56<br />

A<br />

Appendix A<br />

Adequate coverage can be achieved using parallel or zigzag paths (Figure A-3).<br />

Figure A-3 – Parallel Coverage Path<br />

On the downstream slope a zigzag path is recommended to ensure that any defects are<br />

detected.<br />

Stop and Look<br />

At several points on the slope, you should stop and look around through 360 degrees to<br />

check alignments and to be sure that some important feature of the slope has not been<br />

overlooked.<br />

(e) Particular Techniques<br />

The following is a list of methods that can be used to monitor changes, which will occur<br />

over a period of time.<br />

Sighting<br />

A sighting technique, similar to that used when selecting straight pieces of timber, can<br />

be used in identifying misalignment as well as high or low areas along a surface. The<br />

technique is illustrated in Figure A-4.<br />

Figure A-4 – Sighting Technique<br />

The same method can be used to sight along the crest of a dam (see Figure A-5). Centre<br />

the eyes along the line being viewed. Sighting along the line, move from side to side a<br />

little to view the line from several angles.<br />

Looking through a pair of binoculars will help to make any variations more obvious,<br />

Probing<br />

The probe is pressed into the earthen batter slopes, on the crest or at places being<br />

inspected. Conditions below the surface, such as depth and softness of a saturated area<br />

can then be observed. Also, by observing the moisture brought up on the probe’s surface