Exercises 59<br />

Package Ease of use Facilities available<br />

Super Quill 100 30<br />

Easywrite 90 70<br />

Wordright 50 20<br />

Lexico 0 40<br />

Ultraword 20 100<br />

Keywrite 40 0<br />

Fastwrite 85 55<br />

(a) Plot each package’s value for ‘ease of use’ and ‘facilities available’<br />

on a graph and hence determine the packages which lie<br />

on the efficient frontier.<br />

(b) Suppose that you judge that a switch from a package with the<br />

least facilities available to one with the most facilities is only<br />

60% as attractive as a switch from a package which is the least<br />

easy to use to one which is the most easy to use. Assuming<br />

that mutual preference independence exists between the two<br />

attributes, which package should you choose?<br />

(c) After some reflection you realize that the extra facilities available<br />

on a package will be of little value to you if they are going<br />

to be difficult to use. What does this imply about your method<br />

of analysis in (b)?<br />

(3) A chemical company is expanding its operations and a disused<br />

woollen mill is to be converted into a processing plant. Four<br />

companies have submitted designs for the equipment which will<br />

be installed in the mill and a choice has to be made between<br />

them. The manager of the chemical company has identified three<br />

attributes which he considers to be important in the decision: ‘cost’,<br />

‘environmental impact’ and ‘reliability’. He has assessed how well<br />

each design performs on each attribute by allocating values on a<br />

scale from 0 (the worst design) to 100 (the best). These values are<br />

shown below, together with the costs which will be incurred if a<br />

design is chosen.<br />

Design Cost ($)<br />

Benefits<br />

Environmental<br />

impact Reliability<br />

A 90 000 20 100<br />

B 110 000 70 0<br />

C 170 000 100 90<br />

D 60 000 0 50