Your Dam Your Responsibility (PDF~1.2MB)
Your Dam Your Responsibility (PDF~1.2MB)
Your Dam Your Responsibility (PDF~1.2MB)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
9 Decommissioning of <strong>Dam</strong>s<br />
9<br />
The site should be reinstated and revegetated to a stable condition. Care should be taken<br />
to make sure that no material (usually silt) can be washed downstream or affect other<br />
dams.<br />
9.3 Maintenance of Site Until Stable<br />
A dam owner needs to check that the following questions can be answered to the<br />
satisfaction of the Licensing Authority:<br />
• Has due consideration been given to maintaining protection to safety of persons or<br />
property during abandonment works?<br />
• Is the abandoned dam likely to become a future public hazard?<br />
• Is there an environmental plan for re-instatement and/or regeneration of the<br />
inundated area?<br />
• Have inundation area and waterway erosion control measures been considered for<br />
the interim period until regeneration occurs?<br />
• Has consultation with environment authorities been undertaken and are proposed<br />
plans acceptable?<br />
• Can the dam site and inundated land be disposed of economically?<br />
45