17107/12 FL/ne 1 DG E 2 A COU CIL OF THE EUROPEA U ... - Europa
17107/12 FL/ne 1 DG E 2 A COU CIL OF THE EUROPEA U ... - Europa 17107/12 FL/ne 1 DG E 2 A COU CIL OF THE EUROPEA U ... - Europa
PART III: LIST OF PRE-IDENTIFIED PRIORITITES AND AREAS OF INTERVENTION IN THE TELECOMMUNICATIONS SECTOR 60 a) Horizontal priorities Innovative Management, Mapping & Services Technical assistance and project replication measures, where necessary for deployment and governance, including project and investment planning and feasibility studies. Mapping of pan-European broadband infrastructure to develop an on-going detailed physical surveying and documentation of relevant sites, analysis of rights of way, assessments of potential for upgrading existing facilities, etc. Analysis of the environmental impact, taking into account climate change adaptation and mitigation needs, and disaster resilience Support actions and other technical support measures Actions needed to prepare implementation of projects of common interest or actions contributing to that purpose, including preparatory, feasibility, evaluation and validation studies, and any other technical support measure, including prior action to define and develop an action fully. 60 Since the content of the Annex is closely linked to the issue of the functional link (see footnote for Article 7(4) as well as to the discussions on the Commission proposal for a Regulation on guidelines for trans-European telecommunications networks and repealing Decision No 1336/97/EC (hereinafter "INFSO guidelines"), Part III of the Annex will be subject to further discussions in the Telecom Working Party. 17107/12 FL/ne 74 ANNEX TO ANNEX DG E 2 A E
) Broadband networks Intervention in the field of broadband shall contribute to smart and inclusive growth through building a balanced and geographically diversified portfolio of broadband projects, including both 30Mbps and 100Mbps plus projects; with urbansuburban and rural projects, in order to reach a satisfactory level of connectivity in all the Member States. Characteristics of the intervention Description The intervention in the field of broadband networks shall include: The intervention in the field of broadband networks shall consist in particular of one or more of the following elements: Investments in broadband networks capable of achieving the Digital Agenda 2020 target of universal coverage at 30Mbps; or Investments in broadband networks capable of achieving the Digital Agenda 2020 target and having at least 50% of households subscribing to speeds above 100Mbps; The deployment of passive physical infrastructure or the deployment of combined passive and active physical infrastructure and ancillary infrastructure elements, complete with services necessary to operate such infrastructure; Associated facilities and associated services, such as building wiring, antennae, towers and other supporting constructions, ducts, conduits, masts, manholes, and cabinets; Exploitation of potential synergies between the roll- out of broadband networks and other utilities networks (energy, transport, water, sewage, etc), in particular those related to smart electricity distribution. 17107/12 FL/ne 75 ANNEX TO ANNEX DG E 2 A E
- Page 23 and 24: Article 3 General objectives The CE
- Page 25 and 26: (iii) optimising multimodality, eff
- Page 27 and 28: (iii) The achievement of the object
- Page 29 and 30: CHAPTER II FORMS OF FIACIG AD FIACI
- Page 31 and 32: (h) actions implementing safe and s
- Page 33 and 34: 5. Expenditure related to environme
- Page 35 and 36: 5. [...] 6. Multiannual and annual
- Page 37 and 38: 4. In the telecommunications sector
- Page 39 and 40: (a) with regard to grants for studi
- Page 41 and 42: CHAPTER V FIACIAL ISTRUMETS Article
- Page 43 and 44: 4. Financial instruments provided u
- Page 45 and 46: 6. The Commission, when establishin
- Page 47 and 48: (a) that the projects of common int
- Page 49 and 50: Article 21 Responsibility of benefi
- Page 51 and 52: 4. Without prejudice to paragraphs
- Page 53 and 54: 2. The Commission shall carry out e
- Page 55 and 56: Article 30 Entry into force This Re
- Page 57 and 58: PRE-IDENTIFIED SECTIONS INCLUDING P
- Page 59 and 60: Mediterranean Corridor ALIGNMENT: A
- Page 61 and 62: PRE-IDENTIFIED SECTIONS INCLUDING P
- Page 63 and 64: Brenner Base Tunnel Rail studies an
- Page 65 and 66: Lisboa - Strasbourg ALIGNMENT: Sine
- Page 67 and 68: Amsterdam - Basel/Lyon - Marseille
- Page 69 and 70: 3) Other Sections on the Core Netwo
- Page 71 and 72: PART II: LIST OF INFRASTRUCTURE PRI
- Page 73: 8. Southern Gas Corridor ("SGC"): T
- Page 77 and 78: Deployment of information and commu
- Page 79 and 80: Prior to the finalisation of the de
- Page 81 and 82: 4. Implementation Entrusted entitie
- Page 83 and 84: 8. Duration of the Debt Instrument
- Page 85 and 86: 4. Implementation Entrusted entitie
- Page 87 and 88: 9. Expiry Union contribution alloca
) Broadband <strong>ne</strong>tworks<br />
Intervention in the field of broadband shall contribute to smart and inclusive growth through<br />
building a balanced and geographically diversified portfolio of broadband projects, including both<br />
30Mbps and 100Mbps plus projects; with urbansuburban and rural projects, in order to reach a<br />
satisfactory level of con<strong>ne</strong>ctivity in all the Member States.<br />
Characteristics of the intervention Description<br />
The intervention in the field of broadband <strong>ne</strong>tworks<br />
shall include:<br />
The intervention in the field of broadband <strong>ne</strong>tworks<br />
shall consist in particular of o<strong>ne</strong> or more of the<br />
following elements:<br />
Investments in broadband <strong>ne</strong>tworks capable of<br />
achieving the Digital Agenda 2020 target of universal<br />
coverage at 30Mbps; or<br />
Investments in broadband <strong>ne</strong>tworks capable of<br />
achieving the Digital Agenda 2020 target and having<br />
at least 50% of households subscribing to speeds<br />
above 100Mbps;<br />
The deployment of passive physical infrastructure or<br />
the deployment of combi<strong>ne</strong>d passive and active<br />
physical infrastructure and ancillary infrastructure<br />
elements, complete with services <strong>ne</strong>cessary to operate<br />
such infrastructure;<br />
Associated facilities and associated services, such as<br />
building wiring, antennae, towers and other<br />
supporting constructions, ducts, conduits, masts,<br />
manholes, and cabi<strong>ne</strong>ts;<br />
Exploitation of potential sy<strong>ne</strong>rgies between the roll-<br />
out of broadband <strong>ne</strong>tworks and other utilities<br />
<strong>ne</strong>tworks (e<strong>ne</strong>rgy, transport, water, sewage, etc), in<br />
particular those related to smart electricity<br />
distribution.<br />
<strong>17107</strong>/<strong>12</strong> <strong>FL</strong>/<strong>ne</strong> 75<br />
ANNEX TO ANNEX <strong>DG</strong> E 2 A E