A User's Manual for DELSOL3 - prod.sandia.gov - Sandia National ...
A User's Manual for DELSOL3 - prod.sandia.gov - Sandia National ...
A User's Manual for DELSOL3 - prod.sandia.gov - Sandia National ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CH<br />
CL<br />
CWR<br />
CWDR<br />
CWDA<br />
ITHT<br />
CTOWl<br />
CTOW2<br />
CTOW3<br />
XTOW<br />
CRECl<br />
ARECRF<br />
XREC<br />
Namelist NLCOST'<br />
Cost of heliostats including wiring; $/mz mirror surface.<br />
Default: CH = 120.00 ($/m2) (V.A-1)<br />
Cost of land including site preparation; $/m2.<br />
Default: CL = 0.62 ($/m2) (V.A-2)<br />
Wiring cost parameters; CW, total wiring cost in<br />
$/heliostat, given by<br />
CW = CWRXRAD + CWDRXRSEP + CWDAxAZMSEP<br />
where RAD, RSEP, AZMSEP are calculated from variables in<br />
the FIELD namelist. The cost CW is already included in<br />
heliostat cost, but is separated by the code using this<br />
algorithm.<br />
Default: CWR = 0.03077 ($/m)<br />
CWDR = 15.0 ($/m)<br />
CWDA = 9.0 ($/m) (V.A-3)<br />
Parameter <strong>for</strong> tower cost:<br />
= 0, cost based on <strong>Sandia</strong> studies <strong>for</strong> concrete and steel towers;<br />
= 1, user supplied values <strong>for</strong> CTOWl and CTOW2 to be used<br />
<strong>for</strong> all THTB.<br />
Default: ITHT = 0 (V. A-4)<br />
Tower cost parameters; CTOW, tower cost in $, given by<br />
CTOW = CTOWl x e"T0W2xTHTB<br />
CTOW = CTOW3 x eXToWxTHTB<br />
THTB 2 120.0(m)<br />
THTB < 120.0(m)<br />
where THTB is the actual tower height from the ground to<br />
the receiver base.<br />
Default: CTOWl = 0.78232 x loG($)<br />
CTOW2 = 0.0113(l/m)<br />
CTOW3 = 1.09025 x loG($)<br />
XTOW = 0.00879(1/m) ( V . A-4)<br />
Receiver cost parameters; CREC, receiver cost in $, given by:<br />
CREC = CREC1' (AREC/ARECRF)XRE''<br />
See text <strong>for</strong> definition of AREC and ARECRF <strong>for</strong> cavity designs.<br />
Default: CRECl = 23.0~10~<br />
ARECRF = 758 (m')<br />
XREC = 0.8 (V.A-5)<br />
* All reference powers in the cost models refer to the rated power at the design conditions,<br />
not to the power at the base of the tower (unless the corresponding solar multiple is 1.0).<br />