u106 length is beyond the rolling<br />

margin as laid down in the BIS: 1786 the steel will be rejected and shall be removed as per para-1 above. In case<br />

weight per u106 length is more than the standard co-efficient of weight for the diameter, but is within the rolling<br />

margin, then the payment shall be made as per the standard weight per u106 length and where the weight per u106<br />

length is lesser than the standard co-efficient or weight for the diameter, but is within rolling margin, the payment<br />

shall be restricted with respect to actual weight per u106 length of the diameter.<br />

7. Steel brought to site and remaining unused shall not be removed from site without the written permission of the<br />

Engineer-in-Charge.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..


(To GCC for BSNL civil works-2006, issued on 15.04.2009)<br />

32<br />

NIT No. 20/EE/BSNL/CD/RTK/2009-10<br />

Correction Slip No. 3<br />

S.<br />

No.<br />

Clause Existing Provision Modified Provision<br />

1 1 ……… For amount exceeding Rs.6.00 Lakhs ……For amount exceeding Rs.15.00 Lakhs<br />

(Rupees six lakhs) shall submit an irrevocable (Rupees Fifteen lakhs) shall submit an<br />

PERFORMANCE GUARANTEE of 5% (Five irrevocable PERFORMANCE GUARANTEE<br />

percent) of the <strong>tender</strong>ed amount ………. of 5% (Five percent) of the <strong>tender</strong>ed<br />

amount…….<br />

2 1A (Foot In case of works with estimated cost put to In case of works with estimated cost put to<br />

Note) <strong>tender</strong> is up-to and including Rs. 6,00,000/-, the <strong>tender</strong> is up-to and including Rs. 15,00,000/clause-1<br />

shall not be applicable, and …….. , the clause-1 shall not be applicable, and<br />

……..<br />

3 17 ………if any defect, shrinkage or other faults ………if any defect, shrinkage or other faults<br />

appear in the work within twelve months (12 appear in the work within twelve months<br />

months) after a certificate final ….. the (12 months) (six months in the case of<br />

contractor shall …. make the same good at his work costing Rs. Fifteen lakhs and below<br />

own expense or ….a sufficient portion thereof. except road work) after a certificate final<br />

The security deposit of the contractor shall not ….. the contractor shall …. make the same<br />

be refunded before the expiry of twelve good at his own expense or ….a sufficient<br />

months after the issue of the certificate final or portion thereof. The security deposit of the<br />

otherwise, of completion of work, or till the final contractor shall not be refunded before the<br />

bill has been prepared and passed whichever is expiry of twelve months (six months in<br />

later.<br />

the case of work costing Rs. Fifteen lakhs<br />

and below except road work) after the<br />

issue of the certificate final or otherwise, of<br />

completion of work, or till the final bill has<br />

been prepared and passed whichever is<br />

later.<br />

S.<br />

No.<br />

1<br />

ANNEXURE-A<br />

Subject Existing Provision Modified Provision<br />

Cost of<br />

work for<br />

publicity<br />

of NIT<br />

through<br />

press.<br />

It will be mandatory for all units including civil &<br />

electrical wings to display NITs on the website;<br />

of <strong>tender</strong>s whose values is upto Rs. 2 Lakhs.<br />

It will be mandatory for civil and electrical<br />

wing to display NITs on the website; of<br />

<strong>tender</strong>s whose estimated cost / value is upto<br />

Rs. 5 Lakhs.<br />

However, in respect of works estimated to<br />

cost more than Rs. 5 lakh a brief<br />

advertisement inviting <strong>tender</strong>s should also<br />

be invariably inserted in the press in the<br />

classified category.<br />

Addl. … nil….… Deletion..…nil..….. Corr………nil …… Overwriting………nil…..

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!