Multi-attribute utility 125<br />

Mutual utility independence<br />

Suppose that the project manager is indifferent between the following<br />

alternatives:<br />

A: A project which will certainly overrun by 2 weeks and which will<br />

certainly cost $50 000; and<br />

B: A gamble which will give him a 50% chance of a project which<br />

overruns by 0 weeks (i.e. it meets the target) and which will cost<br />

$50 000 and a 50% chance of a project which will overrun by 6 weeks<br />

and cost $50 000.<br />

These alternatives are shown in Figure 5.17(a) (note that all the costs are<br />

the same).<br />

Suppose that we now offer the project manager the same two<br />

options, but with the project costs increased to $140 000, as shown<br />

in Figure 5.17(b). If the project manager is still indifferent between the<br />

options then clearly his preference between the overrun times is unaffected<br />

by the change in costs. If this is the case for all possible costs then<br />

overrun time is said to be utility independent of project cost. Putting this<br />

in more general terms: attribute A is utility independent of attribute B<br />

if the decision maker’s preferences between gambles involving different<br />

levels of A, but the same level of B, do not depend on the level of<br />

attribute B.<br />

It can be seen that utility independence is analogous to preference<br />

independence, which we discussed in Chapter 3, except that we are now<br />

A:<br />

C:<br />

Figure 5.17<br />

1.0<br />

1.0<br />

Overrun Cost<br />

2 weeks $50000<br />

Overrun Cost<br />

2 weeks<br />

(a)<br />

$140000<br />

(b)<br />

B:<br />

D:<br />

0.5<br />

0.5<br />

0.5<br />

0.5<br />

Overrun Cost<br />

0 weeks $50000<br />

6 weeks $50000<br />

Overrun Cost<br />

0 weeks<br />

$140000<br />

6 weeks $140000