4. North-South electricity interconnections in Central Eastern and South Eastern Europe ("NSI East Electricity"): 5. North-South gas interconnections in Central Eastern and South Eastern Europe ("NSI East Gas"): 6. Baltic Energy Market Interconnection Plan in electricity ("BEMIP Electricity"): 7. Baltic Energy Market Interconnection Plan in gas ("BEMIP Gas"): Strengthening interconnections and internal lines in North- South and East-West directions to complete the internal market and integrate generation from renewable energy sources Strengthening regional gas connections between the Baltic Sea region, the Adriatic and Aegean Seas and the Black Sea, notably to enhance diversification and security of gas supply Developing interconnections between Member States in the Baltic region and reinforcing internal grid infrastructures accordingly, to end isolation of the Baltic States and to foster market integration in the region Ending the isolation of the three Baltic States and Finland by ending single supplier dependency and increasing diversification of supplies in the Baltic Sea region Austria, Bulgaria, Czech Republic, Cyprus, Germany, Greece, Hungary, Italy, Poland, Romania, Slovakia, Slovenia Austria, Bulgaria, Czech Republic, Cyprus, Germany, Greece, Hungary, Italy, Poland, Romania, Slovakia, Slovenia Denmark, Estonia, Finland, Germany, Latvia, Lithuania, Poland, Sweden Denmark, Estonia, Finland, Germany, Latvia, Lithuania, Poland, Sweden 17107/12 FL/ne 72 ANNEX TO ANNEX DG E 2 A E
8. Southern Gas Corridor ("SGC"): Transmission of gas from the Caspian Basin, Central Asia, the Middle East and the East Mediterranean Basin to the Union to enhance diversification of gas supply b) Priority Areas Smart grids deployment: Accelerating the adoption of smart grid Austria, Bulgaria, Czech Republic, Cyprus, France, Germany, Greece, Hungary, Italy, Poland, Romania, Slovakia, Slovenia Objective Member States concerned technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network Electricity highways Developing the first electricity highways up to Cross-border carbon dioxide network 2020, in view of building an electricity highways system across the Union Preparing the construction of carbon dioxide transport infrastructure between Member States in view of the deployment of carbon dioxide capture and storage 17107/12 FL/ne 73 ANNEX TO ANNEX DG E 2 A E all all all
- Page 21 and 22: (8) "beneficiary" means a Member St
- Page 23 and 24: Article 3 General objectives The CE
- Page 25 and 26: (iii) optimising multimodality, eff
- Page 27 and 28: (iii) The achievement of the object
- Page 29 and 30: CHAPTER II FORMS OF FIACIG AD FIACI
- Page 31 and 32: (h) actions implementing safe and s
- Page 33 and 34: 5. Expenditure related to environme
- Page 35 and 36: 5. [...] 6. Multiannual and annual
- Page 37 and 38: 4. In the telecommunications sector
- Page 39 and 40: (a) with regard to grants for studi
- Page 41 and 42: CHAPTER V FIACIAL ISTRUMETS Article
- Page 43 and 44: 4. Financial instruments provided u
- Page 45 and 46: 6. The Commission, when establishin
- Page 47 and 48: (a) that the projects of common int
- Page 49 and 50: Article 21 Responsibility of benefi
- Page 51 and 52: 4. Without prejudice to paragraphs
- Page 53 and 54: 2. The Commission shall carry out e
- Page 55 and 56: Article 30 Entry into force This Re
- Page 57 and 58: PRE-IDENTIFIED SECTIONS INCLUDING P
- Page 59 and 60: Mediterranean Corridor ALIGNMENT: A
- Page 61 and 62: PRE-IDENTIFIED SECTIONS INCLUDING P
- Page 63 and 64: Brenner Base Tunnel Rail studies an
- Page 65 and 66: Lisboa - Strasbourg ALIGNMENT: Sine
- Page 67 and 68: Amsterdam - Basel/Lyon - Marseille
- Page 69 and 70: 3) Other Sections on the Core Netwo
- Page 71: PART II: LIST OF INFRASTRUCTURE PRI
- Page 75 and 76: ) Broadband networks Intervention i
- Page 77 and 78: Deployment of information and commu
- Page 79 and 80: Prior to the finalisation of the de
- Page 81 and 82: 4. Implementation Entrusted entitie
- Page 83 and 84: 8. Duration of the Debt Instrument
- Page 85 and 86: 4. Implementation Entrusted entitie
- Page 87 and 88: 9. Expiry Union contribution alloca
8. Southern Gas Corridor ("SGC"): Transmission of gas from<br />
the Caspian Basin,<br />
Central Asia, the Middle<br />
East and the East<br />
Mediterra<strong>ne</strong>an Basin to<br />
the Union to enhance<br />
diversification of gas<br />
supply<br />
b) Priority Areas<br />
Smart grids deployment: Accelerating the adoption of smart grid<br />
Austria, Bulgaria, Czech Republic,<br />
Cyprus, France, Germany, Greece,<br />
Hungary, Italy, Poland, Romania,<br />
Slovakia, Slovenia<br />
Objective Member States concer<strong>ne</strong>d<br />
technologies across the Union to efficiently<br />
integrate the behaviour and actions of all<br />
users con<strong>ne</strong>cted to the electricity <strong>ne</strong>twork<br />
Electricity highways Developing the first electricity highways up to<br />
Cross-border carbon dioxide<br />
<strong>ne</strong>twork<br />
2020, in view of building an electricity<br />
highways system across the Union<br />
Preparing the construction of carbon dioxide<br />
transport infrastructure between Member<br />
States in view of the deployment of carbon<br />
dioxide capture and storage<br />
<strong>17107</strong>/<strong>12</strong> <strong>FL</strong>/<strong>ne</strong> 73<br />
ANNEX TO ANNEX <strong>DG</strong> E 2 A E<br />
all<br />
all<br />
all