Labs21: Optimizing Laboratory Ventilation Design - Labs21 ...
Labs21: Optimizing Laboratory Ventilation Design - Labs21 ... Labs21: Optimizing Laboratory Ventilation Design - Labs21 ...
Air Change Rates – What the team found • No codes, just guidelines • No Standard Industry Practice • Questioned client’s standard for air change rates in laboratories • Higher Rates Alone DO NOT EQUAL Assured Effective Ventilation Payette Associates Princeton Guyot Hall Addition Labs 21 Phone Forum - August 2003
Air Change Rates – Design Process • Baseline Criteria - Initial Model – Based on client standard of 10 Air Changes – Effectiveness – Layout • Intermediate Modeling – 6 Air Changes – Diffuser Locations – Effectiveness • Final Model – 8 Air Changes – Diffuser Locations – Effectiveness – Client Responsiveness Payette Associates Princeton Guyot Hall Addition Labs 21 Phone Forum - August 2003
- Page 1 and 2: Labs 21 Phone Forum Optimizing Labo
- Page 3 and 4: Project Team Boston Payette Associa
- Page 5 and 6: Green or LEED? • Project’s pros
- Page 7: Air Change Rates - Guidelines ASHRA
- Page 11 and 12: CFD Modeling of Lab Spaces: Case St
- Page 13 and 14: What is CFD � CFD = Computational
- Page 15 and 16: The CFD Process � Define the regi
- Page 17 and 18: What you get After Running CFD �
- Page 19 and 20: Turbulence - Why Worry? � Turbule
- Page 21 and 22: Including the Effects of Turbulence
- Page 23 and 24: Guyot Hall Teaching Lab - Geometry
- Page 25 and 26: Guyot Hall Research Lab - Geometry
- Page 27 and 28: Industrial Lab - RANS Model Figure
- Page 29 and 30: Industrial Lab - LES Result LES Ani
- Page 31: Where do we go from here? • How d
Air Change Rates – What the team found<br />
• No codes, just guidelines<br />
• No Standard Industry Practice<br />
• Questioned client’s standard for air change rates in laboratories<br />
• Higher Rates Alone DO NOT EQUAL Assured Effective <strong>Ventilation</strong><br />
Payette Associates<br />
Princeton Guyot Hall Addition<br />
Labs 21 Phone Forum - August 2003