01.03.2013 Views

A User's Manual for DELSOL3 - prod.sandia.gov - Sandia National ...

A User's Manual for DELSOL3 - prod.sandia.gov - Sandia National ...

A User's Manual for DELSOL3 - prod.sandia.gov - Sandia National ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>for</strong> meteorological equipment. The default value is CH = $120.0/m2 of heliostat<br />

area, which applies to a high reflectivity glass-metal heliostat. This value is con-<br />

sistent with stated near-term cost goals of the 1984 five year plan.<br />

V.A-2. Land-The cost of land should be the cost of unimproved land. The<br />

area of land needed includes all of the land in each zone, increased by 30% to<br />

account <strong>for</strong> roads and additional land around the field, and increased by a fixed<br />

amount to account <strong>for</strong> the core area of the plant.<br />

( rezone<br />

CCLAND = CL<br />

x total land area<br />

m21and) $<br />

{ = CL land area x 1.3 -t 0.18E6m2<br />

The default value is CL (CL) = $0.62/m2 of land area.<br />

(V.A - 3)<br />

V.A-9. WirineThe calculated wiring costs are assumed to be included in<br />

the input heliostat cost, and are calculated and separated from heliostat costs by<br />

DELSOL according to the following:<br />

zones<br />

CWIRE = (CW,RRi -k CW,ARARi.+ CW,AAZAAzi)<br />

i<br />

x number of heliostats in zone i<br />

where Ri = radial distance from the tower base to zone i<br />

ARi = average row spacing in zone i<br />

AAzi = average spacinb between heliostats on the same<br />

row in zone i.<br />

(V.A - 4)<br />

This model was supplied with the field per<strong>for</strong>mance results from Reference 9. It<br />

is designed to penalize heliostats placed farther out due to requirements of larger<br />

(or more) primary cables as the field grows radially from the tower, and longer<br />

plowed-in secondary line runs as the mirror density decreases with distance from<br />

the tower. From the defined zoning and density option in namelists FIELD and<br />

OPT, Ri, AR;, and AAzi are known. Default values <strong>for</strong> the wiring cost parame-<br />

ters, given <strong>for</strong> a single heliostat and as provided in Reference 35, are:<br />

C~,R(CWR) = $0.03077/m<br />

CW,AR(CWDR) = $15.00/m<br />

CW,AA~ (C WDA) = $9.0O/m<br />

121

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!